PILGRIM NUCLEAR POWER STATION, Plymouth, MA: NPDES MA0003557 discharge permit, effluent exceedances, inspections, penalties

PILGRIM NUCLEAR POWER STATION, Plymouth, Massachusetts: Individual permit MA0003557, held by HOLTEC PILGRIM; Administratively continued; issued April 29, 1991, term to April 29, 1996; discharges to CAPE COD BAY; Nuclear Electric Power Generation.

  • Solids, total suspended: 10 limits, 80 violations of any kind, 38 effluent exceedances, latest July 31, 2026, largest 2,770% over the limit.
  • Oxidants, total residual: 4 limits, 19 violations of any kind, 15 effluent exceedances, latest February 28, 2013, largest 400% over the limit.
  • Temp. diff. between intake and discharge: 1 limit, 8 violations of any kind, 6 effluent exceedances, latest March 31, 2002, largest 6% over the limit.
  • Temperature, water deg. fahrenheit: 2 limits, 20 violations of any kind, 1 effluent exceedance, latest October 31, 1995, largest 3% over the limit.
  • Oil & Grease: 8 limits, 47 violations of any kind.
  • Flow, in conduit or thru treatment plant: 12 limits, 7 violations of any kind.
  • pH: 0 limits, 2 violations of any kind.

PILGRIM NUCLEAR POWER STATION among its neighbors

9 discharge permits are in the Great Herring Pond-Frontal Cape Cod Bay subwatershed (HUC 010900020107); MA0003557 is one. Its county: 142, 10 major; MA0003557 is major permit.

Other permits in the Great Herring Pond-Frontal Cape Cod Bay subwatershed (HUC 010900020107)

What stands out

  • Its term runs 5 years, April 29, 1991 to April 29, 1996; the term ended 11,125 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • 4 of its 7 pollutants on file have an effluent exceedance (57%); 6 are under a numeric limit; the largest exceedance is Solids, total suspended at 2,770% over its limit.
  • It is one of 6,154 discharge permits on the register in Massachusetts; the file names no program for it, and it is a major discharger.

Identity

FacilityPILGRIM NUCLEAR POWER STATION
PermitteeHOLTEC PILGRIM
NPDES IDMA0003557
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typeNon-POTW
IssuedApril 29, 1991
ExpiresApril 29, 1996
AddressPlymouth, MA 02360
Receiving waterCAPE COD BAY
SubwatershedGreat Herring Pond-Frontal Cape Cod Bay (HUC 010900020107)
NAICS221113 – Nuclear Electric Power Generation
SIC4911 – Electric Services
Other EPA IDs (FRS)RCRA handler MAR000014167

NPDES MA0003557: effluent limits and exceedances

PILGRIM NUCLEAR POWER STATION (NPDES MA0003557): 7 pollutants on file, 6 limited; 7 with a violation of any kind, 4 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended108038July 31, 20262,770% over the limit
Oxidants, total residual41915February 28, 2013400% over the limit
Temp. diff. between intake and discharge186March 31, 20026% over the limit
Temperature, water deg. fahrenheit2201October 31, 19953% over the limit
Oil & Grease8470
Flow, in conduit or thru treatment plant1270
pH020

NPDES MA0003557: inspections, violations and enforcement

NPDES MA0003557 (PILGRIM NUCLEAR POWER STATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MA0003557

NPDES MA0003557: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MA0003557

NPDES MA0003557: 7 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.