16 of the 27 pollutants listed for NPDES MO0098001 have no violation or effluent exceedance.
- Chlorine, total residual: 8 limits, 106 violations of any kind, 10 effluent exceedances, latest December 31, 2020, largest 99,900% over the limit.
- Oil and grease [soxhlet extr.] tot.: 22 limits, 132 violations of any kind, 2 effluent exceedances, latest November 30, 2013, largest 113% over the limit.
- Biocides: 2 limits, 2 violations of any kind, 2 effluent exceedances, latest May 31, 2020, largest 40% over the limit.
- pH: 24 limits, 196 violations of any kind, 1 effluent exceedance, latest October 31, 2020.
- Solids, total suspended: 23 limits, 126 violations of any kind.
- Boron, total recoverable: 2 limits, 88 violations of any kind.
- Nitrogen, ammonia total [as N]: 6 limits, 30 violations of any kind.
- Day - max excursion time [min]: 4 limits, 15 violations of any kind.
- Pass/Fail Static 48Hr Acute Ceriodaphnia dubia: 0 limits, 11 violations of any kind.
- LC50 Static 48Hr Acute Pimephales promelas: 0 limits, 11 violations of any kind.
- BOD, 5-day, 20 deg. C: 0 limits, 6 violations of any kind.
- Flow: 16 limits.
- Flow, in conduit or thru treatment plant: 15 limits.
- Oxygen demand, chem. [high level] [COD]: 10 limits.
- Temperature, water deg. fahrenheit: 8 limits.
- Nitrite + Nitrate total [as N]: 8 limits.
- Phosphorus, total [as P]: 8 limits.
- Nitrogen, Kjeldahl, total [TKN] [water]: 8 limits.
- Aluminum, total recoverable: 2 limits.
- Chromium, hexavalent dissolved [as Cr]: 2 limits.
- Chloride: 2 limits.
- E. coli: 2 limits.
- Toxicity [acute], Ceriodaphnia dubia: 2 limits.
- Toxicity [chronic], Ceriodaphnia dubia: 2 limits.
- Toxicity [acute], Pimephales promelas [Fathead Minnow]: 2 limits.
- Toxicity [chronic], Pimephales promelas [Fathead Minnow]: 2 limits.
- Solids, total dissolved: 2 limits.
- August 11, 2023: Permit Violations - Violation Specified in Comment (ST6).
- June 30, 2017: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
Missouri holds 210 Industrial stormwater coverages of this permit type in EPA’s file; 167 were issued before MO0098001. Union Electric Company d/b/a Ameren MO holds 2 permits in Missouri.
Other permits held by Union Electric Company d/b/a Ameren MO
- AMEREN MISSOURI - LABADIE ENERGY CENTER, Labadie: MO0004812, issued 2021-12-01
Coverages issued nearest MO0098001
- 2020-04-01: HONEYWELL PERFORMANCE MATERIALS, Columbia: MO0136948, held by Honeywell International
- 2020-04-29: CONTINENTAL CEMENT, Hannibal: MO0111686, held by Continental Cement Company, L.L.C.
- 2020-06-01: TNEMEC NKC MFG PLANT, North Kansas City: MO0139424, held by Tnemec Company, Inc.
- 2020-07-01: DOE RUN - BRUSHY CREEK MINE/MILL, Bunker: MO0001848, held by The Doe Run Company
- 2020-07-01: LAKE ROAD GENERATING STATION, St Joseph: MO0004898, held by Evergy, Inc.
- 2020-07-10: GENERAL MOTORS WENTZVILLE ASSEMBLY CNTR, Wentzville: MO0100153, held by General Motors LLC
- 2020-07-29: DYNO NOBEL - CARTHAGE, Carthage: MO0002402, held by Dyno Nobel Inc.
- 2020-08-07: COLUMBIA LANDFILL AND YARD WASTE COMPOST, Columbia: MO0112640, held by Columbia, City of
- 2020-08-17: TYSON CHICKEN - NOEL PROCESSING PLANT, Noel: MO0002500, held by Tyson Chicken, Inc.
- 2020-10-01: THE BOEING COMPANY TRACT 5, St. Charles: MO0135208, held by The Boeing Company
AMEREN MISSOURI - CALLAWAY ENERGY CENTER among its neighbors
4 discharge permits are in the Cow Creek subwatershed (HUC 103001021504); MO0098001 is one. Its county: 219, 3 major; MO0098001 is major permit.
