NPDES MAR1005U6 · Clean Water Act
SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD, Medford, MA: NPDES MAR1005U6 discharge permit, effluent exceedances, inspections, penalties
SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD, Medford, Massachusetts: General permit coverage MAR1005U6, held by Massachusetts Department of Transportation; Construction stormwater; Effective; issued July 17, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,517 were issued before MAR1005U6. Massachusetts Department of Transportation holds 62 permits in Massachusetts.
Other permits held by Massachusetts Department of Transportation
- INTERSECTION IMPROVEMENTS ON BOSTON ROAD (RTE 4) AT CONCORD AND PARKER ROADS, Chelmsford: MAR10034D, issued 2021-02-24
- I-95 RESURFACING AND RELATED WORK, PEABODY TO NEWBURYPORT, MA, Peabody: MAR10034U, issued 2021-03-08
- EVERETT, MA - FERRY ST, SOUTH FERRY ST AND ELM ST, Everett: MAR1003NM, issued 2022-02-01
- INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE), Haverhill: MAR1003OK, issued 2022-01-10
- WESTBOROUGH/HOPKINTON PROJECT #606632 FRUIT ST. OVER MBTA/CSX & SUDBURY RIVER, Westborough: MAR1003YW, issued 2022-05-30
- STURBRIDGE, RESURFACING ALONG A SECTION OF I-90 PROJECT #609481, Sturbridge: MAR1003ZA, issued 2022-05-30
- AUBURN PROJECT #607556 INTERCHANGE RAMPS, I-90 EXIT 10 OVER RT. 12, Auburn: MAR1003ZB, issued 2022-05-30
- STOW, BRIDGE SUPERSTR. REPLAC, GLEASONDALE ROAD (RT. 62) OVER ASSABET RIVER, Stow: MAR1003ZG, issued 2022-05-31
- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEME, Canton/Norwood/Westwood: MAR1003ZI, issued 2022-05-31
- RECONSTRUCTION AND RELATED WORK AT MAIN STREET (ROUTE 113) - DUNSTABLE, Dunstable: MAR1003ZL, issued 2022-05-31
Coverages issued nearest MAR1005U6
- 2025-07-11: 608195-129714 IW HARDING: EASTON, MA - WASHINGTON STREET IMPROVEMENTS, Easton: MAR1005U1, held by I.W. Harding Construction Co.
- 2025-07-16: 1327 CHICOPEE- PILOT TRAVEL CENTER, Chicopee: MAR1005TW, held by Pilot Travel Centers LLC
- 2025-07-16: BRANDEIS RESIDENCE HALL, Waltham: MAR1005TZ, held by Dimeo Construction Company
- 2025-07-16: MASSDOT MEDFORD SALEM STREET ROTARY IMPROVEMENTS, Medford: MAR1005U4, held by AMRIZE
- 2025-07-17: RECONSTRUCTION AND RELATED WORK ON VFW HIGHWAY IN LOWELL, Lowell: MAR1005U5, held by Massachusetts Department of Transportation
- 2025-07-17: BURTONWOODS, Bellingham: MAR1005UB, held by Tom Betts
- 2025-07-21: CHARLES WAY, LOTS 4 THRU 8, FIVE 1-ACRE SINGLE FAMILY HOUSE LOTS, Chelmsford: MAR1005UC, held by Michael J. Shyjan & Joan M. Shyjan Revocable Trust
- 2025-07-21: LAWRENCE MANCHESTER RAIL CORRIDOR RAIL TRAIL, Lawrence: MAR1005UE, held by J.F. White Contracting Co.
- 2025-07-21: HYUNDAI METRO WEST PARKING LOT, Framingham: MAR1005UF, held by Block Builders Inc.
- 2025-07-22: BIRCH MEADOW PARK - PHASE II IMPROVEMENTS, Reading: MAR1005UH, held by Quirk Construction Corporation
SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD among its neighbors
157 discharge permits are in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502); MAR1005U6 is one.
Other permits in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502)
- 0 SOUTH FARM ROAD, Everett: MAG912155, minor, term to 2027-08-01
- 10 & 20 EXECUTIVE DRIVE, STONEHAM, Stoneham: MAR1005SA, minor, term to 2027-02-16
- 100, 125, 150 CAMBRIDGEPARK DRIVE, Cambridge: MAR1002G8, minor, term to 2022-02-15
- 101 SMITH PLACE, Cambridge: MAR10037T, minor, term to 2022-02-15
- 1165R MASS AVE RESIDENTIAL DEVELOPMENT, Arlington: MAR1003QJ, minor, term to 2022-02-15
- 128 SPRING STREET, Everett: MAR1005EI, minor, term to 2027-02-16
- 142 MYSTIC AVENUE MEDFORD MA, Medford: MAR1004RK, minor, term to 2027-02-16
- 212 BEACHAM STREET EVERETT, MA, Everett: MAR1004Y1, minor, term to 2027-02-16
- 299 BROADWAY, Somerville: MAR10063U, minor, term to 2027-02-16
- 35 GARVEY STREET, EVERETT MA 02149, Everett: MAR1003QR, minor, term to 2022-02-15
What stands out
- Its term runs 1 year and 214 days, July 17, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD |
|---|---|
| Permittee | Massachusetts Department of Transportation |
| NPDES ID | MAR1005U6 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 17, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Medford, MA 02155 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mystic River-Frontal Boston Harbor (HUC 010900010502) |
NPDES MAR1005U6: effluent limits and exceedances
SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD (NPDES MAR1005U6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005U6: no pollutant row on file.
NPDES MAR1005U6: inspections, violations and enforcement
NPDES MAR1005U6 (SALEM STREET ROTARY IMPROVEMENTS AT I-93 INTERCHANGE IN MEDFORD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005U6
NPDES MAR1005U6: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005U6
NPDES MAR1005U6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.