NPDES MAR1002E0 · Clean Water Act
2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford, MA: NPDES MAR1002E0 discharge permit, effluent exceedances, inspections, penalties
2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford, Massachusetts: General permit coverage MAR1002E0, held by EMD Millipore Corporation; Construction stormwater; Administratively continued; issued November 21, 2019, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 139 were issued before MAR1002E0. EMD Millipore Corporation holds 5 permits in Massachusetts.
Other permits held by EMD Millipore Corporation
- DANVERS MOBIUS, Danvers: MANOEJ026, issued 2019-07-01
- MILLIPORESIGMA, Burlington: MANOEJ06D, issued 2021-02-26
- MILLIPORESIGMA, Bedford: MANOEJ06E, issued 2021-02-26
- MILLIPORESIGMA, Bedford: MANOEJ06F, issued 2021-02-26
Coverages issued nearest MAR1002E0
- 2019-11-04: WOLCOTT WOODS, Milton: MAR1002CW, held by Wolcott Residential, LLC
- 2019-11-05: PROJECT 2022, Hyannis: MAR1002CZ, held by Suffolk
- 2019-11-11: FENWAY THEATER, Boston: MAR1002DB, held by Gilbane Building Company
- 2019-11-15: 625A BROADWAY ROAD, Dracut: MAR1002DS, held by The DOW Company, Inc.
- 2019-11-20: MBTA OAK GROVE STATION, Malden: MAR1002DY, held by BARLETTA HEAVY DIVISION, INC.
- 2019-12-11: ADAMS SHORE/ HOUGHS NECK SEAWALL REPAIRS AND IMPROVEMENTS PROJECT, Quincy: MAR1002EW, held by MIG Corporation
- 2019-12-11: SPECIAL PERMIT PLAN RESIDENTIAL COMPOUND DEVELOPMENT SUBDIVISION, Scituate: MAR1002EX, held by Highland Estates Scituate LLC
- 2019-12-19: TUTTLE LANE, Lynnfield: MAR1002F1, held by HPI Mass RE Development, LLC
- 2019-12-31: MASSACHUSETTS NATIONAL CEMETERY PHASE IV DEVELOPMENT, Bourne: MAR1002FG, held by LORI L HODEN
- 2020-01-02: STOCKBRIDGE LANDING, SCITUATE, MA, Scituate: MAR1002FJ, held by Stockbridge Realty Trust II
2019 EMD MILLIPORE DEMOLITION PROJECT among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR1002E0 is one.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
- 7 HARTWELL AVENUE HOUSING DEVELOPMENT, Lexing: MAR100646, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 86 days, November 21, 2019 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 2019 EMD MILLIPORE DEMOLITION PROJECT |
|---|---|
| Permittee | EMD Millipore Corporation |
| NPDES ID | MAR1002E0 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 21, 2019 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Bedford, MA 01730 |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
NPDES MAR1002E0: effluent limits and exceedances
2019 EMD MILLIPORE DEMOLITION PROJECT (NPDES MAR1002E0): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1002E0: no pollutant row on file.
NPDES MAR1002E0: inspections, violations and enforcement
NPDES MAR1002E0 (2019 EMD MILLIPORE DEMOLITION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1002E0
NPDES MAR1002E0: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1002E0
NPDES MAR1002E0: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.