MOBERLY READY MIX, Moberly, MO: NPDES MOG490495 discharge permit, effluent exceedances, inspections, penalties

MOBERLY READY MIX, Moberly, Missouri: General permit coverage MOG490495, held by Moberly Ready Mix LLC; Industrial stormwater; Administratively continued; issued June 1, 2017, term to April 30, 2022; discharges to Tributary to Sugar Creek Lake; Ready-Mix Concrete Manufacturing.

  • Solids, total suspended: 2 limits, 16 violations of any kind, 12 effluent exceedances, latest March 31, 2026, largest 93% over the limit.
  • pH: 2 limits, 12 violations of any kind, 8 effluent exceedances, latest March 31, 2026.
  • Flow, in conduit or thru treatment plant: 2 limits, 8 violations of any kind.
  • Solids, settleable: 2 limits, 4 violations of any kind.
  • Oil and grease [soxhlet extr.] tot.: 2 limits, 4 violations of any kind.
  • March 31, 2026: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • March 31, 2026: Effluent Violations - Numeric effluent violation (ST6).
  • April 3, 2024: Effluent Violations - Numeric effluent violation (ST6).

Missouri holds 3,107 Industrial stormwater coverages of this permit type in EPA’s file; 606 were issued before MOG490495.

Coverages issued nearest MOG490495

MOBERLY READY MIX among its neighbors

22 discharge permits are in the Sugar Creek-East Fork Little Chariton River subwatershed (HUC 102802030204); MOG490495 is one. Its county: 82, 2 major; MOG490495 is minor permit.

Other permits in the Sugar Creek-East Fork Little Chariton River subwatershed (HUC 102802030204)

What stands out

  • Its term runs 4 years and 333 days, June 1, 2017 to April 30, 2022; the term ended 1,628 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on March 31, 2026, 197 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 2 single-event violations.
  • EPA's file dates 3 events for it, from 2024 to 2026; the busiest year is 2026 with 2.
  • 2 of its 5 pollutants on file have an effluent exceedance (40%); 5 are under a numeric limit; the largest exceedance is Solids, total suspended at 93% over its limit.
  • It is one of 13,736 discharge permits on the register in Missouri; 3,317 of them (24%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityMOBERLY READY MIX
PermitteeMoberly Ready Mix LLC
NPDES IDMOG490495
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJune 1, 2017
ExpiresApril 30, 2022
AddressMoberly, MO 65239
Receiving waterTributary to Sugar Creek Lake
SubwatershedSugar Creek-East Fork Little Chariton River (HUC 102802030204)
NAICS327320 – Ready-Mix Concrete Manufacturing
SIC3273 – Ready-Mixed Concrete

NPDES MOG490495: effluent limits and exceedances

MOBERLY READY MIX (NPDES MOG490495): 5 pollutants on file, 5 limited; 5 with a violation of any kind, 2 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended21612March 31, 202693% over the limit
pH2128March 31, 2026
Flow, in conduit or thru treatment plant280
Solids, settleable240
Oil and grease [soxhlet extr.] tot.240

NPDES MOG490495: inspections, violations and enforcement

NPDES MOG490495: 3 single-event violations

DateWhat EPA recordedAgency
March 31, 2026Reporting Violations - Improper/ Incorrect ReportingST6
March 31, 2026Effluent Violations - Numeric effluent violationST6
April 3, 2024Effluent Violations - Numeric effluent violationST6

NPDES MOG490495 (MOBERLY READY MIX): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MOG490495

NPDES MOG490495: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MOG490495

NPDES MOG490495: 5 pollutant rows, 3 dated events; ICIS-NPDES download, loaded October 14, 2026.