NPDES MAR1005N2 · Clean Water Act
INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47, Watertown, MA: NPDES MAR1005N2 discharge permit, effluent exceedances, inspections, penalties
INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47, Watertown, Massachusetts: General permit coverage MAR1005N2, held by P. Gioioso & Sons, Inc.; Construction stormwater; Effective; issued March 26, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,298 were issued before MAR1005N2. P. Gioioso & Sons, Inc. holds 13 permits in Massachusetts.
Other permits held by P. Gioioso & Sons, Inc.
- CENTRAL STREET WATER/SEWER REPLACEMENT, Framingham: MAG912306, issued 2022-08-02
- PLYMOUTH STANDBY WASTEWATER FORCE MAIN, Plymouth: MAR100016, issued 2017-03-17
- COMMANDER SHEA BLVD AND NO NAME ROAD, Quincy: MAR10024X, issued 2019-07-05
- HIGHLAND AVE. / NEEDHAM ST. ROADWAY RECONSTRUCTION AND BRIDGE WIDENING PROJECT, Needham: MAR1002ZV, issued 2020-12-01
- RIVER STREET INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS, Cambridge: MAR1004AA, issued 2022-10-07
- PHASE 4 & 5 WEST LYNN SEWER SEPARATION, Lynn: MAR1004RA, issued 2023-08-14
- MBTA EAST STREET BRIDGE REPLACEMENT PROJECT, Dedham: MAR1005CJ, issued 2024-08-19
- SOUTH BOSTON SEWER SEPARATION - PHASE III, South Boston: MAR1005EZ, issued 2024-10-24
- EAST BOSTON SEWER SEPARATION PHASE IV, CONTRACT 1, East Boston: MAR10062C, issued 2025-11-20
- WALNUT, WARREN, PRINDIVILLE AND BURDETTE SEWER AND WATER IMPROVEMENTS, Framingham: MAR1006BK, issued 2026-05-13
Coverages issued nearest MAR1005N2
- 2025-03-20: 17 HARTWELL AVE, Lexington: MAR1005MV, held by Dellbrook Construction LLC
- 2025-03-23: THE RESIDENCES AT BELMONT, Belmont: MAR1005MW, held by Callahan, Inc.
- 2025-03-24: AMTRAK SOUTHAMPTON STREET MAINTENANCE FACILITY, Boston: MAR1005MX, held by Amtrak
- 2025-03-24: UML OLNEY HALL INSTRUCTIONAL MODERNIZATION, Lowell: MAR1005MZ, held by Suffolk Construction Co. Inc
- 2025-03-25: COMMERCE DRIVE, KENDALL ROAD BUSINESS PARK, Tyngsborough: MAR1005N0, held by Industrial Building Group
- 2025-03-26: SEASONS CORNER MARKET - FRAMINGHAM, Framingham: MAR1005N3, held by Kevin Leverone
- 2025-03-26: S19 TRANSMISSION LINE RIGHT-OF-WAY, Multiple Towns: MAR1005N5, held by New England Power Company
- 2025-03-27: ZERO NEW BOSTON, Woburn: MAR1005N6, held by Dellbrook | JKS
- 2025-03-27: RESIDENCES AT THE PARK, Athol: MAR1005N7, held by Aberthaw Construction Company, Inc.
- 2025-03-27: WASTEWATER COLLECTION AND WATER RESOURCE RECOVERY FACILITIES, DENNIS, MA, Dennis: MAR1005N8, held by Dig-It Construction LLC
INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47 among its neighbors
384 discharge permits are in the Charles River-Frontal Boston Harbor subwatershed (HUC 010900010704); MAR1005N2 is one.
Other permits in the Charles River-Frontal Boston Harbor subwatershed (HUC 010900010704)
- 100 NORTHERN AVENUE, Boston: MAG912127, minor, term to 2027-08-01
- 101 HAMPDEN STREET, Boston: MAR1003TB, minor, term to 2027-02-16
- 104 MAIN STREET, Watertown: MAG912191, minor, term to 2027-08-01
- 104 MAIN STREET, Watertown: MAR1005BZ, minor, term to 2027-02-16
- 121 - 139 FIRST STREET, Cambridge: MAG070443, minor, term to 2020-05-19
- 127 AMORY ST REDEVELOPMENT PROJECT, Boston: MAR1005O4, minor, term to 2027-02-16
- 127 AMORY STREET, Boston: MAR1005RC, minor, term to 2027-02-16
- 1270 COMMONWEALTH AVE, Allston: MAR1005P0, minor, term to 2027-02-16
- 136 SHAWMUT AVENUE, Boston: MAG070409, minor, term to 2020-05-19
- 14 WEST BROADWAY, Boston: MAG070411, minor, term to 2020-05-19
What stands out
- Its term runs 1 year and 327 days, March 26, 2025 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47 |
|---|---|
| Permittee | P. Gioioso & Sons, Inc. |
| NPDES ID | MAR1005N2 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 26, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Watertown, MA 02135 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Charles River-Frontal Boston Harbor (HUC 010900010704) |
NPDES MAR1005N2: effluent limits and exceedances
INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47 (NPDES MAR1005N2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005N2: no pollutant row on file.
NPDES MAR1005N2: inspections, violations and enforcement
NPDES MAR1005N2 (INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005N2
NPDES MAR1005N2: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005N2
NPDES MAR1005N2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.