Velarion Records
Free: one email when NPDES ILR10ZF6F changes. Unsubscribe any time.

NPDES ILR10ZF6F · Clean Water Act

BRIDGE STREET ITEP III, Channahon, IL: NPDES ILR10ZF6F discharge permit, effluent exceedances, inspections, penalties

BRIDGE STREET ITEP III, Channahon, Illinois: General permit coverage ILR10ZF6F, held by D Construction, Inc.; Construction stormwater; Effective; issued March 13, 2025, term to August 31, 2028, by IEPA.

  • April 21, 2026: Evaluation (S).

Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 2,631 were issued before ILR10ZF6F. D Construction, Inc. holds 6 permits in Illinois.

Other permits held by D Construction, Inc.

Coverages issued nearest ILR10ZF6F

BRIDGE STREET ITEP III among its neighbors

59 discharge permits are in the Du Page River subwatershed (HUC 071200040810); ILR10ZF6F is one.

Other permits in the Du Page River subwatershed (HUC 071200040810)

What stands out

  • Its term runs 3 years and 171 days, March 13, 2025 to August 31, 2028.
  • Its newest dated event on file is an inspection on April 21, 2026, 147 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 1 event for it, all in 2026.
  • It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBRIDGE STREET ITEP III
PermitteeD Construction, Inc.
NPDES IDILR10ZF6F
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 13, 2025
ExpiresAugust 31, 2028
AgencyIEPA
AddressChannahon, IL 60410
SubwatershedDu Page River (HUC 071200040810)

NPDES ILR10ZF6F: effluent limits and exceedances

BRIDGE STREET ITEP III (NPDES ILR10ZF6F): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES ILR10ZF6F: no pollutant row on file.

NPDES ILR10ZF6F: inspections, violations and enforcement

NPDES ILR10ZF6F: 1 inspection

DateWhat EPA recordedAgency
April 21, 2026EvaluationS

NPDES ILR10ZF6F (BRIDGE STREET ITEP III): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES ILR10ZF6F

NPDES ILR10ZF6F: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES ILR10ZF6F

NPDES ILR10ZF6F: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.