IPL HARDING ST GENERATING STATION, Indianapolis, IN: NPDES IN0004685 discharge permit, effluent exceedances, inspections, penalties

IPL HARDING ST GENERATING STATION, Indianapolis, Indiana: Individual permit IN0004685, held by IPL - HARDING ST GENERATING STATION; Administratively continued; issued September 29, 2017, term to September 30, 2022, by IDEM; discharges to W FK WHITE R & WHITE LICK CREEK; Other Electric Power Generation.

12 of the 36 pollutants listed for NPDES IN0004685 have no violation or effluent exceedance.

  • Iron, total recoverable: 10 limits, 30 violations of any kind, 16 effluent exceedances, latest November 30, 2019, largest 130% over the limit.
  • Oxidants, total residual: 6 limits, 35 violations of any kind, 6 effluent exceedances, latest September 30, 2023, largest 100% over the limit.
  • Toxicity [chronic], Ceriodaphnia dubia: 0 limits, 5 violations of any kind, 5 effluent exceedances, latest July 31, 2025, largest 100% over the limit.
  • Temperature, water deg. fahrenheit: 18 limits, 174 violations of any kind, 3 effluent exceedances, latest July 31, 2012, largest 8% over the limit.
  • Solids, total suspended: 22 limits, 29 violations of any kind, 3 effluent exceedances, latest October 31, 2017, largest 76% over the limit.
  • pH: 22 limits, 32 violations of any kind, 2 effluent exceedances, latest May 31, 2013.
  • Copper, total recoverable: 26 limits, 25 violations of any kind, 2 effluent exceedances, latest September 30, 2017, largest 33% over the limit.
  • Mercury, total recoverable: 14 limits, 18 violations of any kind, 2 effluent exceedances, latest October 31, 2017, largest 123% over the limit.
  • Oil & Grease: 0 limits, 12 violations of any kind, 2 effluent exceedances, latest March 31, 1996, largest 115% over the limit.
  • Chlorine, total residual: 15 limits, 10 violations of any kind, 2 effluent exceedances, latest September 30, 2023, largest 70% over the limit.
  • Chlorination duration: 5 limits, 4 violations of any kind, 2 effluent exceedances, latest June 30, 2016, largest 200% over the limit.
  • Flow, in conduit or thru treatment plant: 10 limits, 36 violations of any kind.
  • Streamflow: 6 limits, 28 violations of any kind.
  • Duration of discharge: 0 limits, 22 violations of any kind.
  • Oil and grease, hexane extr method: 22 limits, 14 violations of any kind.
  • Iron, total [as Fe]: 0 limits, 10 violations of any kind.
  • Zinc, total recoverable: 16 limits, 2 violations of any kind.
  • Selenium, total recoverable: 8 limits, 2 violations of any kind.
  • Cadmium, total recoverable: 8 limits, 2 violations of any kind.
  • Chlorination frequency: 5 limits, 2 violations of any kind.
  • Chromium, total recoverable: 4 limits, 2 violations of any kind.
  • Chloride [as Cl]: 2 limits, 2 violations of any kind.
  • Flow, total: 5 limits, 1 violation of any kind.
  • Chlorine, total residual [dsg. time]: 4 limits, 1 violation of any kind.
  • Sulfate, total [as SO4]: 14 limits.
  • Arsenic, total recoverable: 14 limits.
  • Nickel, total recoverable: 14 limits.
  • Chemical Oxygen Demand [COD]: 12 limits.
  • Storm water flow: 12 limits.
  • Nitrogen, ammonia total [as N]: 2 limits.
  • Phosphorus, total [as P]: 2 limits.
  • Boron, total recoverable: 2 limits.
  • Aluminum, total [as Al]: 2 limits.
  • Lead, total recoverable: 2 limits.
  • Manganese, total recoverable: 2 limits.
  • Solids, total dissolved: 2 limits.
  • February 25, 2026: Evaluation (S).
  • February 25, 2026: Evaluation (S).

IPL HARDING ST GENERATING STATION among its neighbors

17 discharge permits are in the Bear Creek-Pipe Creek subwatershed (HUC 051201011507); IN0004685 is one. Its county: 277, 6 major; IN0004685 is major permit.

Other permits in the Bear Creek-Pipe Creek subwatershed (HUC 051201011507)

What stands out

  • Its term runs 5 years and 1 day, September 29, 2017 to September 30, 2022; the term ended 1,475 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an inspection on February 25, 2026, 231 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 2 inspections.
  • EPA's file dates 2 events for it, all in 2026.
  • 11 of its 36 pollutants on file have an effluent exceedance (31%); 32 are under a numeric limit; the largest exceedance is Chlorination duration at 200% over its limit.
  • It is one of 13,164 discharge permits on the register in Indiana; the file names no program for it, and it is a major discharger.

Identity

FacilityIPL HARDING ST GENERATING STATION
PermitteeIPL - HARDING ST GENERATING STATION
NPDES IDIN0004685
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typeNon-POTW
IssuedSeptember 29, 2017
ExpiresSeptember 30, 2022
AgencyIDEM
AddressIndianapolis, IN 46217
Receiving waterW FK WHITE R & WHITE LICK CREEK
Receiving water impaired303(D) Listed
SubwatershedBear Creek-Pipe Creek (HUC 051201011507)
NAICS221118 – Other Electric Power Generation
SIC4911 – Electric Services
Other EPA IDs (FRS)RCRA handler IND000806901; ICIS-AIR source IN0000001809700033

NPDES IN0004685: effluent limits and exceedances

IPL HARDING ST GENERATING STATION (NPDES IN0004685): 36 pollutants on file, 32 limited; 24 with a violation of any kind, 11 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Iron, total recoverable103016November 30, 2019130% over the limit
Oxidants, total residual6356September 30, 2023100% over the limit
Toxicity [chronic], Ceriodaphnia dubia055July 31, 2025100% over the limit
Temperature, water deg. fahrenheit181743July 31, 20128% over the limit
Solids, total suspended22293October 31, 201776% over the limit
pH22322May 31, 2013
Copper, total recoverable26252September 30, 201733% over the limit
Mercury, total recoverable14182October 31, 2017123% over the limit
Oil & Grease0122March 31, 1996115% over the limit
Chlorine, total residual15102September 30, 202370% over the limit
Chlorination duration542June 30, 2016200% over the limit
Flow, in conduit or thru treatment plant10360
Streamflow6280
Duration of discharge0220
Oil and grease, hexane extr method22140
Iron, total [as Fe]0100
Zinc, total recoverable1620
Selenium, total recoverable820
Cadmium, total recoverable820
Chlorination frequency520
Chromium, total recoverable420
Chloride [as Cl]220
Flow, total510
Chlorine, total residual [dsg. time]410
Sulfate, total [as SO4]1400
Arsenic, total recoverable1400
Nickel, total recoverable1400
Chemical Oxygen Demand [COD]1200
Storm water flow1200
Nitrogen, ammonia total [as N]200
Phosphorus, total [as P]200
Boron, total recoverable200
Aluminum, total [as Al]200
Lead, total recoverable200
Manganese, total recoverable200
Solids, total dissolved200

NPDES IN0004685: inspections, violations and enforcement

NPDES IN0004685: 2 inspections

DateWhat EPA recordedAgency
February 25, 2026EvaluationS
February 25, 2026EvaluationS

NPDES IN0004685 (IPL HARDING ST GENERATING STATION): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES IN0004685

NPDES IN0004685: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IN0004685

NPDES IN0004685: 36 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.