Clean Water Act discharge permit · NPDES MSR109677
OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY, Lake Cormorant, MS: NPDES MSR109677 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY, held by Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility, holds NPDES permit MSR109677. EPA’s file records it issued December 24, 2025 and expiring January 31, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY: its NPDES ID, its permit type and status, its dates, its address in Lake Cormorant, Mississippi. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MSR109677.
Identity
| Facility as filed | OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY |
|---|---|
| Permittee as filed | Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility |
| NPDES ID | MSR109677 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Issued | December 24, 2025 |
| Expiration date | January 31, 2027 |
| Issuing agency | MDEQ |
| Address | Lake Cormorant, MS 38641 |
| Subwatershed | Lower Lake Cormorant Bayou-Coldwater River (HUC 080302040705) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES MSR109677.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES MSR109677.
Inspections
EPA’s inspection file holds no inspection for NPDES MSR109677.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES MSR109677.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MSR109677.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MSR109677 there.
OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY, Lake Cormorant, Mississippi: Coverage under a general permit MSR109677, held by Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility; Effective; issued December 24, 2025, term to January 31, 2027, by MDEQ.
OVERLAND CONTRACTING INC, ENTERGY PENTON SOLAR PHOTOVOLTAIC GENERATING FACILITY among its neighbors
3 discharge permits are in the Lower Lake Cormorant Bayou-Coldwater River subwatershed (HUC 080302040705); MSR109677 is one. Its county: 186, 3 major; MSR109677 is minor permit.
Other permits in the Lower Lake Cormorant Bayou-Coldwater River subwatershed (HUC 080302040705)
- CANAL PARK SUBDIVISION, Robinsonville: MS0056391, minor, term to 2025-04-30
- WASTE MANAGEMENT OF TUNICA LANDFILL INC, Robinsonville: MSS053317, minor, term to 2024-08-31
Nearby on the register
- Discharge permits in Lake Cormorant
- Every permit record in Lake Cormorant, A to Z
- Discharge permits in Mississippi
- Every permit record in Mississippi, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The permit held by Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility is one of 3 NPDES permits in the Lower Lake Cormorant Bayou-Coldwater River subwatershed, this one included. It also sits among 140 general permit coverages in DeSoto County, this one included, and 90.0% of those 140 coverages were issued earlier than this one. Of that same set of 140 DeSoto County coverages, 1.4% have a violation on file, and this permit has no pollutants under a numeric limit and no effluent exceedances.