Velarion Records
Free: one email when NPDES MEPIU0001 changes. Unsubscribe any time.

NPDES MEPIU0001 · Clean Water Act

FISHER ENGINEERING, Rockland, ME: NPDES MEPIU0001 discharge permit, effluent exceedances, inspections, penalties

FISHER ENGINEERING, Rockland, Maine: Individual industrial user permit MEPIU0001, held by Fisher Engineering, Inc.; Effective; issued November 29, 2024, term to November 28, 2029, by Rockland Wwtf.

FISHER ENGINEERING among its neighbors

Its county: 36, 2 major; MEPIU0001 is minor permit.

Other permits in the county

What stands out

  • Its term runs 4 years and 364 days, November 29, 2024 to November 28, 2029.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 829 discharge permits on the register in Maine; the file names no program for it, and it is a minor discharger.

Identity

FacilityFISHER ENGINEERING
PermitteeFisher Engineering, Inc.
NPDES IDMEPIU0001
StatusEffective
TypeIndividual industrial user permit
ClassMinor
Facility typeNon-POTW
IssuedNovember 29, 2024
ExpiresNovember 28, 2029
AgencyRockland Wwtf
AddressRockland, ME 04841
Other EPA IDs (FRS)RCRA handler MER000503201; ICIS-AIR source ME0000002301300727

NPDES MEPIU0001: effluent limits and exceedances

FISHER ENGINEERING (NPDES MEPIU0001): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MEPIU0001: no pollutant row on file.

NPDES MEPIU0001: inspections, violations and enforcement

NPDES MEPIU0001 (FISHER ENGINEERING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MEPIU0001

NPDES MEPIU0001: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MEPIU0001

NPDES MEPIU0001: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.