NPDES ILR10ZGPC · Clean Water Act
120TH YARD AND SHOP - ADVANCE EARTHWORK, Chicago, IL: NPDES ILR10ZGPC discharge permit, effluent exceedances, inspections, penalties
120TH YARD AND SHOP - ADVANCE EARTHWORK, Chicago, Illinois: General permit coverage ILR10ZGPC, held by Walsh Construction; Construction stormwater; Effective; issued March 25, 2026, term to August 31, 2028, by IEPA.
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 4,332 were issued before ILR10ZGPC. Walsh Construction holds 4 permits in Illinois.
Other permits held by Walsh Construction
- PROJECT POST PHASE 2 - CHI06, Hoffman Estates: ILR10ZEZS, issued 2024-12-18
- 4836_R: I-294 SOUTH BOUND MILE POST 30.5 TO 32.4, Berkeley: ILR10ZF59, issued 2025-03-05
- ONE WINNETKA, Winnetka: ILR10ZFFF, issued 2025-05-07
Coverages issued nearest ILR10ZGPC
- 2026-03-24: CF IL SOLAR W. MAIN ST., FARMERSVILLE LLC, Farmersville: ILR10ZGP9, held by Arch Electric, Inc.
- 2026-03-25: COOL VALLEY DR DRAINAGE, Belleville: ILR10ZGHX, held by Baxmeyer Construction, Inc.
- 2026-03-25: REHABILITATE TAXIWAY A - PHASE 1, Kankakee: ILR10ZGOF, held by Kankakee Valley Construction Company, Inc.
- 2026-03-25: BURLINGTON AVENUE REALIGNMENT, Westmont: ILR10ZGPA, held by A Lamp Concrete Contractors, Inc.
- 2026-03-25: CEDAR LAKE ESTATES, Lake Villa: ILR10ZGPB, held by CalAtlantic Group, LLC
- 2026-03-25: 66K71, Sheffield: ILR10ZGPD, held by D Construction
- 2026-03-25: INDUSTRIAL DRIVE RECONSTRUCTION, Bensenville: ILR10ZGPE, held by Village of Bensenville
- 2026-03-25: BETHEL GROVE SUBDIVISION, O'Fallon: ILR10ZGPF, held by State Construction
- 2026-03-25: PROJECT CHIEFS, Montgomery: ILR10ZGPG, held by Development Solutions, Inc
- 2026-03-25: 72G90, Pana: ILR10ZGPH, held by Illinois Valley Paving, a div of UCM, Inc.
120TH YARD AND SHOP - ADVANCE EARTHWORK among its neighbors
52 discharge permits are in the Grand Calumet River-Little Calumet River subwatershed (HUC 071200030407); ILR10ZGPC is one.
Other permits in the Grand Calumet River-Little Calumet River subwatershed (HUC 071200030407)
- 1717 SUMMER ST - TEMPORARY TRUCK PARKING, Hammond: INRA15169, minor, term to 2029-12-17
- 2022 PAVEMENT REHABILITATION PROGRAM - SOUTH CORRIDORS PACKAGE 2, Orland Park: ILR10ZGBC, minor, term to 2028-08-31
- ARDAGH GLASS INC, Dolton: ILR003551, minor, term to 2008-06-01
- ASHLAND CHEM. INC. SP&A DIV., Calumet City: ILR001047, minor, term to 2008-06-01
- AZCON CORP.-CHICAGO, Chicago: ILR002806, minor, term to 2008-06-01
- BEAUBIEN WOODS, Chicago: ILR10ZGRS, minor, term to 2028-08-31
- BURNHAM CSOS, VILLAGE OF, Burnham: ILM580018, minor, term to 2008-05-31
- CALUMET CITY CSOS, Calumet City: ILM580025, minor, term to 2008-05-31
- CALUMET CITY USEDA INDUSTRIAL PARK, Calumet City: ILR10ZDBH, minor, term to 2028-08-31
- CALUMET PARK CSOS, VILLAGE OF, Calumet Park: ILM580016, minor, term to 2008-05-31
What stands out
- Its term runs 2 years and 159 days, March 25, 2026 to August 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 120TH YARD AND SHOP - ADVANCE EARTHWORK |
|---|---|
| Permittee | Walsh Construction |
| NPDES ID | ILR10ZGPC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 25, 2026 |
| Expires | August 31, 2028 |
| Agency | IEPA |
| Address | Chicago, IL 60628 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Grand Calumet River-Little Calumet River (HUC 071200030407) |
NPDES ILR10ZGPC: effluent limits and exceedances
120TH YARD AND SHOP - ADVANCE EARTHWORK (NPDES ILR10ZGPC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ILR10ZGPC: no pollutant row on file.
NPDES ILR10ZGPC: inspections, violations and enforcement
NPDES ILR10ZGPC (120TH YARD AND SHOP - ADVANCE EARTHWORK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ILR10ZGPC
NPDES ILR10ZGPC: one email when its EPA record changes — $99/month.
Permits near NPDES ILR10ZGPC
NPDES ILR10ZGPC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.