NPDES KYR10T033 · Clean Water Act
PHASE 6 - TOP FLIGHT SUBDIVISION, Taylorsville, KY: NPDES KYR10T033 discharge permit, effluent exceedances, inspections, penalties
PHASE 6 - TOP FLIGHT SUBDIVISION, Taylorsville, Kentucky: General permit coverage KYR10T033, held by Phase 6 - Top Flight Subdivision; Construction stormwater; Effective; issued January 3, 2025, term to December 31, 2029, by KY DEP; discharges to Buck Creek.
- February 10, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- February 10, 2025: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 38 were issued before KYR10T033.
Coverages issued nearest KYR10T033
- 2025-01-03: MEADOW LAND STREAM MITIGATION BANK, Union: KYR10T004, held by Meadow Land Stream Mitigation Bank
- 2025-01-03: NORWOOD JUNCTION-SHOPVILLE 69KV LINE REBUILD PROJECT, Somerset: KYR10T006, held by Norwood Junction-Shopville 69kV Line Rebuild Project
- 2025-01-03: EGG BARN, Payneville: KYR10T009, held by Egg Barn
- 2025-01-03: 1447 LEVERING STREET WAREHOUSES, Louisville: KYR10T010, held by 1447 Levering Street Warehouses
- 2025-01-03: PARTRIDGE RUN - SECTION 4, Shelbyville: KYR10T018, held by Partridge Run - Section 4
- 2025-01-04: HUNTER'S RIDGE PHASE 4, Burlington: KYR10T013, held by Hunter's Ridge Phase 4
- 2025-01-04: HARRISON AVE SMRP (SAFETY MODIFICATION REPLACEMENT PROGRAM), Mount Sterling: KYR10T020, held by Harrison Ave SMRP (Safety Modification Replacement Program)
- 2025-01-05: KENTUCKY EAGLE EXPANSION, Bowling Green: KYR10T001, held by Kentucky Eagle Expansion
- 2025-01-05: STARBUCKS AT ATHENS SOUTH, Lexington: KYR10T002, held by Starbucks at Athens South
- 2025-01-05: HARDIN COUNTY CHILD NUTRITION, Elizabethtown: KYR10T003, held by Hardin County Child Nutrition
PHASE 6 - TOP FLIGHT SUBDIVISION among its neighbors
8 discharge permits are in the Buck Creek-Brashears Creek subwatershed (HUC 051401020504); KYR10T033 is one. Its county: 68, 0 major; KYR10T033 is minor permit.
Other permits in the Buck Creek-Brashears Creek subwatershed (HUC 051401020504)
- 05-80004.00, Shelbyville: KYR10T506, minor, term to 2029-12-31
- FINCHVILLE BAPTIST CHURCH, Finchville: KYG405115, minor, term to 2028-08-31
- GREG HOCKENBURY RESIDENCE, Taylorsville: KYG403121, minor, term to 2023-08-31
- HELEN PITTS BLASI RESIDENCE, Finchville: KYG404237, minor, term to 2028-08-31
- ROBERT DAVIS RESIDENCE, Louisville: KYG403189, minor, term to 2023-08-31
- SILVIA MOHAGH RESIDENCE, Shelbyville: KYG405555, minor, term to 2028-08-31
- TOP FLIGHT WWTP, Taylorsville: KY0105074, minor, term to 2023-12-31
What stands out
- Its term runs 4 years and 362 days, January 3, 2025 to December 31, 2029.
- Its newest dated event on file is a single-event violation on February 10, 2025, 582 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 2 events for it, all in 2025.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PHASE 6 - TOP FLIGHT SUBDIVISION |
|---|---|
| Permittee | Phase 6 - Top Flight Subdivision |
| NPDES ID | KYR10T033 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 3, 2025 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Taylorsville, KY 40071 |
| Receiving water | Buck Creek |
| Subwatershed | Buck Creek-Brashears Creek (HUC 051401020504) |
NPDES KYR10T033: effluent limits and exceedances
PHASE 6 - TOP FLIGHT SUBDIVISION (NPDES KYR10T033): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10T033: no pollutant row on file.
NPDES KYR10T033: inspections, violations and enforcement
NPDES KYR10T033: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| February 10, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| February 10, 2025 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
NPDES KYR10T033 (PHASE 6 - TOP FLIGHT SUBDIVISION): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10T033
NPDES KYR10T033: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10T033
NPDES KYR10T033: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.