NPDES KYR10T151 · Clean Water Act
DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION, Louisville, KY: NPDES KYR10T151 discharge permit, effluent exceedances, inspections, penalties
DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION, Louisville, Kentucky: General permit coverage KYR10T151, held by Doss High School Athletic Stadium Renovation; Construction stormwater; Effective; issued February 18, 2025, term to December 31, 2029, by KY DEP; discharges to Big Run Ditch.
- November 12, 2025: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
- November 12, 2025: Permit Violations - Violation Specified in Comment (ST6).
- November 12, 2025: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 173 were issued before KYR10T151.
Coverages issued nearest KYR10T151
- 2025-02-14: LWC CHWTP RESIDUALS CONVEYANCE SYSTEM SEGMENT 2, Louisville: KYR10T162
- 2025-02-14: MULBERRY STORAGE TANK, Elizabethtown: KYR10T163
- 2025-02-14: ERNSTBRIDGE ROAD BRIDGE REPLACEMENT, Latonia: KYR10T164, held by Ernstbridge Road Bridge Replacement
- 2025-02-14: KNIX TRAN LLC POULTRY BARNS, Columbia: KYR10T165, held by Knix Tran LLC Poultry Barns
- 2025-02-14: WIMSATT LOCHRIDGE SUBDIVISION, Louisville: KYR10T166, held by Wimsatt Lochridge Subdivision
- 2025-02-19: POE 6201 CAMP GROUND RD, Louisville: KYR10T144, held by Poe 6201 Camp Ground Rd
- 2025-02-19: DOLLAR GENERAL, Somerset: KYR10T145, held by Dollar General
- 2025-02-19: CVG CENTER, Erlanger: KYR10T153, held by CVG Center
- 2025-02-19: BULLITT 3, Shepherdsville: KYR10T154, held by Bullitt 3
- 2025-02-19: VELOCITY 65 - LOTS 4A & 4B MASS GRADING, Shepherdsville: KYR10T169, held by Velocity 65 - Lots 4A & 4B Mass Grading
DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION among its neighbors
27 discharge permits are in the Mill Creek Cutoff-Ohio River subwatershed (HUC 051401010903); KYR10T151 is one. Its county: 625, 10 major; KYR10T151 is minor permit.
Other permits in the Mill Creek Cutoff-Ohio River subwatershed (HUC 051401010903)
- 1447 LEVERING STREET WAREHOUSES, Louisville: KYR10T010, minor, term to 2029-12-31
- 5013 CAMP GROUND RD, Louisville: KYR10T060, minor, term to 2029-12-31
- ADALYNN CROSSING, Louisville: KYR10U671, minor, term to 2029-12-31
- ALSTON TRACE SUBDIVISION, Louisville: KYR10S989, minor, term to 2029-12-31
- BAKELITE SYNTHETICS, Louisville: KY0001112, major, term to 2025-03-31
- CITGO PETROLEUM CORP, Louisville: KY0002976, minor, term to 2019-06-30
- DCI - BOASSO GLOBAL, Louisville: KYR004806, minor, term to 2028-07-31
- FORTERRA CONCRETE INDUSTRIES INC - LOUISVILLE SITE, Louisville: KY0040452, minor, term to 2012-10-31
- HABITAT FOR HUMANITY LOWER HUNTERS TRACE SUBDIVISION, Louisville: KYR10T640, minor, term to 2029-12-31
- I-65 CENTRAL CORRIDOR, Louisville: KYR10T764, minor, term to 2029-12-31
What stands out
- Its term runs 4 years and 316 days, February 18, 2025 to December 31, 2029.
- Its newest dated event on file is a single-event violation on November 12, 2025, 336 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 3 single-event violations.
- EPA's file dates 3 events for it, all in 2025.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION |
|---|---|
| Permittee | Doss High School Athletic Stadium Renovation |
| NPDES ID | KYR10T151 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 18, 2025 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Louisville, KY 40214 |
| Receiving water | Big Run Ditch |
| Subwatershed | Mill Creek Cutoff-Ohio River (HUC 051401010903) |
| SIC | 1611 – Highway And Street Construction |
NPDES KYR10T151: effluent limits and exceedances
DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION (NPDES KYR10T151): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10T151: no pollutant row on file.
NPDES KYR10T151: inspections, violations and enforcement
NPDES KYR10T151: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| November 12, 2025 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
| November 12, 2025 | Permit Violations - Violation Specified in Comment | ST6 |
| November 12, 2025 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
NPDES KYR10T151 (DOSS HIGH SCHOOL ATHLETIC STADIUM RENOVATION): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10T151
NPDES KYR10T151: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10T151
NPDES KYR10T151: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded October 14, 2026.