NPDES MOGD00553 · Clean Water Act

CROWN POINTE WWTF, Osage Beach, MO: NPDES MOGD00553 discharge permit, effluent exceedances, inspections, penalties

CROWN POINTE WWTF, Osage Beach, Missouri: General permit coverage MOGD00553, held by Crown Pointe Treatment Plant; Administratively continued; issued February 1, 2021, term to June 30, 2024; discharges to Lake of the Ozarks.

5 of the 8 pollutants listed for NPDES MOGD00553 have no violation or effluent exceedance.

  • E. coli: 2 limits, 2 violations of any kind, 2 effluent exceedances, latest September 30, 2022, largest 284% over the limit.
  • BOD, 5-day, 20 deg. C: 2 limits, 1 violation of any kind, 1 effluent exceedance, latest December 31, 2022, largest 17% over the limit.
  • Nitrogen, ammonia total [as N]: 2 limits, 1 violation of any kind, 1 effluent exceedance, latest September 30, 2025, largest 462% over the limit.
  • Oxygen, dissolved [DO]: 2 limits.
  • pH: 2 limits.
  • Solids, total suspended: 2 limits.
  • Flow, in conduit or thru treatment plant: 2 limits.
  • Chlorine, total residual: 2 limits.
  • July 27, 2026: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • July 22, 2026: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • July 22, 2026: Evaluation (S).

CROWN POINTE WWTF among its neighbors

147 discharge permits are in the Linn Creek-Lake of the Ozarks subwatershed (HUC 102901090401); MOGD00553 is one. Its county: 667, 0 major; MOGD00553 is minor permit.

Other permits in the Linn Creek-Lake of the Ozarks subwatershed (HUC 102901090401)

What stands out

  • Its term runs 3 years and 150 days, February 1, 2021 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on July 27, 2026, 50 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 2 single-event violations, 1 inspection.
  • EPA's file dates 3 events for it, all in 2026.
  • 3 of its 8 pollutants on file have an effluent exceedance (38%); 8 are under a numeric limit; the largest exceedance is Nitrogen, ammonia total [as N] at 462% over its limit.
  • It is one of 13,736 discharge permits on the register in Missouri; the file names no program for it, and it is a minor discharger.

Identity

FacilityCROWN POINTE WWTF
PermitteeCrown Pointe Treatment Plant
NPDES IDMOGD00553
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
IssuedFebruary 1, 2021
ExpiresJune 30, 2024
AddressOsage Beach, MO 65065
Receiving waterLake of the Ozarks
Receiving water impaired303(D) Listed
SubwatershedLinn Creek-Lake of the Ozarks (HUC 102901090401)

NPDES MOGD00553: effluent limits and exceedances

CROWN POINTE WWTF (NPDES MOGD00553): 8 pollutants on file, 8 limited; 3 with a violation of any kind, 3 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
E. coli222September 30, 2022284% over the limit
BOD, 5-day, 20 deg. C211December 31, 202217% over the limit
Nitrogen, ammonia total [as N]211September 30, 2025462% over the limit
Oxygen, dissolved [DO]200
pH200
Solids, total suspended200
Flow, in conduit or thru treatment plant200
Chlorine, total residual200

NPDES MOGD00553: inspections, violations and enforcement

NPDES MOGD00553: 2 single-event violations

DateWhat EPA recordedAgency
July 27, 2026Reporting Violations - Improper/ Incorrect ReportingST6
July 22, 2026Reporting Violations - Improper/ Incorrect ReportingST6

NPDES MOGD00553: 1 inspection

DateWhat EPA recordedAgency
July 22, 2026EvaluationS

NPDES MOGD00553 (CROWN POINTE WWTF): no formal enforcement action and informal enforcement action on file.

Watch NPDES MOGD00553

NPDES MOGD00553: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MOGD00553

NPDES MOGD00553: 8 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.