NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT, Adams, MA: NPDES MAR1005PV discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT, held by National Grid, holds NPDES permit MAR1005PV. EPA’s file records it issued April 30, 2025 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT: its NPDES ID, its permit type and status, its dates, its address in Adams, Massachusetts. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MAR1005PV.
What stands out
- Its term runs 1 year and 292 days, April 30, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT |
|---|---|
| Permittee as filed | National Grid |
| NPDES ID | MAR1005PV |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 30, 2025 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Adams, MA 01220 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Phillips Creek-Hoosic River (HUC 020200030603) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES MAR1005PV.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES MAR1005PV.
Inspections
EPA’s inspection file holds no inspection for NPDES MAR1005PV.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES MAR1005PV.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MAR1005PV.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MAR1005PV there.
NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT, Adams, Massachusetts: Coverage under a general permit MAR1005PV, held by National Grid; Construction stormwater; Effective; issued April 30, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,392 were issued before MAR1005PV.
Coverages issued nearest MAR1005PV
- 2025-04-28: 47 OLYMPIA, Amherst: MAR1005PP, held by Gagliarducci Construction
- 2025-04-28: MILL BROOK BOGS WETLAND RESTORATION PROJECT - CELLS 5, 6 AND 7 ONLY, Freetown: MAR1005PQ, held by SumCo Eco-Contracting, LLC
- 2025-04-28: ROOSEVELT ELEMENTARY SCHOOL SITE IMPROVEMENTS, Worcester: MAR1005PR, held by Jason Kruckas
- 2025-04-28: SQUANTUM ELEMENTARY SCHOOL, Quincy: MAR1005PS, held by Lee Kennedy Company, INC.
- 2025-04-30: MAY STREET PARK IMPROVEMENTS, Webster: MAR1005PU, held by Caracas Construction Corp.
- 2025-04-30: J&J CONTRACTORS: NEW BEDFORD, MA - ELEMENTARY SCHOOL PROJECT, New Bedford: MAR1005PW, held by J&J Contractors
- 2025-05-01: IRIS COURT, Wilmington: MAR1005PX, held by Mass Equity Investors
- 2025-05-01: CABOT YARD NORTH IMPROVEMENTS, Boston: MAR1005PY, held by RCC-SPS A Joint Venture
- 2025-05-01: PIONEER VALLEY TRANSIT AUTHORITY - COTTAGE STREET ELECTRIFICATION PHASE 02, Springfield: MAR1005PZ, held by Fontaine Bros, Inc.
- 2025-05-01: LAWRENCE MUNICIPAL AIRPORT, North Andover: MAR1005QP, held by Helfrich Bros. Boiler Works, Inc.
NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT among its neighbors
17 discharge permits are in the Phillips Creek-Hoosic River subwatershed (HUC 020200030603); MAR1005PV is one.
Other permits in the Phillips Creek-Hoosic River subwatershed (HUC 020200030603)
- ADAMS TOWN OF, Adams: MAR041246
- ADAMS W W T P, Adams: MA0100315, major, term to 2010-09-12
- ADAMS W W T P, Adams: MAG590009, minor, term to 2027-10-31
- ADAMS W W T P, Adams: MAL100315, minor, term to 2025-12-31
- ADAMS- ROUTE 8 (607328), Adams: MAR1002UJ, minor, term to 2022-02-15
- APKIN, INC.-ADAMS, Adams: MANOEJ0F5, minor, term to 2030-06-06
- GEORGE APKIN & SONS, INC., Adams: MANOE3989, minor, term to 2022-03-15
- HARBOR ROAD SOLAR 1, Cheshire: MAR100370, minor, term to 2022-02-15
- HOLLAND COMPANY, INC., Adams: MANOEJ018, minor, term to 2024-02-13
- NORTH ADAMS SEWER COLLECTION SYSTEM, North Adams: MAC020510, minor, term to 2018-03-31
Nearby on the register
- Discharge permits in Adams
- Every permit record in Adams, A to Z
- Discharge permits in Massachusetts
- Every permit record in Massachusetts, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The NATIONAL GRID LINE E131 ASSET CONDITION REFURBISHMENT PROJECT is one of 4 storm water construction permits on EPA's NPDES register in Adams, this one included, and one of 17 NPDES permits in the Phillips Creek-Hoosic River subwatershed, this one included. The permit records zero pollutants under a numeric limit and zero pollutants with an effluent exceedance.