EPA · discharge permits by city
Discharge permits in Harwich, Massachusetts
- 10Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| 611985-127856 LAWRENCE-LYNCH: HARWICH, MA - SIDEWALK INSTALLATION ON ROUTE 28 | MAR1005ID | Construction stormwater | Minor | Long Pond |
| DEPOT ROAD PHOTOVOLTAIC SYSTEM | MAR10041B | Construction stormwater | Minor | Long Pond |
| HARWICH, ROUTE 28, SIDEWALK INSTALLATION | MAR1005M7 | Construction stormwater | Minor | Long Pond |
| HINCKLEYS POND-HERRING RIVER HEADWATERS ECO-RESTORATION | MAR1005LZ | Construction stormwater | Minor | Long Pond |
| LANG-WYCOFF 397 ROUTE 28 HARWICH 21E | MAR1002T3 | Construction stormwater | Minor | Long Pond |
| PHASE 3 SEWER EXTENSION, CONTRACTS 1-E AND 2-W | MAR1005FS | Construction stormwater | Minor | Long Pond |
| PHASE 3A SEWER EXTENSION PROJECT, QUEEN ANNE RD, HARWICH, MA | MAR1006CL | Construction stormwater | Minor | Long Pond |
| STRAWBERRY HILL SUBDIVISION | MAR10039O | Construction stormwater | Minor | Long Pond |
| TURTLE RUN SUBDIVISION | MAR1003UZ | Construction stormwater | Minor | Long Pond |
| HARWICH TOWN OF | MAR041120 | Minor | Long Pond |