NPDES ILR10ZFNG · Clean Water Act
ASSURED INSULATION SOLUTIONS, Frankfort, IL: NPDES ILR10ZFNG discharge permit, effluent exceedances, inspections, penalties
ASSURED INSULATION SOLUTIONS, Frankfort, Illinois: General permit coverage ILR10ZFNG, held by 22530 Center, LLC; Construction stormwater; Effective; issued June 11, 2025, term to August 31, 2028, by IEPA.
- January 13, 2026: Evaluation (S).
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 3,102 were issued before ILR10ZFNG.
Coverages issued nearest ILR10ZFNG
- 2025-06-11: IDOT CONTRACT 62R62 APR '25 LETTING ITEM 24, BRIDGE WORK, MICHIGAN CTY RD., I-94, Dolton: ILR10ZFN9, held by Areatha Construction Co., Inc.
- 2025-06-11: IDOT CONTRACT 62W87 APR '25 LETTING ITEM 152, BRIDGE DECK; I-94, MLK DR., US 6, Chicago: ILR10ZFNA, held by Illinois Department of Transportation
- 2025-06-11: SWISSQPRINT DEVELOPMENT, West Dundee: ILR10ZFNB, held by DSI Group
- 2025-06-11: RUTH STREET APARTMENTS, Flora: ILR10ZFND, held by Grunloh Building
- 2025-06-11: SUNSET ROAD SOLAR, Gillespie: ILR10ZFNE, held by Renewable Acres
- 2025-06-11: WILDFLOWER SUBDIVISION, Litchfield: ILR10ZFNI, held by Jack Mathews Development
- 2025-06-11: STETSON PARK, Huntley: ILR10ZFO4, held by M/I Homes of Chicago, LLC
- 2025-06-11: RIHS NEW AQUATIC CENTER, Rock Island: ILR10ZFO5, held by Russell Construction
- 2025-06-11: OAKLAND AND GRAND (BASIN 5 & 6) SEWER SEPARATION PROJECT, Decatur: ILR10ZFO7, held by Entler Excavating Co., Inc.
- 2025-06-11: THE HALF MILE AT TERRA COTTA, Prairie Grove: ILR10ZFOA, held by Terra Cotta Realty Company
ASSURED INSULATION SOLUTIONS among its neighbors
24 discharge permits are in the Headwaters Jackson Creek subwatershed (HUC 071200040902); ILR10ZFNG is one.
Other permits in the Headwaters Jackson Creek subwatershed (HUC 071200040902)
- 21750 S MONI DR. (#21891), New Lenox: ILR10ZH9H, minor, term to 2028-08-31
- ASHTON ESTATES NORTH, New Lenox: ILR10ZC43, minor, term to 2028-08-31
- BAKER ROAD RECONSTRUCTION, Manhattan: ILR10ZEHR, minor, term to 2028-08-31
- CALISTOGA UNITS 2 & 3, New Lenox: ILR10ZC3Z, minor, term to 2028-08-31
- LAKES PARK, New Lenox: ILR10ZFCI, minor, term to 2028-08-31
- LAKES PARK PHASE I, New Lenox: ILR10ZG43, minor, term to 2028-08-31
- LOT 23 ~ PLANK TRAIL INDUSTRIAL CENTER, New Lenox: ILR10ZEEC, minor, term to 2028-08-31
- LOTS 18 & 19 PLANK TRAIL INDUSTRIAL CENTER, New Lenox: ILR10ZCDS, minor, term to 2028-08-31
- LOTS 8 & 9 PLANK TRAIL INDUSTRIAL CENTER, New Lenox: ILR10ZFTD, minor, term to 2028-08-31
- MCDONALD'S - NEW LENOX, IL, New Lenox: ILR10ZGFJ, minor, term to 2028-08-31
What stands out
- Its term runs 3 years and 81 days, June 11, 2025 to August 31, 2028.
- Its newest dated event on file is an inspection on January 13, 2026, 245 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ASSURED INSULATION SOLUTIONS |
|---|---|
| Permittee | 22530 Center, LLC |
| NPDES ID | ILR10ZFNG |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 11, 2025 |
| Expires | August 31, 2028 |
| Agency | IEPA |
| Address | Frankfort, IL 60423 |
| Subwatershed | Headwaters Jackson Creek (HUC 071200040902) |
NPDES ILR10ZFNG: effluent limits and exceedances
ASSURED INSULATION SOLUTIONS (NPDES ILR10ZFNG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ILR10ZFNG: no pollutant row on file.
NPDES ILR10ZFNG: inspections, violations and enforcement
NPDES ILR10ZFNG: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| January 13, 2026 | Evaluation | S |
NPDES ILR10ZFNG (ASSURED INSULATION SOLUTIONS): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES ILR10ZFNG
NPDES ILR10ZFNG: one email when its EPA record changes — $99/month.
Permits near NPDES ILR10ZFNG
NPDES ILR10ZFNG: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.