NPDES INR10K404 · Clean Water Act
U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774), Lafayette, IN: NPDES INR10K404 discharge permit, effluent exceedances, inspections, penalties
U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774), Lafayette, Indiana: Individual permit INR10K404, held by U.S. 52 Bridge Replacement over the Wabash River (Des 0400774); Construction stormwater; Administratively continued; issued July 9, 2015, term to July 7, 2020, by IDEM.
Indiana holds 1,542 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before INR10K404.
Coverages issued nearest INR10K404
- 2015-05-28: INDOT DES 0800285 PACKAGE 4, SECTION 1, I-69 INDY TO EVANSVILLE, Elberfeld: INR10C156, held by INDOT DES 0800285 Package 4, Section 1, I-69 Indy to Evansville
- 2015-05-29: I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES, Bloomington: INR10K168, held by I 69 Section 5, Fullerton Pike Realignment and Interchange, Walnut Street Acces
- 2015-05-29: I69 SECTION 5, DU 3A- VERNAL PIKE, OVERPASS STRUCTURE AND ASSOCIATED ROADS DES, Bloomington: INR10K170, held by I69 Section 5, DU 3A- Vernal Pike, Overpass Structure and Associated Roads DES
- 2015-06-05: INTERSTATE 69 SECTION 5, KINSER PIKE ROAD OVERPASS AND REALIGNMENT, Bloomington: INR10K206, held by Interstate 69 Section 5, Kinser Pike Road Overpass and Realignment
- 2015-06-27: GRANNAN GROVE, Carmel: INR10K354, held by Grannan Grove
- 2015-07-18: INDOT DES #0902174 NEW I-69, CONTRACT IR-33047A PHASE 1A, Washington: INR10C743, held by INDOT Des #0902174 New I-69, Contract IR-33047A Phase 1A
- 2015-07-23: INTERSTATE 69 SECTION 5, DU 4 A1- MAINLINE REHABILITATION STA. 215-504, Bloomington: INR10K487, held by Interstate 69 Section 5, DU 4 A1- Mainline Rehabilitation Sta. 215-504
- 2015-07-24: TERRA VISTA SUBDIVISION, Evansville: INR10K496, held by Terra Vista Subdivision
- 2015-07-24: CARRIAGE ESTATES II WASTEWATER TREATMENT PLANT EXPANSION, West Lafayette: INR10K513, held by Carriage Estates II Wastewater Treatment Plant Expansion
- 2015-07-30: REPLACEMENT OF STRUCTURES 026-79-09955 (DES 9608220), Lafayette: INR10K542, held by Replacement of Structures 026-79-09955 (Des 9608220)
U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774) among its neighbors
84 discharge permits are in the Cedar Hollow-Wabash River subwatershed (HUC 051201080203); INR10K404 is one. Its county: 90, 6 major; INR10K404 is minor permit.
Other permits in the Cedar Hollow-Wabash River subwatershed (HUC 051201080203)
- 19016.4 LOT 1 WESTBAKER INDUSTRIAL SUBDIVISION, Lafayette: INRA17930, minor, term to 2031-04-12
- 21042 OMALLEY FOWLER VINE, West Lafayette: INRA11466, minor, term to 2028-03-21
- 21077 TIPPECANOE SCHOOL CORPORATION SERVICE CENTER, Lafayette: INRA08937, minor, term to 2026-12-17
- 21078-TEIBEL S 4TH STREET, Lafayette: INRA13001, minor, term to 2028-12-18
- 21099 LEVEE REDEVELOPMENT, West Lafayette: INRA12785, minor, term to 2028-10-30
- 23085 PUB SITE, Lafayette: INRA17407, minor, term to 2031-01-12
- 24001 - WESLEY FOUNDATION, West Lafayette: INRA16019, minor, term to 2030-05-12
- 5342-C.40.11418-AHLERS DR, West Lafayette: INRA13554, minor, term to 2029-03-21
- 631 MAIN STREET, Lafayette: INRA06324, minor, term to 2025-10-04
- 7252 THE GROTTO SUBDIVISION, West Lafayette: INRA07790, minor, term to 2026-06-15
What stands out
- Its term runs 4 years and 364 days, July 9, 2015 to July 7, 2020; the term ended 2,261 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,164 discharge permits on the register in Indiana; 9,355 of them (71%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774) |
|---|---|
| Permittee | U.S. 52 Bridge Replacement over the Wabash River (Des 0400774) |
| NPDES ID | INR10K404 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 9, 2015 |
| Expires | July 7, 2020 |
| Agency | IDEM |
| Address | Lafayette, IN 47904 |
| Subwatershed | Cedar Hollow-Wabash River (HUC 051201080203) |
NPDES INR10K404: effluent limits and exceedances
U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774) (NPDES INR10K404): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES INR10K404: no pollutant row on file.
NPDES INR10K404: inspections, violations and enforcement
NPDES INR10K404 (U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES INR10K404
NPDES INR10K404: one email when its EPA record changes — $99/month.
Permits near NPDES INR10K404
NPDES INR10K404: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.