Clean Water Act discharge permit · NPDES MAR1004P3
MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L, East Boston, MA: NPDES MAR1004P3 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L, held by McCourt Construction Company, holds NPDES permit MAR1004P3. EPA’s file records it issued June 30, 2023 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L: its NPDES ID, its permit type and status, its dates, its address in East Boston, Massachusetts. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MAR1004P3.
What stands out
- Its term runs 3 years and 231 days, June 30, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L |
|---|---|
| Permittee as filed | McCourt Construction Company |
| NPDES ID | MAR1004P3 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | June 30, 2023 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | East Boston, MA 02128 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Outlet Saugus River-Frontal Broad Sound (HUC 010900010402) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES MAR1004P3.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES MAR1004P3.
Inspections
EPA’s inspection file holds no inspection for NPDES MAR1004P3.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES MAR1004P3.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MAR1004P3.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MAR1004P3 there.
MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L, East Boston, Massachusetts: Coverage under a general permit MAR1004P3, held by McCourt Construction Company; Construction stormwater; Effective; issued June 30, 2023, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,350 were issued before MAR1004P3. McCourt Construction Company holds 12 permits in Massachusetts.
Other permits held by McCourt Construction Company
- CAMBRIDGE CROSSING - 125 CAMBRIDGE STREET, Cambridge: MAR100436, issued 2022-06-24
- CAMBRIDGE CROSSING STABILIZED OPEN LOTS, Cambridge: MAR1004CG, issued 2022-11-15
- MPA PROJECT NO. L1645-C1 REHABILITATION OF RUNWAY 15R-33L, East Boston: MAR1004LW, issued 2023-04-28
- MPA PROJECT NO. L1653-C1, REHABILITATETAXIWAY N FROM RUNWAY15R TO 22L, Boston: MAR10058S, issued 2024-08-14
- MPA L1653-C1, REHABILITATE TAXIWAY N FROM RUNWAY15R TO 22L LOGAN AIRPORT, Boston: MAR1005AI, issued 2024-07-11
- MPA CONTRACT NO. L1707-C1 REHABILITATION OF TAXIWAY BRAVO NORTH, Boston: MAR1005B4, issued 2025-08-13
- MPA CONTRACT NO. L916-C1 DUCT BANK INSTALLATION: TERMINALS B/C ALLEYWAY, Boston: MAR1005VT, issued 2025-08-13
- MPA PROJECT L1633-C1 RUNWAY 27 SAFETY AREA IMPROVEMENTS, Boston: MAR1005VV, issued 2025-08-13
- MPA CONTRACT NO. L1708-C1 REHABILITATE TAXIWAY B EAST AND SOUTH, Boston: MAR1006BF, issued 2026-05-12
- MPA CONTRACT NO. L1407-C1 REHABILITATE TERMINALS B/C, C, AND C/E ALLEYWAYS, Boston: MAR1006FK, issued 2026-07-21
Coverages issued nearest MAR1004P3
- 2023-06-28: DAVID PROUTY HIGH SCHOOL, Spencer: MAR1004OY, held by Marois Brothers, Inc.
- 2023-06-28: DEERFIELD ACADEMY SYNTHETIC TURF FIELD PROJECT, Deerfield: MAR1004OZ, held by Argus Construction Corp.
- 2023-06-28: PROPOSED WAREHOUSE BUILDING – 75 PLAIN ST, HOPEDALE, MA, Hopedale: MAR1004P0, held by ARCO National Construction-NE
- 2023-06-28: 50 PLEASANT STREET MULTI-FAMILY HOUSING DEVELOPMENT, Natick: MAR1004P1, held by Joel and Linda Valentin
- 2023-06-30: 24 DRYDOCK AVENUE, Boston: MAR1004P2, held by Related Beal Construction, LLC
- 2023-06-30: PROPOSED WAREHOUSE/OFFICE BUILDING - HUDSON DRIVE & WHALLEY WAY, Southwick: MAR1004P4, held by John Whalley
- 2023-07-04: TEMPORARY DINING HALL, Deerfield: MAR1004P7, held by Andrew DeMado
- 2023-07-04: SYNTHETIC TURF FIELD, Deerfield: MAR1004P8, held by Deerfield Academy
- 2023-07-04: DIDONATO DRIVE, Westford: MAR1004P9, held by Walter Eriksen
- 2023-07-04: SUNSET OAKS, Haverhill: MAR1004PA, held by Stonebrook Land Developers
MPA PROJECT NO. LI645-C1 REHABILITATION OF RUNWAY 15R-33L among its neighbors
146 discharge permits are in the Outlet Saugus River-Frontal Broad Sound subwatershed (HUC 010900010402); MAR1004P3 is one.
Other permits in the Outlet Saugus River-Frontal Broad Sound subwatershed (HUC 010900010402)
- #114626 ALBANESE D&S: EVERETT, MA - FERRY ST, SOUTH FERRY ST, AND ELM ST, Everett: MAR1003MW, minor, term to 2022-02-15
- 150 SALEM TURNPIKE WAREHOUSE, Saugus: MAR10036A, minor, term to 2022-02-15
- 1639 BROADWAY, Saugus: MAR10053T, minor, term to 2027-02-16
- 1753 BROADWAY SAUGUS MA, Saugus: MAR10063Y, minor, term to 2027-02-16
- 2301 W.L. FRENCH: LYNN, MA - KEANEY PARK IMPROVEMENTS, Lynn: MAR10055B, minor, term to 2027-02-16
- 265 PLEASANT STREET - THE MARINER, Marblehead: MAR1002IC, minor, term to 2022-02-15
- 295 EASTERN AVE, Chelsea: MAR10053M, minor, term to 2027-02-16
- 3-7 GRIFFIN WAY, CHELSEA, MA, Chelsea: MANOEJ0DG, minor, term to 2029-07-31
- 355 BENNINGTON STREET, Boston: MAR1005P5, minor, term to 2027-02-16
- 5TH JET FUEL TANK, East Boston: MAR1004F7, minor, term to 2027-02-16
Nearby on the register
- Discharge permits in East Boston
- Every permit record in East Boston, A to Z
- Discharge permits in Massachusetts
- Every permit record in Massachusetts, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The MPA Project No. LI645-C1 Rehabilitation of Runway 15R-33L permit, held by McCourt Construction Company, is one of 9 storm water construction permits in East Boston, and 0.0% of those 9 have a violation on file. Among all 9 East Boston storm water construction permits, 44.4% were issued earlier than this one, and it sits within a subwatershed that contains 146 NPDES permits in total.