Velarion Records
Free: one email when NPDES MS0024511 changes. Unsubscribe any time.

NPDES MS0024511 · Clean Water Act

MISSISSIPPI POWER COMPANY, PLANT V J DANIEL, Moss Point, MS: NPDES MS0024511 discharge permit, effluent exceedances, inspections, penalties

MISSISSIPPI POWER COMPANY, PLANT V J DANIEL, Moss Point, Mississippi: Individual permit MS0024511, held by MISSISSIPPI POWER COMPANY, PLANT VICTOR J DANIEL; Administratively continued; issued December 30, 2015, term to November 30, 2020, by MDEQ; discharges to JACKSON COUNTY PORT AUTHORITY.

4 of the 14 pollutants listed for NPDES MS0024511 have no violation or effluent exceedance.

  • Solids, total suspended: 10 limits, 9 violations of any kind, 5 effluent exceedances, latest June 30, 2017, largest 183% over the limit.
  • pH: 8 limits, 7 violations of any kind, 3 effluent exceedances, latest May 31, 2026.
  • Iron, total recoverable: 4 limits, 6 violations of any kind, 2 effluent exceedances, latest October 31, 2022, largest 264% over the limit.
  • Oil & Grease: 6 limits, 5 violations of any kind, 1 effluent exceedance, latest December 31, 2017, largest 13% over the limit.
  • Flow, in conduit or thru treatment plant: 14 limits, 24 violations of any kind.
  • Chlorination duration: 4 limits, 6 violations of any kind.
  • Copper, total recoverable: 4 limits, 4 violations of any kind.
  • Chlorine, free available: 4 limits, 4 violations of any kind.
  • Chlorine, total residual: 6 limits, 2 violations of any kind.
  • Specific conductance: 1 limit, 2 violations of any kind.
  • BOD, 5-day, 20 deg. C: 4 limits.
  • Zinc, total recoverable: 2 limits.
  • Chromium, total recoverable: 2 limits.
  • Coliform, fecal general: 2 limits.
  • July 29, 2026: Letter of Violation/ Warning Letter (State).
  • September 8, 2025: Monitoring Violations - Analysis not Conducted (ST6).

MISSISSIPPI POWER COMPANY, PLANT V J DANIEL among its neighbors

4 discharge permits are in the Upper West Pascagoula-Pascagoula Rivers subwatershed (HUC 031700060302); MS0024511 is one. Its county: 98, 6 major; MS0024511 is minor permit.

Other permits in the Upper West Pascagoula-Pascagoula Rivers subwatershed (HUC 031700060302)

What stands out

  • Its term runs 4 years and 336 days, December 30, 2015 to November 30, 2020; the term ended 2,115 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an informal enforcement action on July 29, 2026, 48 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 informal enforcement action.
  • EPA's file dates 2 events for it, from 2025 to 2026.
  • 4 of its 14 pollutants on file have an effluent exceedance (29%); 14 are under a numeric limit; the largest exceedance is Iron, total recoverable at 264% over its limit.
  • It is one of 3,066 discharge permits on the register in Mississippi; the file names no program for it, and it is a minor discharger.

Identity

FacilityMISSISSIPPI POWER COMPANY, PLANT V J DANIEL
PermitteeMISSISSIPPI POWER COMPANY, PLANT VICTOR J DANIEL
NPDES IDMS0024511
StatusAdministratively continued
TypeIndividual permit
ClassMinor
Facility typeNon-POTW
IssuedDecember 30, 2015
ExpiresNovember 30, 2020
AgencyMDEQ
AddressMoss Point, MS 39562
Receiving waterJACKSON COUNTY PORT AUTHORITY
SubwatershedUpper West Pascagoula-Pascagoula Rivers (HUC 031700060302)
Other EPA IDs (FRS)RCRA handler MSD093546729; ICIS-AIR source MS00000028049SOUTH

NPDES MS0024511: effluent limits and exceedances

MISSISSIPPI POWER COMPANY, PLANT V J DANIEL (NPDES MS0024511): 14 pollutants on file, 14 limited; 10 with a violation of any kind, 4 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended1095June 30, 2017183% over the limit
pH873May 31, 2026
Iron, total recoverable462October 31, 2022264% over the limit
Oil & Grease651December 31, 201713% over the limit
Flow, in conduit or thru treatment plant14240
Chlorination duration460
Copper, total recoverable440
Chlorine, free available440
Chlorine, total residual620
Specific conductance120
BOD, 5-day, 20 deg. C400
Zinc, total recoverable200
Chromium, total recoverable200
Coliform, fecal general200

NPDES MS0024511: inspections, violations and enforcement

NPDES MS0024511: 1 single-event violation

DateWhat EPA recordedAgency
September 8, 2025Monitoring Violations - Analysis not ConductedST6

NPDES MS0024511: 1 informal enforcement action

DateWhat EPA recordedAgency
July 29, 2026Letter of Violation/ Warning LetterState

NPDES MS0024511 (MISSISSIPPI POWER COMPANY, PLANT V J DANIEL): no inspection and formal enforcement action on file.

Watch NPDES MS0024511

NPDES MS0024511: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MS0024511

NPDES MS0024511: 14 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.