DISCOVERY POINT SECTION 3, Shelbyville, Kentucky: General permit coverage KYR10U866, held by Discovery Point Section 3; Construction stormwater; Effective; issued July 16, 2026, term to December 31, 2029, by KY DEP; discharges to Bullskin Creek.
- July 29, 2026: Permit Violations - Violation Specified in Comment (ST6).
- July 29, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- July 29, 2026: Evaluation (S).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 1,659 were issued before KYR10U866.
Coverages issued nearest KYR10U866
- 2026-07-14: KY 32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH; ITEM NO. 9-204.00, Morehead (Rowan): KYR10U859, held by KY 32 from Park Hills Drive to Viking Drive North; Item No. 9-204.00
- 2026-07-16: ORTHOCINCY MEDICAL OFFICE BUILDING, Crestview Hills: KYR10U860, held by OrthoCincy Medical Office Building
- 2026-07-16: DOLLAR GENERAL, Stanville: KYR10U861, held by Dollar General
- 2026-07-16: ELWOOD-HENRY CLAY 46KV STR 7 EMERGENCY PROJECT, South Williamson: KYR10U862, held by Elwood-Henry Clay 46kV Str 7 Emergency Project
- 2026-07-16: DISCOVERY POINT SECTION 2, Shelbyville: KYR10U865, held by Discovery Point Section 2
- 2026-07-20: CLARYVILLE CENTRAL STORAGE GRADING AND DRAINAGE, Alexandria (Campbell): KYR10U863, held by Claryville Central Storage Grading and Drainage
- 2026-07-21: SPENCER MATTINGLY DEVELOPMENT, Bardstown: KYR10U867, held by Spencer Mattingly Development
- 2026-07-21: CAMIC PROPERTY - RHEMA WAY LOTS 3-12, Lexington: KYR10U868
- 2026-07-21: KSU - WALKWAY IMPROVEMENTS & REPAIRS PHASE 2, Frankfort: KYR10U869, held by KSU - Walkway Improvements & Repairs Phase 2
- 2026-07-21: SANDY SPRINGS, Elizabethtown: KYR10U870
DISCOVERY POINT SECTION 3 among its neighbors
18 discharge permits are in the Lower Bullskin Creek subwatershed (HUC 051401020406); KYR10U866 is one. Its county: 139, 1 major; KYR10U866 is minor permit.
Other permits in the Lower Bullskin Creek subwatershed (HUC 051401020406)
- CHARLES RICHMOND RESIDENCE, Shelbyville: KYG405433, minor, term to 2028-08-31
- DISCOVERY POINT SECTION 2, Shelbyville: KYR10U865, minor, term to 2029-12-31
- DISCOVERY POINT SUBDIVISION, PHASE 510, Shelbyville: KYR10T093, minor, term to 2029-12-31
- DISCOVERY POINT SUBDIVISION, PHASE 520, Shelbyville: KYR10T094, minor, term to 2029-12-31
- DISCOVERY POINT SUBDIVISION, PHASE 620, Shelbyville: KYR10T092, minor, term to 2029-12-31
- FB PURNELL SAUSAGE CO, Simpsonville: KY0001309, minor, term to 2023-09-30
- GRIBBONS PROPERTY, Simpsonville: KYR10U323, minor, term to 2029-12-31
- JERRY BROWN RESIDENCE, Shelbyville: KYG404014, minor, term to 2023-08-31
- JON & KELLY MILES RESIDENCE, Simpsonville: KYG405828, minor, term to 2028-08-31
- MARSHALL LOGISTICS PARK, Simpsonville: KYR10T074, minor, term to 2029-12-31
What stands out
- Its term runs 3 years and 168 days, July 16, 2026 to December 31, 2029.
- Its newest dated event on file is single-event violation and inspection on July 29, 2026, 48 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 2 single-event violations, 1 inspection.
- EPA's file dates 3 events for it, all in 2026.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DISCOVERY POINT SECTION 3 |
|---|---|
| Permittee | Discovery Point Section 3 |
| NPDES ID | KYR10U866 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 16, 2026 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Shelbyville, KY 40065 |
| Receiving water | Bullskin Creek |
| Subwatershed | Lower Bullskin Creek (HUC 051401020406) |
NPDES KYR10U866: effluent limits and exceedances
DISCOVERY POINT SECTION 3 (NPDES KYR10U866): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10U866: no pollutant row on file.
NPDES KYR10U866: inspections, violations and enforcement
NPDES KYR10U866: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| July 29, 2026 | Permit Violations - Violation Specified in Comment | ST6 |
| July 29, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
NPDES KYR10U866: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| July 29, 2026 | Evaluation | S |
NPDES KYR10U866 (DISCOVERY POINT SECTION 3): no formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10U866
NPDES KYR10U866: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10U866
NPDES KYR10U866: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.