NPDES MOR22A262 · Clean Water Act
NEMO HARDWOODS LLC, Edina, MO: NPDES MOR22A262 discharge permit, effluent exceedances, inspections, penalties
NEMO HARDWOODS LLC, Edina, Missouri: General permit coverage MOR22A262, held by Leslie Cardwell; Industrial stormwater; Administratively continued; issued September 20, 2019, term to September 16, 2024; discharges to Tributary to N. Fk. S. Fabius R..
- Oxygen demand, chem. [high level] [COD]: 0 limits, 6 violations of any kind.
- pH: 0 limits, 6 violations of any kind.
- Solids, total suspended: 0 limits, 6 violations of any kind.
- Oil and grease [soxhlet extr.] tot.: 0 limits, 6 violations of any kind.
- Zinc, total recoverable: 0 limits, 6 violations of any kind.
- October 31, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- October 31, 2025: Permit Violations - Violation Specified in Comment (ST6).
Missouri holds 3,107 Industrial stormwater coverages of this permit type in EPA’s file; 1,893 were issued before MOR22A262.
Coverages issued nearest MOR22A262
- 2019-09-20: SOUTH SIDE LUMBER COMPANY INC, Butler: MOR22A022, held by Ronald G Jones
- 2019-09-20: MADISON COUNTY WOOD PRODUCTS - CH, Clifton Hill: MOR22A033, held by Madison County Wood Products, Inc.
- 2019-09-20: REED LUMBER CO., L.L.C., Potosi: MOR22A137, held by CARL B BARNES
- 2019-09-20: ONE FAMILY HARDWOOD LLC, St Joseph: MOR22A164, held by Steve Simpson
- 2019-09-20: D.W. GOLDIE WOOD PRODUCTS, Canton: MOR22A217, held by Douglas Goldie
- 2019-09-20: AMERICAN WALNUT COMPANY, St Joseph: MOR22A264, held by John Schmidtlein
- 2019-09-20: HARTZELL HARDWOODS KIRKSVILLE, Kirksville: MOR22A265, held by Joe Hartzell
- 2019-09-20: STUCKER BRO'S INC., Grandin: MOR22A278, held by STEVEN STUCKER
- 2019-09-20: JANES TIMBER PRODUCTS, LLC, Couch: MOR22A286, held by LARRY JANES
- 2019-09-20: R AND W CONTAINER TRANSFER STATION, Cameron: MOR80H072, held by R and W Container LLC
NEMO HARDWOODS LLC among its neighbors
3 discharge permits are in the Lower North Fork South Fabius River subwatershed (HUC 071100030105); MOR22A262 is one. Its county: 20, 0 major; MOR22A262 is minor permit.
Other permits in the Lower North Fork South Fabius River subwatershed (HUC 071100030105)
- DUTCH GARDEN NURSERY, Edina: MORA30234, minor, term to 2027-02-07
- EDINA WWTF, Edina: MO0099171, minor, term to 2022-09-30
What stands out
- Its term runs 4 years and 362 days, September 20, 2019 to September 16, 2024; the term ended 729 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on October 31, 2025, 319 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 2 single-event violations.
- EPA's file dates 2 events for it, all in 2025.
- It is one of 13,736 discharge permits on the register in Missouri; 3,317 of them (24%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | NEMO HARDWOODS LLC |
|---|---|
| Permittee | Leslie Cardwell |
| NPDES ID | MOR22A262 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | September 20, 2019 |
| Expires | September 16, 2024 |
| Address | Edina, MO 63537 |
| Receiving water | Tributary to N. Fk. S. Fabius R. |
| Subwatershed | Lower North Fork South Fabius River (HUC 071100030105) |
NPDES MOR22A262: effluent limits and exceedances
NEMO HARDWOODS LLC (NPDES MOR22A262): 5 pollutants on file, 0 limited; 5 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Oxygen demand, chem. [high level] [COD] | 0 | 6 | 0 | ||
| pH | 0 | 6 | 0 | ||
| Solids, total suspended | 0 | 6 | 0 | ||
| Oil and grease [soxhlet extr.] tot. | 0 | 6 | 0 | ||
| Zinc, total recoverable | 0 | 6 | 0 |
NPDES MOR22A262: inspections, violations and enforcement
NPDES MOR22A262: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| October 31, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| October 31, 2025 | Permit Violations - Violation Specified in Comment | ST6 |
NPDES MOR22A262 (NEMO HARDWOODS LLC): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MOR22A262
NPDES MOR22A262: one email when its EPA record changes — $99/month.
Permits near NPDES MOR22A262
NPDES MOR22A262: 5 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.