NPDES MAR1006B3 · Clean Water Act
IMS 3RD CENTER, Barre, MA: NPDES MAR1006B3 discharge permit, effluent exceedances, inspections, penalties
IMS 3RD CENTER, Barre, Massachusetts: General permit coverage MAR1006B3, held by Bowdoin Construction Corp.; Construction stormwater; Effective; issued May 5, 2026, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 3,033 were issued before MAR1006B3. Bowdoin Construction Corp. holds 2 permits in Massachusetts.
Other permits held by Bowdoin Construction Corp.
- WELLESLEY COLLEGE RESIDENCE HALL SWING SPACE, Wellesley: MAR1006H8, issued 2026-09-07
Coverages issued nearest MAR1006B3
- 2026-05-02: 296-324 NORTH MAIN STREET, PETERSHAM, MA, Petersham: MAR1006AZ, held by Lauring Construction Company, Inc.
- 2026-05-04: WALNUT LANE FARM RECLAMATION PROJECT, Dudley: MAR1006B0, held by Steve Landry
- 2026-05-04: 15-19 STRAWBERRY HILL STREET, DOVER, MA, Dover: MAR1006B2, held by KVC Builders LLC
- 2026-05-05: 10 & 20 EXECUTIVE DRIVE, STONEHAM, Stoneham: MAR1005SA, held by Fairfield Residential
- 2026-05-05: C133625 DAVID G ROACH: NORTHAMPTON, MA - RT 5 SHARED-USE PATH, Northampton: MAR1006AI, held by David G. Roach & Sons, Inc.
- 2026-05-05: A1/B2 ACR PHASE 5, Gardner: MAR1006B4, held by Bluroc, LLC.
- 2026-05-05: WEST MAIN STREET BRIDGE OVER NONACOICUS BROOK REPLACEMENT PROJECT, Ayer: MAR1006B5, held by Northern Construction LLC
- 2026-05-05: TAUNTON LANDFILL SOLAR DEVELOPMENT, Taunton: MAR1006B6, held by Roseberry Energy LLC
- 2026-05-05: 459 BLACKSMITH SHOP ROAD SOLAR DEVELOPMENT, Falmouth: MAR1006B7, held by Blacksmith Shop Solar LLC
- 2026-05-05: WALNUT LANE FARM RECLAMATION PROJECT, Dudley: MAR1006B8, held by James Koebke
IMS 3RD CENTER among its neighbors
2 discharge permits are in the Prince River subwatershed (HUC 010802040204); MAR1006B3 is one.
Other permits in the Prince River subwatershed (HUC 010802040204)
- H-218 & H-219, WORCESTER ROAD (RTE 122), BARRE, MA, Barre: MAR1006DL, minor, term to 2027-02-16
What stands out
- Its term runs 287 days, May 5, 2026 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | IMS 3RD CENTER |
|---|---|
| Permittee | Bowdoin Construction Corp. |
| NPDES ID | MAR1006B3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 5, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Barre, MA 01005 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Prince River (HUC 010802040204) |
NPDES MAR1006B3: effluent limits and exceedances
IMS 3RD CENTER (NPDES MAR1006B3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1006B3: no pollutant row on file.
NPDES MAR1006B3: inspections, violations and enforcement
NPDES MAR1006B3 (IMS 3RD CENTER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1006B3
NPDES MAR1006B3: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1006B3
NPDES MAR1006B3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.