NPDES INRA12973 · Clean Water Act
INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL, Fort Wayne, IN: NPDES INRA12973 discharge permit, effluent exceedances, inspections, penalties
INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL, Fort Wayne, Indiana: General permit coverage INRA12973, held by Jennifer Walker; Construction stormwater; Effective; issued December 19, 2023, term to December 18, 2028, by State.
Indiana holds 7,813 Construction stormwater coverages of this permit type in EPA’s file; 2,716 were issued before INRA12973. Jennifer Walker holds 18 permits in Indiana.
Other permits held by Jennifer Walker
- BETHEL-DELAWARE 69KV LINE, Muncie: INRA12935, issued 2023-12-05
- DRAGOON 138KV TRANSMISSION LINE RECONDUCTOR, Mishawaka: INRA14483, issued 2024-08-21
- COLONY BAY - MCKINLEY TRANSMISSION LINE REBUILD, Fort Wayne: INRA14680, issued 2024-09-19
- REED STATION, Fort Wayne: INRA14834, issued 2024-10-18
- DUMONT - OLIVE 345 KV CUT-IN SBN 201, New Carlisle: INRA14931, issued 2024-10-31
- BOUNDARY STATION, South Bend: INRA14954, issued 2024-11-04
- WESTERN FORT WAYNE - PHASE 3, Fort Wayne: INRA15257, issued 2025-01-15
- TEUTSCH STATION, Butler: INRA15838, issued 2025-04-22
- VIRTUE STATION, Avilla: INRA15864, issued 2025-04-30
- EAST ELKHART 138KV NIPSCO INTERCONNECTION PROJECT, Bristol: INRA16240, issued 2025-06-13
Coverages issued nearest INRA12973
- 2023-12-18: FRANKLIN ESTATES, Merrillville: INRA12740, held by Terrance Franklin
- 2023-12-18: CLIFTON TRACE SECTION 2, Indianapolis: INRA12993, held by Craig Jensen
- 2023-12-18: NEW ENERGY DRIVE COMMERCIAL BUILDING, South Bend: INRA12996, held by Steve Henry
- 2023-12-18: FRIENDSHIP STATE BANK, Bright: INRA12997, held by Christopher Meyer
- 2023-12-18: THE JACOB, Southport: INRA13000, held by Shelby Bowen
- 2023-12-19: ABERDEEN SECTION 8, Bargersville: INRA12985, held by Mike Duke
- 2023-12-19: 21078-TEIBEL S 4TH STREET, Lafayette: INRA13001, held by John Teibel
- 2023-12-19: MERIDIAN ENCLAVE, Indianapolis: INRA13007, held by Joshua Dubach
- 2023-12-20: PEACE LUTHERAN CHURCH, Fremont: INRA12967, held by Chad Korte
- 2023-12-20: SHIRE GLEN SUBDIVISION PHASE II, LOTS 3, 7, & 8, Bloomington: INRA13008, held by Antonette Moseman
INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL among its neighbors
47 discharge permits are in the Becketts Run-Saint Joseph River subwatershed (HUC 041000030806); INRA12973 is one.
Other permits in the Becketts Run-Saint Joseph River subwatershed (HUC 041000030806)
- 1448 NORTHLAND BLVD - OASIS, Fort Wayne: INRA16636, minor, term to 2030-08-17
- 2025 NEW BUILDING, Fort Wayne: INRA17126, minor, term to 2030-11-05
- 243853 - KHATANA PROPERTY, Fort Wayne: INRA15632, minor, term to 2030-03-23
- BACKNINE COMMERCIAL PARK, Fort Wayne: INRA16382, minor, term to 2030-07-06
- BEST LIFE NOW, Fort Wayne: INRA17197, minor, term to 2030-11-19
- BISHOP DWENGER EXPANSION, Fort Wayne: INRA17045, minor, term to 2030-10-22
- BROTHERHOOD MUTUAL 2026 NORTH PARKING LOT, Fort Wayne: INRA18668, minor, term to 2031-08-05
- BUSSICK ORTHODONTICS OFFICE, Fort Wayne: INRA09785, minor, term to 2027-05-24
- CARRIAGE HOUSE APARTMENTS FORT WAYNE, Fort Wayne: INRA18254, minor, term to 2031-05-31
- CONCORDIA CAMPUS IMPROVEMENTS - GROUNDS BUILDING, Fort Wayne: INRA17397, minor, term to 2031-01-08
What stands out
- Its term runs 4 years and 365 days, December 19, 2023 to December 18, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,164 discharge permits on the register in Indiana; 9,355 of them (71%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL |
|---|---|
| Permittee | Jennifer Walker |
| NPDES ID | INRA12973 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 19, 2023 |
| Expires | December 18, 2028 |
| Agency | State |
| Address | Fort Wayne, IN 46809 |
| Subwatershed | Becketts Run-Saint Joseph River (HUC 041000030806) |
NPDES INRA12973: effluent limits and exceedances
INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL (NPDES INRA12973): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES INRA12973: no pollutant row on file.
NPDES INRA12973: inspections, violations and enforcement
NPDES INRA12973 (INDUSTRIAL PARK TO WALLEN STATION TRANSMISSION LINE REMOVAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES INRA12973
NPDES INRA12973: one email when its EPA record changes — $99/month.
Permits near NPDES INRA12973
NPDES INRA12973: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.