NPDES MAR100505 · Clean Water Act
THE GARDNER SCHOOL- DEDHAM, Dedham, MA: NPDES MAR100505 discharge permit, effluent exceedances, inspections, penalties
THE GARDNER SCHOOL- DEDHAM, Dedham, Massachusetts: General permit coverage MAR100505, held by Fortunato Construction Group, Inc; Construction stormwater; Effective; issued January 24, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,631 were issued before MAR100505.
Coverages issued nearest MAR100505
- 2024-01-23: CONLEY TERMINAL CONTAINER STORAGE PHASE I M549-C1 (BULKHEAD REPAIR), South Boston: MAR1004ZZ, held by Massachusetts Port Authority
- 2024-01-23: CONLEY TERMINAL CONTAINER STORAGE PHASE I M549-C1 (BULKHEAD REPAIR), South Boston: MAR100500, held by ACK Marine & General Contracting
- 2024-01-23: BIG Y SUPERMARKET, Uxbridge: MAR100501, held by Big Y Foods, Inc.
- 2024-01-23: THE GARDNER SCHOOL - DEDHAM, Dedham: MAR100502, held by The Gardner School
- 2024-01-24: MERRICK AT THE SQUARE, Worcester: MAR100504, held by Saloomey Construction, Inc.
- 2024-01-24: COMMERCIAL REDEVELOPMENT SITE, Lakeville: MAR100506, held by T. Sikorski Realty, LLC
- 2024-01-25: MAJESTIC MILL BROOK, Arlington: MAR100507, held by Maggiore Construction Corporation
- 2024-01-26: NEW MIXED-USE HOTEL AND RESIDENTIAL PROJECT, Lenox: MAR100509, held by BBL Lenox Hotel Group, LLC
- 2024-01-30: HAVERHILL SOLAR PROJECT, Haverhill: MAR10050C, held by Kimball Farm Feeds II, Inc.
- 2024-01-31: RECONSTRUCTION OF ROUTE 1 (LAYFAYETTE ROAD), Salisbury: MAR10050D, held by Massachusetts Department of Transportation
THE GARDNER SCHOOL- DEDHAM among its neighbors
100 discharge permits are in the Beaver Brook-Charles River subwatershed (HUC 010900010703); MAR100505 is one. Its county: 194, 3 major; MAR100505 is minor permit.
Other permits in the Beaver Brook-Charles River subwatershed (HUC 010900010703)
- 100 WEST STREET, Needham: MAR10066S, minor, term to 2027-02-16
- 101 HIGH STREET, WESTWOOD - RESIDENTIAL DEVELOPMENT, Westwood: MAR10068S, minor, term to 2027-02-16
- 1208D VFW PARKWAY, Ma: MAR1003UY, minor, term to 2027-02-16
- 151 RIVERMOOR ST, West Roxbury: MAR1005YY, minor, term to 2027-02-16
- 160 GOULD STREET OFFICE BUILDING, Needham: MA0029921
- 20 SEYON, Watertown: MAR1005WM, minor, term to 2027-02-16
- 200 TRAPELO RD, PHASE 2, IMPROVEMENTS, Waltham: MAR10065K, minor, term to 2027-02-16
- 214 LOWDER STREET, Dedham: MAR1003R0, minor, term to 2022-02-15
- 220-234 CALVARY STREET, Waltham: MAG912128, minor, term to 2027-08-01
- 33 BULLARD ROAD, WESTON PROJECT, Weston: MAR1005RS, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 23 days, January 24, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE GARDNER SCHOOL- DEDHAM |
|---|---|
| Permittee | Fortunato Construction Group, Inc |
| NPDES ID | MAR100505 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 24, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Dedham, MA 02026 |
| Subwatershed | Beaver Brook-Charles River (HUC 010900010703) |
| Other EPA IDs (FRS) | RCRA handler MAR000635094 |
NPDES MAR100505: effluent limits and exceedances
THE GARDNER SCHOOL- DEDHAM (NPDES MAR100505): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR100505: no pollutant row on file.
NPDES MAR100505: inspections, violations and enforcement
NPDES MAR100505 (THE GARDNER SCHOOL- DEDHAM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR100505
NPDES MAR100505: one email when its EPA record changes — $99/month.
Permits near NPDES MAR100505
NPDES MAR100505: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.