CONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION, Bedford-Billerica, MA: NPDES MAR10011D discharge permit, effluent exceedances, inspections, penalties

CONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION, Bedford-Billerica, Massachusetts: General permit coverage MAR10011D, held by BARLETTA HEAVY DIVISION; Construction stormwater; Administratively continued; issued December 5, 2017, term to February 15, 2022, by U.S. EPA.

Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 39 were issued before MAR10011D.

Coverages issued nearest MAR10011D

CONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION among its neighbors

62 discharge permits are in the Middle Shawsheen River subwatershed (HUC 010700061302); MAR10011D is one.

Other permits in the Middle Shawsheen River subwatershed (HUC 010700061302)

What stands out

  • Its term runs 4 years and 72 days, December 5, 2017 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION
PermitteeBARLETTA HEAVY DIVISION
NPDES IDMAR10011D
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedDecember 5, 2017
ExpiresFebruary 15, 2022
AgencyU.S. EPA
AddressBedford-Billerica, MA 01730
SubwatershedMiddle Shawsheen River (HUC 010700061302)

NPDES MAR10011D: effluent limits and exceedances

CONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION (NPDES MAR10011D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MAR10011D: no pollutant row on file.

NPDES MAR10011D: inspections, violations and enforcement

NPDES MAR10011D (CONSTRUCTION OF PHASE III OF THE MIDDLESEX TURNPIKE EXTENSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MAR10011D

NPDES MAR10011D: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MAR10011D

NPDES MAR10011D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.