NPDES MAR1003MH · Clean Water Act
GRAVEL REMOVAL, West Townsend, MA: NPDES MAR1003MH discharge permit, effluent exceedances, inspections, penalties
GRAVEL REMOVAL, West Townsend, Massachusetts: General permit coverage MAR1003MH, held by Shepco Inc.; Construction stormwater; Administratively continued; issued November 23, 2021, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 473 were issued before MAR1003MH.
Coverages issued nearest MAR1003MH
- 2021-11-11: 64 OTIS STREET, Westborough: MAR1003M4, held by DACON
- 2021-11-11: MARLBOROUGH PUMP STATION CONNECTION MARLBOROUGH, MASS, Marlborough: MAR1003M5, held by GVC Construction & Engineering
- 2021-11-12: TOOLE-60187 LUDLOW: NORTHAMPTON, MA - PLEASANT ST ROUTE 5, Northampton: MAR1003M6, held by Ludlow Construction Co Inc
- 2021-11-15: OVERLOOK ROAD SOLAR PROJECT, Westminster: MAR1003M8, held by Pro-Tech Energy Solutions, LLC
- 2021-11-16: MEGANSETT CROSSING, North Falmouth: MAR1003MD, held by Andrew Seguin
- 2021-11-24: ENDICOTT COLLEGE HEALTH SCIENCE BUILDING, Beverly: MAR1003MJ, held by Windover Construction
- 2021-11-24: C114659 LUDLOW: MARLBOROUGH, MA - BOSTON POST ROAD ROUTE 20, Marlborough: MAR1003MK, held by Ludlow Construction
- 2021-11-24: MBTA QUINCY BUS MAINTENANCE FACILITY DEMOLITION, Quincy: MAR1003ML, held by Manafort Brothers, LLC
- 2021-11-29: 45 MIDDLESEX ROAD, Tyngsboro: MAR1003MP, held by KB Properties, LLC
- 2021-11-30: ROADWAY RECONSTRUCTION ON SECTIONS OF WISDOM WAY AND RIVER/MILL STREET, Greenfield: MAR1003MQ, held by C&A Construction Co. Inc.
GRAVEL REMOVAL among its neighbors
3 discharge permits are in the Willard Brook subwatershed (HUC 010700040301); MAR1003MH is one.
Other permits in the Willard Brook subwatershed (HUC 010700040301)
- AAP ASHBY - FITCHBURG STATE ROAD, Ashby: MAR1003SZ, minor, term to 2027-02-16
- ASHBY PUBLIC SAFETY BUILDING, Ashby: MAR1003H9, minor, term to 2022-02-15
What stands out
- Its term runs 84 days, November 23, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GRAVEL REMOVAL |
|---|---|
| Permittee | Shepco Inc. |
| NPDES ID | MAR1003MH |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 23, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | West Townsend, MA 01474 |
| Subwatershed | Willard Brook (HUC 010700040301) |
NPDES MAR1003MH: effluent limits and exceedances
GRAVEL REMOVAL (NPDES MAR1003MH): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1003MH: no pollutant row on file.
NPDES MAR1003MH: inspections, violations and enforcement
NPDES MAR1003MH (GRAVEL REMOVAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1003MH
NPDES MAR1003MH: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1003MH
NPDES MAR1003MH: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.