NPDES MI0058892 · Clean Water Act
DTE-FERMI 3 POWER PLT, Newport, MI: NPDES MI0058892 discharge permit, effluent exceedances, inspections, penalties
DTE-FERMI 3 POWER PLT, Newport, Michigan: Individual permit MI0058892, held by DTE Energy Company; Administratively continued; issued July 19, 2017, term to October 1, 2022, by State; Nuclear Electric Power Generation.
- Flow, in conduit or thru treatment plant: 0 limits, 244 violations of any kind.
- Oxidants, total residual: 0 limits, 183 violations of any kind.
- Temperature, water deg. fahrenheit: 0 limits, 122 violations of any kind.
- pH: 0 limits, 122 violations of any kind.
- Solids, total suspended: 0 limits, 122 violations of any kind.
- Oil & Grease: 0 limits, 122 violations of any kind.
- Total residual ooxidant-discharge time: 0 limits, 61 violations of any kind.
- Outfall observation,visual, y/n response: 0 limits, 61 violations of any kind.
- April 21, 2017: Reporting Violations - Late Submittal of DMRs (ST6).
- March 21, 2017: Reporting Violations - Late Submittal of DMRs (ST6).
- February 21, 2017: Reporting Violations - Late Submittal of DMRs (ST6).
- January 21, 2017: Reporting Violations - Late Submittal of DMRs (ST6).
Other permits held by DTE Energy Company
- DECO-BELLE RIVER PLT, China: MI0038172, issued 2018-09-28
DTE-FERMI 3 POWER PLT among its neighbors
Its county: 34, 4 major; MI0058892 is major permit.
Other permits in the county
- BEDFORD MEADOWS WWTP, Ottawa Lake: MI0026611, minor, term to 2022-10-01
- BEDFORD TWP WWTP, Erie: MI0020761, major, term to 2023-10-01
- CLEAN TECH INC-DUNDEE, Dundee: MIS510694, minor, term to 2025-04-01
- DTE-MONROE PLANT, Monroe: MI0001848, major, term to 2025-10-01
- DUNDEE CASTINGS CO, Dundee: MIS510334, minor, term to 2025-04-01
- DUNDEE WWTP, Dundee: MI0020401, minor, term to 2024-10-01
- FLAT ROCK MHP-CARLETON, Carleton: MIG580315, minor, term to 2024-04-01
- FLUID EQUIPMENT DEVELOPMENT, Monroe: MIS211089, minor, term to 2022-04-01
- GERDAU MACSTEEL, Monroe: MIS510878, minor, term to 2025-04-01
- GUARDIAN IND-CARLETON PLANT, Carleton: MI0037001, minor, term to 2022-10-01
What stands out
- Its term runs 5 years and 74 days, July 19, 2017 to October 1, 2022; the term ended 1,474 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on April 21, 2017, 3,463 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 4 events for it, all in 2017.
- It is one of 3,396 discharge permits on the register in Michigan; the file names no program for it, and it is a major discharger.
Identity
| Facility | DTE-FERMI 3 POWER PLT |
|---|---|
| Permittee | DTE Energy Company |
| NPDES ID | MI0058892 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Major |
| Facility type | Non-POTW |
| Issued | July 19, 2017 |
| Expires | October 1, 2022 |
| Agency | State |
| Address | Newport, MI 48166 |
| NAICS | 221113 – Nuclear Electric Power Generation |
| SIC | 4911 – Electric Services |
| Other EPA IDs (FRS) | RCRA handler MID087056685; ICIS-AIR source MI00000000000B4321 |
NPDES MI0058892: effluent limits and exceedances
DTE-FERMI 3 POWER PLT (NPDES MI0058892): 8 pollutants on file, 0 limited; 8 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Flow, in conduit or thru treatment plant | 0 | 244 | 0 | ||
| Oxidants, total residual | 0 | 183 | 0 | ||
| Temperature, water deg. fahrenheit | 0 | 122 | 0 | ||
| pH | 0 | 122 | 0 | ||
| Solids, total suspended | 0 | 122 | 0 | ||
| Oil & Grease | 0 | 122 | 0 | ||
| Total residual ooxidant-discharge time | 0 | 61 | 0 | ||
| Outfall observation,visual, y/n response | 0 | 61 | 0 |
NPDES MI0058892: inspections, violations and enforcement
NPDES MI0058892: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 21, 2017 | Reporting Violations - Late Submittal of DMRs | ST6 |
| March 21, 2017 | Reporting Violations - Late Submittal of DMRs | ST6 |
| February 21, 2017 | Reporting Violations - Late Submittal of DMRs | ST6 |
| January 21, 2017 | Reporting Violations - Late Submittal of DMRs | ST6 |
NPDES MI0058892 (DTE-FERMI 3 POWER PLT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MI0058892
NPDES MI0058892: one email when its EPA record changes — $99/month.
Permits near NPDES MI0058892
NPDES MI0058892: 8 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.