Other permits in the Cow Creek subwatershed (HUC 103001021504)
- AMEREN MISSOURI - CALLAWAY ENERGY CENTER, Steedman: MORA20524, minor, term to 2027-02-07
- LOST CANYON LAKES LOA, Steedman: MOG760152, minor, term to 2029-08-31
- LOST CANYON LAKES WWTF, Steedman: MO0035645, minor, term to 2019-09-30
What stands out
- Its term runs 4 years and 364 days, July 1, 2020 to June 30, 2025; the term ended 471 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on August 11, 2023, 1,160 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 2 events for it, from 2017 to 2023.
- 4 of its 27 pollutants on file have an effluent exceedance (15%); 24 are under a numeric limit; the largest exceedance is Chlorine, total residual at 99,900% over its limit.
- It is one of 13,736 discharge permits on the register in Missouri; 3,317 of them (24%) are in its program, Industrial stormwater, and it is a major discharger.
Identity
| Facility | AMEREN MISSOURI - CALLAWAY ENERGY CENTER |
|---|---|
| Permittee | Union Electric Company d/b/a Ameren MO |
| NPDES ID | MO0098001 |
| Status | Effective |
| Type | Individual permit |
| Class | Major |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | July 1, 2020 |
| Expires | June 30, 2025 |
| Address | Steedman, MO 65251 |
| Receiving water | Missouri River |
| Subwatershed | Cow Creek (HUC 103001021504) |
| NAICS | 221113 – Nuclear Electric Power Generation |
| SIC | 4911 – Electric Services |
| Other EPA IDs (FRS) | RCRA handler MOD000687392; ICIS-AIR source MO0000002902700026 |
NPDES MO0098001: effluent limits and exceedances
AMEREN MISSOURI - CALLAWAY ENERGY CENTER (NPDES MO0098001): 27 pollutants on file, 24 limited; 11 with a violation of any kind, 4 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Chlorine, total residual | 8 | 106 | 10 | December 31, 2020 | 99,900% over the limit |
| Oil and grease [soxhlet extr.] tot. | 22 | 132 | 2 | November 30, 2013 | 113% over the limit |
| Biocides | 2 | 2 | 2 | May 31, 2020 | 40% over the limit |
| pH | 24 | 196 | 1 | October 31, 2020 | |
| Solids, total suspended | 23 | 126 | 0 | ||
| Boron, total recoverable | 2 | 88 | 0 | ||
| Nitrogen, ammonia total [as N] | 6 | 30 | 0 | ||
| Day - max excursion time [min] | 4 | 15 | 0 | ||
| Pass/Fail Static 48Hr Acute Ceriodaphnia dubia | 0 | 11 | 0 | ||
| LC50 Static 48Hr Acute Pimephales promelas | 0 | 11 | 0 | ||
| BOD, 5-day, 20 deg. C | 0 | 6 | 0 | ||
| Flow | 16 | 0 | 0 | ||
| Flow, in conduit or thru treatment plant | 15 | 0 | 0 | ||
| Oxygen demand, chem. [high level] [COD] | 10 | 0 | 0 | ||
| Temperature, water deg. fahrenheit | 8 | 0 | 0 | ||
| Nitrite + Nitrate total [as N] | 8 | 0 | 0 | ||
| Phosphorus, total [as P] | 8 | 0 | 0 | ||
| Nitrogen, Kjeldahl, total [TKN] [water] | 8 | 0 | 0 | ||
| Aluminum, total recoverable | 2 | 0 | 0 | ||
| Chromium, hexavalent dissolved [as Cr] | 2 | 0 | 0 | ||
| Chloride | 2 | 0 | 0 | ||
| E. coli | 2 | 0 | 0 | ||
| Toxicity [acute], Ceriodaphnia dubia | 2 | 0 | 0 | ||
| Toxicity [chronic], Ceriodaphnia dubia | 2 | 0 | 0 | ||
| Toxicity [acute], Pimephales promelas [Fathead Minnow] | 2 | 0 | 0 | ||
| Toxicity [chronic], Pimephales promelas [Fathead Minnow] | 2 | 0 | 0 | ||
| Solids, total dissolved | 2 | 0 | 0 |
NPDES MO0098001: inspections, violations and enforcement
NPDES MO0098001: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| August 11, 2023 | Permit Violations - Violation Specified in Comment | ST6 |
| June 30, 2017 | Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) | ST6 |
NPDES MO0098001 (AMEREN MISSOURI - CALLAWAY ENERGY CENTER): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MO0098001
NPDES MO0098001: one email when its EPA record changes — $99/month.
Permits near NPDES MO0098001
NPDES MO0098001: 27 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.