ENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT, Geismar, LA: NPDES LA0001431 discharge permit, effluent exceedances, inspections, penalties

ENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT, Geismar, Louisiana: Individual permit LA0001431, held by ENTERPRISE GAS PROCESSING LLC; Administratively continued; issued July 31, 2015, term to August 31, 2020.

9 of the 15 pollutants listed for NPDES LA0001431 have no violation or effluent exceedance.

  • Chlorine, free available: 1 limit, 11 violations of any kind, 11 effluent exceedances, latest October 31, 2025, largest 1,046% over the limit.
  • Carbon, tot organic [TOC]: 3 limits, 2 violations of any kind, 2 effluent exceedances, latest December 31, 2023, largest 69% over the limit.
  • Solids, total suspended: 4 limits, 1 violation of any kind, 1 effluent exceedance, latest June 30, 2018, largest 37% over the limit.
  • Temperature, water deg. fahrenheit: 1 limit, 1 violation of any kind, 1 effluent exceedance, latest September 30, 2023, largest 5% over the limit.
  • Oxygen demand, chem. [high level] [COD]: 1 limit, 1 violation of any kind, 1 effluent exceedance, latest September 30, 2024, largest 1,804% over the limit.
  • Zinc, total [as Zn]: 1 limit, 1 violation of any kind.
  • Flow, in conduit or thru treatment plant: 12 limits.
  • pH: 4 limits.
  • BOD, 5-day, 20 deg. C: 2 limits.
  • Oil and grease: 2 limits.
  • Coliform, fecal general: 2 limits.
  • Iron, total [as Fe]: 1 limit.
  • Lead, total [as Pb]: 1 limit.
  • Benzene: 1 limit.
  • BTEX: 1 limit.
  • February 6, 2026: Phone Call/ EMAIL (State).

Other permits held by ENTERPRISE GAS PROCESSING LLC

ENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT among its neighbors

42 discharge permits are in the Grand Goudine Bayou-New River subwatershed (HUC 080702040103); LA0001431 is one. Its county: 212, 16 major; LA0001431 is minor permit.

Other permits in the Grand Goudine Bayou-New River subwatershed (HUC 080702040103)

What stands out

  • Its term runs 5 years and 31 days, July 31, 2015 to August 31, 2020; the term ended 2,206 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an informal enforcement action on February 6, 2026, 221 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 informal enforcement action.
  • EPA's file dates 1 event for it, all in 2026.
  • 5 of its 15 pollutants on file have an effluent exceedance (33%); 15 are under a numeric limit; the largest exceedance is Oxygen demand, chem. [high level] [COD] at 1,804% over its limit.
  • It is one of 4,455 discharge permits on the register in Louisiana; the file names no program for it, and it is a minor discharger.

Identity

FacilityENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT
PermitteeENTERPRISE GAS PROCESSING LLC
NPDES IDLA0001431
StatusAdministratively continued
TypeIndividual permit
ClassMinor
Facility typeNon-POTW
IssuedJuly 31, 2015
ExpiresAugust 31, 2020
AddressGeismar, LA 70734
Receiving water impaired303(D) Listed
SubwatershedGrand Goudine Bayou-New River (HUC 080702040103)
Other EPA IDs (FRS)RCRA handler LAD980746895; ICIS-AIR source LA0000002200500032

NPDES LA0001431: effluent limits and exceedances

ENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT (NPDES LA0001431): 15 pollutants on file, 15 limited; 6 with a violation of any kind, 5 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Chlorine, free available11111October 31, 20251,046% over the limit
Carbon, tot organic [TOC]322December 31, 202369% over the limit
Solids, total suspended411June 30, 201837% over the limit
Temperature, water deg. fahrenheit111September 30, 20235% over the limit
Oxygen demand, chem. [high level] [COD]111September 30, 20241,804% over the limit
Zinc, total [as Zn]110
Flow, in conduit or thru treatment plant1200
pH400
BOD, 5-day, 20 deg. C200
Oil and grease200
Coliform, fecal general200
Iron, total [as Fe]100
Lead, total [as Pb]100
Benzene100
BTEX100

NPDES LA0001431: inspections, violations and enforcement

NPDES LA0001431: 1 informal enforcement action

DateWhat EPA recordedAgency
February 6, 2026Phone Call/ EMAILState

NPDES LA0001431 (ENTERPRISE GAS PROCESSING LLC -TEBONE FRACTIONATION PLANT): no single-event violation, inspection and formal enforcement action on file.

Watch NPDES LA0001431

NPDES LA0001431: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES LA0001431

NPDES LA0001431: 15 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.