NPDES MAR10058E · Clean Water Act
CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1, Chelsea, MA: NPDES MAR10058E discharge permit, effluent exceedances, inspections, penalties
CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1, Chelsea, Massachusetts: General permit coverage MAR10058E, held by Albanese D & S, Inc.; Construction stormwater; Effective; issued May 31, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,848 were issued before MAR10058E. Albanese D & S, Inc. holds 2 permits in Massachusetts.
Other permits held by Albanese D & S, Inc.
- #114626 ALBANESE D&S: EVERETT, MA - FERRY ST, SOUTH FERRY ST, AND ELM ST, Everett: MAR1003MW, issued 2021-12-01
Coverages issued nearest MAR10058E
- 2024-05-28: BRIDGE REPLACEMENT, B-18-002 RT.111 (MASSACHUSETTS AVE) OVER I-495, Boxboro: MAR100588, held by MAS Building & Bridge, Inc.
- 2024-05-29: LOT 2 - MILL BUILDING AND STORAGE, Tewksbury: MAR10058A, held by Cranshaw Construction
- 2024-05-29: BLACK BROOK ESTATES DEFINITIVE SUBDIVISION, East Bridgewater: MAR10058B, held by Hickory Hill Development, Inc.
- 2024-05-30: INTERSECTION IMPROVEMENTS AT TWO INTERSECTIONS ON BROADWAY, Lynn: MAR10058C, held by Massachusetts Department of Transportation
- 2024-05-30: NORTHERN STRAND EXTENSION TO NAHANT BEACH, Lynn: MAR10058D, held by Massachusetts Department of Transportation
- 2024-06-03: SWANSEA FREE PUBLIC LIBRARY EXPANSION, Swansea: MAR10058G, held by GFM Enterprises, Inc.
- 2024-06-03: DOGPATCH IMPROVEMENTS, Chicopee: MAR10058H, held by Westover Air Reserve Base
- 2024-06-03: CONLEY TERMINAL CONTAINER STORAGE PHASE II M549-C2 (TERMINAL EXPANSION), South Boston: MAR10058J, held by Massachusetts Port Authority
- 2024-06-05: LAWRENCE POLICE STATION, Lawrence: MAR100589, held by W.T. Rich Company Inc.
- 2024-06-05: SOUTH MEADOW RESERVE WETLAND RESTORATION, Carver: MAR10058K, held by Edgewood Bogs, LLC
CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1 among its neighbors
157 discharge permits are in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502); MAR10058E is one.
Other permits in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502)
- 0 SOUTH FARM ROAD, Everett: MAG912155, minor, term to 2027-08-01
- 10 & 20 EXECUTIVE DRIVE, STONEHAM, Stoneham: MAR1005SA, minor, term to 2027-02-16
- 100, 125, 150 CAMBRIDGEPARK DRIVE, Cambridge: MAR1002G8, minor, term to 2022-02-15
- 101 SMITH PLACE, Cambridge: MAR10037T, minor, term to 2022-02-15
- 1165R MASS AVE RESIDENTIAL DEVELOPMENT, Arlington: MAR1003QJ, minor, term to 2022-02-15
- 128 SPRING STREET, Everett: MAR1005EI, minor, term to 2027-02-16
- 142 MYSTIC AVENUE MEDFORD MA, Medford: MAR1004RK, minor, term to 2027-02-16
- 212 BEACHAM STREET EVERETT, MA, Everett: MAR1004Y1, minor, term to 2027-02-16
- 299 BROADWAY, Somerville: MAR10063U, minor, term to 2027-02-16
- 35 GARVEY STREET, EVERETT MA 02149, Everett: MAR1003QR, minor, term to 2022-02-15
What stands out
- Its term runs 2 years and 261 days, May 31, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1 |
|---|---|
| Permittee | Albanese D & S, Inc. |
| NPDES ID | MAR10058E |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 31, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Chelsea, MA 02150 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mystic River-Frontal Boston Harbor (HUC 010900010502) |
NPDES MAR10058E: effluent limits and exceedances
CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1 (NPDES MAR10058E): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR10058E: no pollutant row on file.
NPDES MAR10058E: inspections, violations and enforcement
NPDES MAR10058E (CHE-004 SEWER SEPARATION AND UTILITY IMPROVEMENTS - PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR10058E
NPDES MAR10058E: one email when its EPA record changes — $99/month.
Permits near NPDES MAR10058E
NPDES MAR10058E: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.