NPDES MAR1004WI · Clean Water Act
FY24 720 MAIN STREET PUMP STATION REPLACEMENT, Barnstable, MA: NPDES MAR1004WI discharge permit, effluent exceedances, inspections, penalties
FY24 720 MAIN STREET PUMP STATION REPLACEMENT, Barnstable, Massachusetts: General permit coverage MAR1004WI, held by RJV Construction Corp.; Construction stormwater; Effective; issued November 14, 2023, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,530 were issued before MAR1004WI. RJV Construction Corp. holds 7 permits in Massachusetts.
Other permits held by RJV Construction Corp.
- ROADWAY RECONSTRUCTION AND RELATED WORK - DEPOT STREET (RT. 123), Easton: MAR10035Y, issued 2021-03-17
- WASM 3 MYSTIC VALLEY PARKWAY, Medford: MAR1003IY, issued 2021-09-23
- WASM 4 NONANTUM ROAD, Boston: MAR1003J0, issued 2021-09-23
- IMPROVEMENTS ON ROUTE 6 AT GARDNERS NECK ROAD, Swansea: MAR1005EB, issued 2024-10-01
- SOMERVILLE MARGINAL CSO FACILITY NEW PIPE CONNECTION, Somerville: MAR1005NE, issued 2025-04-01
- PHASE 1 - CONTRACT NO. 4 WASTEWATER COLLECTION FACILITY, Dennis: MAR1005SH, issued 2025-06-17
Coverages issued nearest MAR1004WI
- 2023-11-13: WARE SOLAR, Ware: MAR1004WC, held by Ecos Energy LLC
- 2023-11-13: 73 ABINGTON STREET/ WAREHOUSE FACILITY, Hingham: MAR1004WD, held by Wesleigh Behn
- 2023-11-13: 25 FORGE PARKWAY, Franklin: MAR1004WE, held by Green Site Services Group Inc
- 2023-11-14: 52 NEW STREET, Cambridge: MAR1004WF, held by Callahan Construction Managers
- 2023-11-14: STURDY HEALTH MEDICAL OFFICE BUILDING, Attleboro: MAR1004WG, held by Consigli Construction Co, Inc.
- 2023-11-16: MOUNT GREYLOCK REGIONAL SCHOOL TRACK PROJECT, Williamstown: MAR1004WJ, held by WM. J Keller & Sons Construction Corp.
- 2023-11-16: 8 CEDAR STREET - WENHAM, Wenham: MAR1004WK, held by David Sabatini
- 2023-11-17: 401 SETUCKET ROAD, DENNIS, MA, Dennis: MAR1004WN, held by Habitat for Humanity of Cape Cod
- 2023-11-20: #608203, BERLIN, RESURFACING AND RELATED WORK ALONG SECTIONS OF INTERSTATE 495, Berlin To Milford: MAR1004WO, held by MassDOT
- 2023-11-21: PALMER SF BAPTIST HILL STORMWATER RESTORATION PROJECT, Palmer: MAR1004WP, held by Audet & Associates Inc.
FY24 720 MAIN STREET PUMP STATION REPLACEMENT among its neighbors
128 discharge permits are in the Wequaquet Lake subwatershed (HUC 010900020206); MAR1004WI is one.
Other permits in the Wequaquet Lake subwatershed (HUC 010900020206)
- 115043 LAWRENCE LYNCH: MASHPEE, MA - CORRIDOR IMPROVEMENTS ROUTE 151, Mashpee: MAR1003NP, minor, term to 2022-02-15
- 179411051 LAWRENCE-LYNCH: SANDWICH, MA - QUAKER MEETINGHOUSE ROAD AT ROUTE 130, Sandwich: MAR100530, minor, term to 2027-02-16
- 227 CLINTON AVENUE & 352 SCRANTON AVENUE, Falmouth: MAG912150, minor, term to 2027-08-01
- 268 STEVENS STREET MULTI-FAMILY, Hyannis: MAR1005Y4, minor, term to 2027-02-16
- 268 STEVENS STREET PUMP STATION, Barnstable: MAR1005VM, minor, term to 2027-02-16
- 459 BLACKSMITH SHOP ROAD SOLAR DEVELOPMENT, Falmouth: MAR1006B7, minor, term to 2027-02-16
- 607398-127855 LAWRENCE-LYNCH: YARMOUTH, MA - CAPE COD RAIL TRAIL EXTENSION, West Yarmouth: MAR1005JQ, minor, term to 2027-02-16
- 611986-126589 LAWRENCE-LYNCH: MASHPEE, MA - CORRIDOR IMPROVEMENTS ON ROUTE 151, Mashpee: MAR1005HP, minor, term to 2027-02-16
- 810 WAKEBY ROAD, Marstons Mills: MAR1005LW, minor, term to 2027-02-16
- 850 FALMOUTH RD., Hyannis: MAR1003AY, minor, term to 2022-02-15
What stands out
- Its term runs 3 years and 94 days, November 14, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FY24 720 MAIN STREET PUMP STATION REPLACEMENT |
|---|---|
| Permittee | RJV Construction Corp. |
| NPDES ID | MAR1004WI |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 14, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Barnstable, MA 02601 |
| Subwatershed | Wequaquet Lake (HUC 010900020206) |
NPDES MAR1004WI: effluent limits and exceedances
FY24 720 MAIN STREET PUMP STATION REPLACEMENT (NPDES MAR1004WI): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1004WI: no pollutant row on file.
NPDES MAR1004WI: inspections, violations and enforcement
NPDES MAR1004WI (FY24 720 MAIN STREET PUMP STATION REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1004WI
NPDES MAR1004WI: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1004WI
NPDES MAR1004WI: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.