NPDES MAR1002CB · Clean Water Act
THE CENTER AT HOBBS BROOK, Sturbridge, MA: NPDES MAR1002CB discharge permit, effluent exceedances, inspections, penalties
THE CENTER AT HOBBS BROOK, Sturbridge, Massachusetts: General permit coverage MAR1002CB, held by Rabine Paving America LLC; Construction stormwater; Not needed.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file.
THE CENTER AT HOBBS BROOK among its neighbors
33 discharge permits are in the McKinstry Brook-Quinebaug River subwatershed (HUC 011000010103); MAR1002CB is one.
Other permits in the McKinstry Brook-Quinebaug River subwatershed (HUC 011000010103)
- 18 SAMPSON ROAD SOIL STOCKPILE, Charlton: MAR1003U3, minor, term to 2027-02-16
- 200 HAYES STREET GROUND-MOUNTED PHOTOVOLTAIC SYSTEM, Sturbridge: MAR10067K, minor, term to 2027-02-16
- 220 STURBRIDGE ROAD, Charlton: MAR1004XM, minor, term to 2027-02-16
- 608778, SOUTHBRIDGE, INTERSECTION IMPROVEMENTS, CENTRAL,FOSTER &HAMILTON STREETS, Southbridge: MAR1006CM, minor, term to 2027-02-16
- 608788-130744 LUDLOW CONSTRUCTION: SOUTHBRIDGE, MA - INTERSECTION IMPROVEMENTS, Southbridge: MAR100606, minor, term to 2027-02-16
- 660 MAIN STREET, Sturbridge: MAR1005Y9, minor, term to 2027-02-16
- A.F. AMORELLO & SONS, INC.: SOUTHBRIDGE,MA - RECONSTRUCTION OF CRANE & RIVER ST., Southbridge: MAR1005M8, minor, term to 2027-02-16
- BERRY FARMS ROAD, Sturbridge: MAR1003TV, minor, term to 2027-02-16
- BLUEBERRY HILL ESTATES, Sturbridge: MAR100548, minor, term to 2027-02-16
- BRIMFIELD PRECISION LLC (DBA LAKE REGION MEDICAL), Fiskdale: MANOE3788, minor, term to 2020-12-16
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater.
Identity
| Facility | THE CENTER AT HOBBS BROOK |
|---|---|
| Permittee | Rabine Paving America LLC |
| NPDES ID | MAR1002CB |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Sturbridge, MA 01566 |
| Subwatershed | McKinstry Brook-Quinebaug River (HUC 011000010103) |
NPDES MAR1002CB: effluent limits and exceedances
THE CENTER AT HOBBS BROOK (NPDES MAR1002CB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1002CB: no pollutant row on file.
NPDES MAR1002CB: inspections, violations and enforcement
NPDES MAR1002CB (THE CENTER AT HOBBS BROOK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1002CB
NPDES MAR1002CB: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1002CB
NPDES MAR1002CB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.