NPDES KYR10T403 · Clean Water Act
MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12, Graham, KY: NPDES KYR10T403 discharge permit, effluent exceedances, inspections, penalties
MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12, Graham, Kentucky: General permit coverage KYR10T403, held by MEGA/KY-Biomass Proposed MFG. Facility Lot 12; Construction stormwater; Effective; issued April 30, 2025, term to December 31, 2029, by KY DEP; discharges to Thompson Creek.
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 384 were issued before KYR10T403.
Coverages issued nearest KYR10T403
- 2025-04-29: WOLF RUN TRUNK G, Lexington: KYR10T401, held by Wolf Run Trunk G
- 2025-04-29: KENTUCKY WELDING INSTITUTE, Flemingsburg: KYR10T402, held by Kentucky Welding Institute
- 2025-04-29: LICKING RIVER SIPHON UPSIZING PHASE III, Erlanger: KYR10T411, held by Licking River Siphon Upsizing Phase III
- 2025-04-29: BARDSTOWN AQUATIC CENTER, Bardstown: KYR10T417, held by Bardstown Aquatic Center
- 2025-04-29: DOWNS OF NICHOLSON, Independence: KYR10T418, held by Downs of Nicholson
- 2025-04-30: CARTER CAVES STATE PARK CAMPGOUND RENOVATION, Olive Hill: KYR10T409, held by Carter Caves State Park Campgound Renovation
- 2025-05-01: VALLEY OAK APARTMENTS, Somerset: KYR10T384, held by Valley Oak Apartments
- 2025-05-01: EIGHTY EIGHT, Glasgow: KYR10T396, held by Eighty Eight
- 2025-05-01: ANDOVER TOWNHOMES, Lexington: KYR10T404, held by Andover Townhomes
- 2025-05-01: KYTC PROJECT: ITEM 3-940.00, Bowling Green: KYR10T405, held by KYTC Project: Item 3-940.00
MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12 among its neighbors
3 discharge permits are in the Elk Pond Creek-Pond River subwatershed (HUC 051100060501); KYR10T403 is one. Its county: 39, 4 major; KYR10T403 is minor permit.
Other permits in the Elk Pond Creek-Pond River subwatershed (HUC 051100060501)
- DYNO NOBEL INC, Graham: KY0110744, minor, term to 2018-06-30
- WHITE PLAINS, CITY OF, White Plains: KYP000062, minor, term to 2023-05-31
What stands out
- Its term runs 4 years and 245 days, April 30, 2025 to December 31, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12 |
|---|---|
| Permittee | MEGA/KY-Biomass Proposed MFG. Facility Lot 12 |
| NPDES ID | KYR10T403 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 30, 2025 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Graham, KY 42344 |
| Receiving water | Thompson Creek |
| Subwatershed | Elk Pond Creek-Pond River (HUC 051100060501) |
NPDES KYR10T403: effluent limits and exceedances
MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12 (NPDES KYR10T403): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10T403: no pollutant row on file.
NPDES KYR10T403: inspections, violations and enforcement
NPDES KYR10T403 (MEGA/KY-BIOMASS PROPOSED MFG. FACILITY LOT 12): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10T403
NPDES KYR10T403: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10T403
NPDES KYR10T403: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.