NPDES MAR1005PN · Clean Water Act
AAA FACILITY, Worcester, MA: NPDES MAR1005PN discharge permit, effluent exceedances, inspections, penalties
AAA FACILITY, Worcester, Massachusetts: General permit coverage MAR1005PN, held by AAA Northeast; Construction stormwater; Effective; issued April 25, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,383 were issued before MAR1005PN.
Coverages issued nearest MAR1005PN
- 2025-04-24: ROAD RECONSTRUCTION WORK & RELOCATION OF FALL HILL BROOK CULVERT, Orange: MAR1005PI, held by Onyx Corporation
- 2025-04-24: BEL AIR DAM REMOVAL, Pittsfield: MAR1005PJ, held by SumCo Eco-Contracting
- 2025-04-25: PROPOSED SINGLE FAMILY HOME, Hampden: MAR1005PK, held by JL Construction Corp
- 2025-04-25: ST. LOUIS SPONGE PARK, Lowell: MAR1005PL, held by Ryan Wambach
- 2025-04-25: ALLSTON POST (25-39 HARVARD AVE, ALLSTON MA), Allston: MAR1005PM, held by Cranshaw Construction
- 2025-04-27: SINGLE FAMILY RESIDENCE AT 158 FOREST ST, Dunstable: MAR1005PO, held by Pete Gallagher
- 2025-04-28: 47 OLYMPIA, Amherst: MAR1005PP, held by Gagliarducci Construction
- 2025-04-28: MILL BROOK BOGS WETLAND RESTORATION PROJECT - CELLS 5, 6 AND 7 ONLY, Freetown: MAR1005PQ, held by SumCo Eco-Contracting, LLC
- 2025-04-28: ROOSEVELT ELEMENTARY SCHOOL SITE IMPROVEMENTS, Worcester: MAR1005PR, held by Jason Kruckas
- 2025-04-28: SQUANTUM ELEMENTARY SCHOOL, Quincy: MAR1005PS, held by Lee Kennedy Company, INC.
AAA FACILITY among its neighbors
39 discharge permits are in the Singletary Brook-Blackstone River subwatershed (HUC 010900030105); MAR1005PN is one.
Other permits in the Singletary Brook-Blackstone River subwatershed (HUC 010900030105)
- #608640, SUTTON/GRAFTON, BRIDGE REPLACEMENT S-33-004 DEPOT STREET, Sutton: MAR1005NK, minor, term to 2027-02-16
- 133 GRANITE STREET, Worcester: MAR1004S4, minor, term to 2027-02-16
- ATLAS GLOBAL SOLUTIONS, Sutton: MANOE3298, minor, term to 2020-09-01
- ATLAS GLOBAL SOLUTIONS, Sutton: MANOE3302, minor, term to 2020-09-01
- CALUMET COURT AND CENTENNIAL COURT, Uxbridge: MAR10061V, minor, term to 2027-02-16
- EYEPOINT PHARMACEUTICALS US, INC., Northbridge: MANOEJ0DB, minor, term to 2029-07-25
- FISHERVILLE TERRACE, Grafton: MAR10048T, minor, term to 2027-02-16
- GRAFTON WASTEWATER TREATMENT PLANT, South Grafton: MANOEJ081, minor, term to 2026-05-27
- GRAFTON WWTP, South Grafton: MAG070419, minor, term to 2020-05-19
- LINE 323 ASSET CONDITION AND REFURBISHMENT PROJECT, Millbury: MAR1005ZS, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 297 days, April 25, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AAA FACILITY |
|---|---|
| Permittee | AAA Northeast |
| NPDES ID | MAR1005PN |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 25, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Worcester, MA 01604 |
| Subwatershed | Singletary Brook-Blackstone River (HUC 010900030105) |
NPDES MAR1005PN: effluent limits and exceedances
AAA FACILITY (NPDES MAR1005PN): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005PN: no pollutant row on file.
NPDES MAR1005PN: inspections, violations and enforcement
NPDES MAR1005PN (AAA FACILITY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005PN
NPDES MAR1005PN: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005PN
NPDES MAR1005PN: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.