Clean Water Act discharge permit · NPDES MAR1005K3
SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN, Boston, MA: NPDES MAR1005K3 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN, held by Unified Contracting Inc., holds NPDES permit MAR1005K3. EPA’s file records it issued January 28, 2025 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN: its NPDES ID, its permit type and status, its dates, its address in Boston, Massachusetts. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MAR1005K3.
What stands out
- Its term runs 2 years and 19 days, January 28, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN |
|---|---|
| Permittee as filed | Unified Contracting Inc. |
| NPDES ID | MAR1005K3 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 28, 2025 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Boston, MA 02129 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mystic River-Frontal Boston Harbor (HUC 010900010502) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES MAR1005K3.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES MAR1005K3.
Inspections
EPA’s inspection file holds no inspection for NPDES MAR1005K3.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES MAR1005K3.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MAR1005K3.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MAR1005K3 there.
SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN, Boston, Massachusetts: Coverage under a general permit MAR1005K3, held by Unified Contracting Inc.; Construction stormwater; Effective; issued January 28, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,197 were issued before MAR1005K3.
Coverages issued nearest MAR1005K3
- 2025-01-23: CAMBRIDGE CROSSING - LOT L & LOT M, Cambridge: MAR1005JX, held by DivcoWest Real Estate Asset Management, Inc.
- 2025-01-23: CAMBRIDGE CROSSING - LOT A, LOT B, LOT C, LOT D, PARCEL 1-D & PARK 1, Cambridge: MAR1005JY, held by DivcoWest Real Estate Asset Management, Inc.
- 2025-01-23: CAMBRIDGE CROSSING - LOT R, Cambridge: MAR1005JZ, held by DivcoWest Real Estate Asset Management, Inc.
- 2025-01-24: THE LOFTS AT KETTLE BROOK FALLS, LLC, Worcester: MAR1005K0, held by The Lofts at Kettle Brook Falls, LLC
- 2025-01-27: DOUGLAS ROAD WET WEATHER FLOOD RELIEF TANK, Lowell: MAR1005K1, held by Waterline Industries Corporation
- 2025-01-28: FIELDS CORNER LIBRARY, Boston: MAR1005K4, held by J&J Contractors
- 2025-01-28: WATER RESOURCE RECOVERY FACILITY, South Dennis: MAR1005K5, held by MWH Constructors, Inc.
- 2025-01-29: SINGLE-FAMILY HOME AND ACCESS/UTILITIES 63 WEST STREET, BEVERLY, MA, Beverly: MAR1005K6, held by 63 West Street, LLC
- 2025-01-30: RESIDENCE INN NORTHSHORE MALL, Peabody: MAR1005K7, held by Callahan, Inc.
- 2025-01-30: MDR CONSTRUCTION CO. INC: SHREWSBURY, MA - MT. VIEW CEMETERY EXPANSION PROJECT, Shrewsbury: MAR1005K8, held by MDR Construction Co., Inc.
SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN among its neighbors
157 discharge permits are in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502); MAR1005K3 is one.
Other permits in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502)
- 0 SOUTH FARM ROAD, Everett: MAG912155, minor, term to 2027-08-01
- 10 & 20 EXECUTIVE DRIVE, STONEHAM, Stoneham: MAR1005SA, minor, term to 2027-02-16
- 100, 125, 150 CAMBRIDGEPARK DRIVE, Cambridge: MAR1002G8, minor, term to 2022-02-15
- 101 SMITH PLACE, Cambridge: MAR10037T, minor, term to 2022-02-15
- 1165R MASS AVE RESIDENTIAL DEVELOPMENT, Arlington: MAR1003QJ, minor, term to 2022-02-15
- 128 SPRING STREET, Everett: MAR1005EI, minor, term to 2027-02-16
- 142 MYSTIC AVENUE MEDFORD MA, Medford: MAR1004RK, minor, term to 2027-02-16
- 212 BEACHAM STREET EVERETT, MA, Everett: MAR1004Y1, minor, term to 2027-02-16
- 299 BROADWAY, Somerville: MAR10063U, minor, term to 2027-02-16
- 35 GARVEY STREET, EVERETT MA 02149, Everett: MAR1003QR, minor, term to 2022-02-15
Nearby on the register
- Discharge permits in Boston
- Every permit record in Boston, A to Z
- Discharge permits in Massachusetts
- Every permit record in Massachusetts, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
SUBSURFACE WORK FOR IMPROVEMENTS TO RYAN PLAYGROUND, CHARLESTOWN sits among 111 storm water construction permits in Boston, and 0.0% of them have a violation on file. The Mystic River-Frontal Boston Harbor subwatershed holds 157 NPDES permits on the register, including this permit. Of the 111 Boston storm water construction permits, 63.1% carry an earlier issue date than this permit.