DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT, West Terre Haute, IN: NPDES INRA05753 discharge permit, effluent exceedances, inspections, penalties
DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT, West Terre Haute, Indiana: Individual permit INRA05753, held by Ivan Karpov, Duke Energy Indiana LLC; Construction stormwater; Administratively continued; issued April 8, 2020, term to April 7, 2025, by State.
Indiana holds 1,542 Construction stormwater coverages of this permit type in EPA’s file; 207 were issued before INRA05753. Ivan Karpov, Duke Energy Indiana LLC holds 2 permits in Indiana.
Other permits held by Ivan Karpov, Duke Energy Indiana LLC
- DUKE ENERGY WABASH RIVER STATION NORTH ASH POND CLOSURE PROJECT, West Terre Haute: INRA06386, issued 2020-09-22
Coverages issued nearest INRA05753
- 2020-03-09: GOECKER HOUSING DEVELOPMENT, Seymour: INRA05163, held by Chad Goeker
- 2020-03-10: MOUNT COMFORT LOGISTICS CENTER BUILDING 1, Mount Comfort: INRA05183, held by Scott Sanders, Ambrose Mount Comfot I, LLC
- 2020-03-16: BLUE LAKE CLEAN FILL DISPOSAL SITE TRAILER PARK ANNEX, Indianapolis: INRA05198, held by Blue Lake Development Inc
- 2020-03-24: BARRINGTON LAKES SUBDIVISION, Lafayette: INRA05287, held by Darrin Sorenson
- 2020-03-31: STYLINE DRIVE CONSTRUCTION SPOIL AREA, Huntingburg: INRA05262, held by Jon Menke, OFS Brands Holdings, Inc.
- 2020-04-16: WESTBAKER INDUSTRIAL SUBDIVISION, Lafayette: INRA05351, held by C. Jeffrey Mahan, Tecspan Concrete Structures, LLC
- 2020-04-16: BRACKNEY INCORPORATED BUILDING MATERIAL SUPPLY OR STORAGE YARD, Brookville: INRA05369, held by Mark E Branckney, Branckney Incorporated
- 2020-04-17: NOBLE EAST SECTION 1, Noblesville: INR10J937, held by Noble East Section 1
- 2020-04-20: MILESTONE SR 445 BATCH PLANT STORAGE AREA, Bloomfield: INRA05415, held by Robert Rood, Milestone Contractors Limited Partnership
- 2020-04-24: HOPF EQUIPMENT, Evansville: INRA05385, held by Mike Hopf, Hopf Equipment
DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT among its neighbors
42 discharge permits are in the Izaak Walton Lake-Wabash River subwatershed (HUC 051201110605); INRA05753 is one. Its county: 74, 4 major; INRA05753 is minor permit.
Other permits in the Izaak Walton Lake-Wabash River subwatershed (HUC 051201110605)
- 342-829 ISU CENTER FOR TECHNOLOGY ENGINEERING AND DESIGN, Terre Haute: INRA14801, minor, term to 2029-10-08
- ABC PAVING PARKING LOT EXPANSION, Terre Haute: INRA14037, minor, term to 2029-06-09
- ATHLETIC VILLAGE, Terre Haute: INRA15156, minor, term to 2029-12-15
- ATHLETIC VILLAGE, Terre Haute: INRA17177, minor, term to 2030-11-17
- BRITTLEBANK PARK, Terre Haute: INRA08780, minor, term to 2026-11-21
- BRYANT INDUSTRIES, Terre Haute: INRM03123, minor, term to 2029-10-14
- CITY OF TERRE HAUTE DEPT OF REDVELOPMENT SOUTH WESTSIDE AREA SWA-2P, Terre Haute: INRA11440, minor, term to 2028-03-19
- CITY OF TERRE HAUTE SOUTH WESTSIDE AREA SWA-2M, Terre Haute: INRA09463, minor, term to 2027-04-05
- COURTYARD TERRE HAUTE, Terre Haute: INRA15673, minor, term to 2030-04-09
- DRAKE'S RESTAURANT, Terre Haute: INRA13303, minor, term to 2029-02-25
What stands out
- Its term runs 4 years and 364 days, April 8, 2020 to April 7, 2025; the term ended 526 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,164 discharge permits on the register in Indiana; 9,355 of them (71%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT |
|---|---|
| Permittee | Ivan Karpov, Duke Energy Indiana LLC |
| NPDES ID | INRA05753 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 8, 2020 |
| Expires | April 7, 2025 |
| Agency | State |
| Address | West Terre Haute, IN 47885 |
| Subwatershed | Izaak Walton Lake-Wabash River (HUC 051201110605) |
NPDES INRA05753: effluent limits and exceedances
DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT (NPDES INRA05753): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES INRA05753: no pollutant row on file.
NPDES INRA05753: inspections, violations and enforcement
NPDES INRA05753 (DUKE ENERGY WABASH RIVER STATION SOUTH ASH POND SYSTEM CLOSURE PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES INRA05753
NPDES INRA05753: one email when its EPA record changes — $99/month.
Permits near NPDES INRA05753
NPDES INRA05753: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.