NPDES MAR1004AH · Clean Water Act
CARVER TO KINGSTON RELIABILITY PROJECT, Plympton, MA: NPDES MAR1004AH discharge permit, effluent exceedances, inspections, penalties
CARVER TO KINGSTON RELIABILITY PROJECT, Plympton, Massachusetts: General permit coverage MAR1004AH, held by Kenneth Jackman; Construction stormwater; Effective; issued October 12, 2022, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 994 were issued before MAR1004AH.
Coverages issued nearest MAR1004AH
- 2022-10-07: RIVER STREET INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS, Cambridge: MAR1004AA, held by P. Gioioso & Sons, Inc.
- 2022-10-10: PHASE 1 - TABLE TALK LOFTS, Worcester: MAR1004AB, held by Cranshaw Construction
- 2022-10-10: BLUNT PARK, Springfield: MAR1004AC, held by William Cahillane
- 2022-10-10: STONEHAM HIGH SCHOOL, Stoneham: MAR1004AD, held by Consigli Construction Co.
- 2022-10-11: SAFE HARBOR MARINA PLYMOUTH, Plymouth: MAR1004AE, held by SHM Plymouth
- 2022-10-12: CODMAN YARD, Dorchester: MAR1004AI, held by Barletta Heavy Division
- 2022-10-13: 33 DANTON DRIVE - JESSIE'S BAKERY, Methuen: MAR1004AJ, held by Haynes Group Jeffrey M Benevides
- 2022-10-13: PROPOSED CANNABIS CULTIVATION FACILITY - ORANGE, MA, Orange: MAR1004AK, held by Mike Oberin
- 2022-10-13: 0 SOUTH STREET (COMMON DRIVEWAY FOR LOTS 1-3 SOUTH STREET), Marlborough: MAR1004AL, held by Anthony Iacovelli, Iacovelli Excavation & Construction, Inc.
- 2022-10-14: 316 NEW BOSTON STREET, WOBURN MA, Woburn: MAR1004AN, held by Fairfield Residential
CARVER TO KINGSTON RELIABILITY PROJECT among its neighbors
13 discharge permits are in the Jones River-Frontal Kngston Bay subwatershed (HUC 010900020105); MAR1004AH is one.
Other permits in the Jones River-Frontal Kngston Bay subwatershed (HUC 010900020105)
- 101 KINGSTON COLLECTION WAY, Kingston: MAR100410, minor, term to 2027-02-16
- 20 MARION DRIVE, KINGSTON, Kingston: MAR10030X, minor, term to 2022-02-15
- 2386 PEMBROKE FIRE SUBSTATION, Pembroke: MAR1005UQ, minor, term to 2027-02-16
- AMAZON.COM SERVICES LLC - DAS9, Plymouth: MAR05J03C, minor, term to 2026-02-28
- CRANEBERRY FARM, Kingston: MAR1004I2, minor, term to 2027-02-16
- EFFLUENT RECHARGE SITE NO. 3, Kingston: MAR10055W, minor, term to 2027-02-16
- KE KINGSTON LANDFILL SOLAR, Kingston: MAR100481, minor, term to 2027-02-16
- KINGSTON TOWN OF, Kingston: MAR041041
- LAKE STREET SOLAR PROJECT, Plympton: MAR1003KT, minor, term to 2022-02-15
- SAMPSON'S BROOK HEADWATERS RESTORATION PROJECT, Kingston: MAR1005KH, minor, term to 2027-02-16
What stands out
- Its term runs 4 years and 127 days, October 12, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CARVER TO KINGSTON RELIABILITY PROJECT |
|---|---|
| Permittee | Kenneth Jackman |
| NPDES ID | MAR1004AH |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 12, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Plympton, MA 02367 |
| Subwatershed | Jones River-Frontal Kngston Bay (HUC 010900020105) |
NPDES MAR1004AH: effluent limits and exceedances
CARVER TO KINGSTON RELIABILITY PROJECT (NPDES MAR1004AH): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1004AH: no pollutant row on file.
NPDES MAR1004AH: inspections, violations and enforcement
NPDES MAR1004AH (CARVER TO KINGSTON RELIABILITY PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1004AH
NPDES MAR1004AH: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1004AH
NPDES MAR1004AH: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.