LINE 201-502 STRUCTURE REPLACEMENT PROJECT, Milford And Medway, MA: NPDES MAR10053R discharge permit, effluent exceedances, inspections, penalties
LINE 201-502 STRUCTURE REPLACEMENT PROJECT, Milford And Medway, Massachusetts: General permit coverage MAR10053R, held by Michels Power, Inc.; Construction stormwater; Effective; issued March 21, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,719 were issued before MAR10053R. Michels Power, Inc. holds 5 permits in Massachusetts.
Other permits held by Michels Power, Inc.
- LINE 240-510 STRUCTURE REPLACEMENT PROJECT, Natick: MAR1005EQ, issued 2024-10-10
- LINE 323 ASSET CONDITION AND REFURBISHMENT PROJECT, Millbury: MAR10065T, issued 2026-02-03
- EVERSOURCE LINE 112 EXT AND CRYSTAL SPRING SUBSTATION, Acushnet And Mattapoisett: MAR10066M, issued 2026-02-18
- LINE 132 AND 133 STRUCTURE REPLACEMENT PROJECT, Plympton: MAR1006HD, issued 2026-08-31
Coverages issued nearest MAR10053R
- 2024-03-20: 295 EASTERN AVE, Chelsea: MAR10053M, held by Eastern Chelsea Property Owner LLC
- 2024-03-20: LAKEMONT BY TOLL BROTHERS, Hudson: MAR10053N, held by Toll Bros., Inc.
- 2024-03-20: PALMER COVE PARK RENOVATION - PHASE 2, Salem: MAR10053O, held by Sciaba Construction Corp.
- 2024-03-21: 181 NEWBURY STREET, Danvers: MAR10053P, held by Construction Management & Builders, Inc.
- 2024-03-21: COTTAGE STREET HOUSING, Chelsea: MAR10053Q, held by Bald Hill Builders
- 2024-03-21: CONSTRUCTION OF A SHARED USE PATH ALONG BEARSES WAY FROM ROUTE28 TO PITCHERS WAY, Barnstable: MAR10053S, held by C.C. Construction, Inc.
- 2024-03-21: 1639 BROADWAY, Saugus: MAR10053T, held by TB Holdings, LLC
- 2024-03-21: ESSEX LANDING, Saugus: MAR10053U, held by TB Holdings, LLC
- 2024-03-22: WHISTLE STOP FARM, Westford: MAR10053W, held by Seal Harbor, LLC
- 2024-03-22: FERNALD PROPERTY IMPROVEMENTS, Waltham: MAR10053X, held by Green Acres Landscape & Construction Co, Inc.
LINE 201-502 STRUCTURE REPLACEMENT PROJECT among its neighbors
109 discharge permits are in the Headwaters Charles River subwatershed (HUC 010900010601); MAR10053R is one.
Other permits in the Headwaters Charles River subwatershed (HUC 010900010601)
- 0 HOWARD STREET, MILFORD, Milford: MAR1004SM, minor, term to 2027-02-16
- 121 GROVE STREET, FRANKLIN MA, Franklin: MAR1005MA, minor, term to 2027-02-16
- 15 LIBERTY PARKING EXPANSION, Franklin: MAR100695, minor, term to 2027-02-16
- 15 LIBERTY WAY, FRANKLIN, MA, Franklin: MANOEJ0DJ, minor, term to 2029-07-31
- 151 GROVE STREET, FRANKLIN MA, Franklin: MAR10062P, minor, term to 2027-02-16
- 160 MAPLE ST (SYSTEM #1) PHOTOVOLTAIC ARRAY, Franklin: MAR1005UN, minor, term to 2027-02-16
- 160 MAPLE ST (SYSTEM #3) PHOTOVOLTIAC SOLAR ARRAY, Bellingham: MAR1005UM, minor, term to 2027-02-16
- 20 MILFORD STREET, Medway: MAR1005WL, minor, term to 2027-02-16
- 240 SOUTH MAIN STREET, Hopedale: MAR1004XE, minor, term to 2027-02-16
- 25 FORGE PARKWAY, Franklin: MAR1004WE, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 332 days, March 21, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LINE 201-502 STRUCTURE REPLACEMENT PROJECT |
|---|---|
| Permittee | Michels Power, Inc. |
| NPDES ID | MAR10053R |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 21, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Milford And Medway, MA 02053 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Headwaters Charles River (HUC 010900010601) |
NPDES MAR10053R: effluent limits and exceedances
LINE 201-502 STRUCTURE REPLACEMENT PROJECT (NPDES MAR10053R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR10053R: no pollutant row on file.
NPDES MAR10053R: inspections, violations and enforcement
NPDES MAR10053R (LINE 201-502 STRUCTURE REPLACEMENT PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR10053R
NPDES MAR10053R: one email when its EPA record changes — $99/month.
Permits near NPDES MAR10053R
NPDES MAR10053R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.