NPDES ILR10ZFRP · Clean Water Act
FOX LAKE CROSSING PHASE ONE, Fox Lake, IL: NPDES ILR10ZFRP discharge permit, effluent exceedances, inspections, penalties
FOX LAKE CROSSING PHASE ONE, Fox Lake, Illinois: General permit coverage ILR10ZFRP, held by Charles Hall Construction LLC; Construction stormwater; Effective; issued July 5, 2025, term to August 31, 2028, by IEPA.
- March 26, 2026: Evaluation (S).
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 3,231 were issued before ILR10ZFRP.
Coverages issued nearest ILR10ZFRP
- 2025-07-04: MCGOUGH SOLAR, Bennington Township: ILR10ZFRH, held by GEM Energy
- 2025-07-04: POORMAN PARKWAY SUBDIVISION, West Chicago: ILR10ZFRJ, held by Pritzker Realty Group
- 2025-07-05: ROADWAY IMPROVEMENTS - HASSELL ROAD, Hoffman Estates: ILR10ZFRK, held by ALamp Concrete Contractors, Inc.
- 2025-07-05: RUNWAY 9C GLIDESLOPE FORMING AREA REGRADING, Chicago: ILR10ZFRM, held by AECOM Hunt Clayco Bowa JV
- 2025-07-05: HOLLOW AVENUE STAGE 2 ROADWAY IMPROVEMENTS, Jerseyville: ILR10ZFRO, held by Baxmeyer Construction, Inc.
- 2025-07-05: RIDGEWOOD WEST DESIGN AND CONSTRUCTION, Bloomington: ILR10ZFRQ, held by Aruthra, LLC
- 2025-07-06: CONSTRUCT NEW BOILER ROOM/UTILITY HOUSE MENARD CORRECTIONAL, Chester: ILR10ZFRR, held by River City Construction
- 2025-07-06: JOHNSON ROAD (CH 27) OVER NIPPERSINK CREEK, BRIDGE REMOVAL AND REPLACEMENT, Hebron: ILR10ZFRS, held by TBD
- 2025-07-06: TSS46 DES PLAINES SUBSTATION EXPANSION, Des Plaines: ILR10ZFRT, held by Commonwealth Edison
- 2025-07-07: BRIGHTON RIDGE, Sugar Grove: ILR10ZFQQ, held by CalAtlantic Group, LLC
FOX LAKE CROSSING PHASE ONE among its neighbors
7 discharge permits are in the Pistakee Lake-Fox River subwatershed (HUC 071200061010); ILR10ZFRP is one.
Other permits in the Pistakee Lake-Fox River subwatershed (HUC 071200061010)
- BAXTER HEALTHCARE CORPORATION, Round Lake: IL0024074, minor, term to 2023-07-31
- CAMP HENRY HORNER STP, Ingleside: IL0054615, minor, term to 2020-06-30
- FOX LAKE NW REGIONAL WRF, Fox Lake: ILL020958, minor, term to 2025-12-31
- FOX LAKE NW REGIONAL WRF, VILLAGE OF, Fox Lake: IL0020958, major, term to 2020-03-31
- NEW STORAGE FACILITY, Lakemoor: ILR10ZFI1, minor, term to 2028-08-31
- TONYAN BROS., INC., Mchenry: ILR002210, minor, term to 2008-06-01
What stands out
- Its term runs 3 years and 57 days, July 5, 2025 to August 31, 2028.
- Its newest dated event on file is an inspection on March 26, 2026, 173 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FOX LAKE CROSSING PHASE ONE |
|---|---|
| Permittee | Charles Hall Construction LLC |
| NPDES ID | ILR10ZFRP |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 5, 2025 |
| Expires | August 31, 2028 |
| Agency | IEPA |
| Address | Fox Lake, IL 60020 |
| Subwatershed | Pistakee Lake-Fox River (HUC 071200061010) |
NPDES ILR10ZFRP: effluent limits and exceedances
FOX LAKE CROSSING PHASE ONE (NPDES ILR10ZFRP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ILR10ZFRP: no pollutant row on file.
NPDES ILR10ZFRP: inspections, violations and enforcement
NPDES ILR10ZFRP: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 26, 2026 | Evaluation | S |
NPDES ILR10ZFRP (FOX LAKE CROSSING PHASE ONE): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES ILR10ZFRP
NPDES ILR10ZFRP: one email when its EPA record changes — $99/month.
Permits near NPDES ILR10ZFRP
NPDES ILR10ZFRP: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.