CORE - CHAMPAIGN, PHASE 2, Champaign, IL: NPDES ILR10ZG8P discharge permit, effluent exceedances, inspections, penalties
CORE - CHAMPAIGN, PHASE 2, Champaign, Illinois: General permit coverage ILR10ZG8P, held by Power Construction; Construction stormwater; Effective; issued November 13, 2025, term to August 31, 2028, by IEPA.
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 3,819 were issued before ILR10ZG8P. Power Construction holds 8 permits in Illinois.
Other permits held by Power Construction
- PARKING GARAGE, TEMP LOTS 4B/11, PAVILION EXPANSION, Lake Forest: ILR10ZBZN, issued 2023-08-11
- HOLLYWOOD AURORA HOTEL AND CASINO, Aurora: ILR10ZDMC, issued 2024-01-06
- KELLOGG EDUCATION CENTER, Evanston: ILR10ZEY1, issued 2025-01-22
- NORTHEASTERN ILLINOIS UNIVERSITY - EDUCATION BUILDING, Chicago: ILR10ZFBO, issued 2025-04-08
- ADVOCATE NEW TRINITY HOSPITAL, Chicago: ILR10ZGX0, issued 2026-05-03
- US COLD STORAGE - WILMINGTON, Wilmington: ILR10ZGYB, issued 2026-05-15
- AAH LUTHERAN GENERAL HOSPITAL COMPREHENSIVE CANCER CENTER, Park Ridge: ILR10ZH8V, issued 2026-08-01
Coverages issued nearest ILR10ZG8P
- 2025-11-12: MARBLEHEAD N TRANSMISSION LINE REBUILD PROJECT, Quincy: ILR10ZGAG, held by TBD
- 2025-11-12: SOUTH QUINCY TRANSMISSION LINE REBUILD PROJECT, Quincy: ILR10ZGAH, held by TBD
- 2025-11-12: ST. ANTHONY TRANSMISSION LINE REBUILD PROJECT, Quincy: ILR10ZGAI, held by TBD
- 2025-11-12: SHELL STATION, Pontiac: ILR10ZGAJ, held by Heidner Properties
- 2025-11-12: TPE IL MH459, LLC, Woodstock: ILR10ZGAK, held by Knobelsdorff Energy, LLC
- 2025-11-13: LOCKPORT EAST SOLAR, Lockport: ILR10ZGAM, held by Pepper Energy, LLC
- 2025-11-13: LOCKPORT WEST SOLAR, Lockport: ILR10ZGAN, held by Pepper Energy, LLC
- 2025-11-13: CHRIST COMMUNITY CHURCH - PRAYER PATH IMPROVEMENTS, South Elgin: ILR10ZGAO, held by G'Fellers Construction & Design
- 2025-11-13: NORTHWEST SOLAR, LLC CUMBERLAND CO, Neoga Township: ILR10ZGAQ, held by Shelby Solar Energy Center, LLC
- 2025-11-13: 4002 S MORGAN STREET, Chicago: ILR10ZGAR, held by Arco Murray
CORE - CHAMPAIGN, PHASE 2 among its neighbors
34 discharge permits are in the Crystal Lake-Saline Branch Drainage Ditch subwatershed (HUC 051201090202); ILR10ZG8P is one.
Other permits in the Crystal Lake-Saline Branch Drainage Ditch subwatershed (HUC 051201090202)
- 1001 SALINE COURT - WINTER FILL TANKS, Urbana: ILR10ZCC9, minor, term to 2028-08-31
- 211 N. RACE STREET DEMOLITION & SITE REMEDIATION SECTION 23-00670-00-BD, Urbana: ILR10ZF6W, minor, term to 2028-08-31
- 310 CHALMERS, Champaign: ILR10ZG8H, minor, term to 2028-08-31
- 3100 N. LINCOLN AVE - URBANA, Urbana: ILR10ZFFM, minor, term to 2028-08-31
- 401 MOSAIC, Champaign: ILR10ZGDN, minor, term to 2028-08-31
- 407 & 409 W UNIVERSITY AVE CARLE FOUNDATION DEMO, Urbana: ILR10ZFU0, minor, term to 2028-08-31
- ADVANCED FILTRATION SYSTEMS, Champaign: ILR000838, minor, term to 2008-06-01
- ASSOCIATED TRANSFER & STORAGE, Champaign: ILR002528, minor, term to 2008-06-01
- BRISTOL PLACE - SENIOR RESIDENCES, Champaign: ILR10ZEA9, minor, term to 2028-08-31
- CANADIAN NATIONAL / IL CENTRAL RAILROAD, Champaign: IL0004545, minor, term to 2022-07-31
What stands out
- Its term runs 2 years and 292 days, November 13, 2025 to August 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CORE - CHAMPAIGN, PHASE 2 |
|---|---|
| Permittee | Power Construction |
| NPDES ID | ILR10ZG8P |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 13, 2025 |
| Expires | August 31, 2028 |
| Agency | IEPA |
| Address | Champaign, IL 61874 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Crystal Lake-Saline Branch Drainage Ditch (HUC 051201090202) |
NPDES ILR10ZG8P: effluent limits and exceedances
CORE - CHAMPAIGN, PHASE 2 (NPDES ILR10ZG8P): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ILR10ZG8P: no pollutant row on file.
NPDES ILR10ZG8P: inspections, violations and enforcement
NPDES ILR10ZG8P (CORE - CHAMPAIGN, PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ILR10ZG8P
NPDES ILR10ZG8P: one email when its EPA record changes — $99/month.
Permits near NPDES ILR10ZG8P
NPDES ILR10ZG8P: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.