FOX LAKE CROSSING PHASE ONE, Fox Lake, IL: NPDES ILR10ZFRP discharge permit, effluent exceedances, inspections, penalties

FOX LAKE CROSSING PHASE ONE, Fox Lake, Illinois: General permit coverage ILR10ZFRP, held by Charles Hall Construction LLC; Construction stormwater; Effective; issued July 5, 2025, term to August 31, 2028, by IEPA.

  • March 26, 2026: Evaluation (S).

Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 3,231 were issued before ILR10ZFRP.

Coverages issued nearest ILR10ZFRP

FOX LAKE CROSSING PHASE ONE among its neighbors

7 discharge permits are in the Pistakee Lake-Fox River subwatershed (HUC 071200061010); ILR10ZFRP is one.

Other permits in the Pistakee Lake-Fox River subwatershed (HUC 071200061010)

What stands out

  • Its term runs 3 years and 57 days, July 5, 2025 to August 31, 2028.
  • Its newest dated event on file is an inspection on March 26, 2026, 173 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 1 event for it, all in 2026.
  • It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFOX LAKE CROSSING PHASE ONE
PermitteeCharles Hall Construction LLC
NPDES IDILR10ZFRP
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 5, 2025
ExpiresAugust 31, 2028
AgencyIEPA
AddressFox Lake, IL 60020
SubwatershedPistakee Lake-Fox River (HUC 071200061010)

NPDES ILR10ZFRP: effluent limits and exceedances

FOX LAKE CROSSING PHASE ONE (NPDES ILR10ZFRP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES ILR10ZFRP: no pollutant row on file.

NPDES ILR10ZFRP: inspections, violations and enforcement

NPDES ILR10ZFRP: 1 inspection

DateWhat EPA recordedAgency
March 26, 2026EvaluationS

NPDES ILR10ZFRP (FOX LAKE CROSSING PHASE ONE): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES ILR10ZFRP

NPDES ILR10ZFRP: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES ILR10ZFRP

NPDES ILR10ZFRP: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.