MONTANA RAILROAD SERVICES, INC, Joliet, MT: NPDES MTR000139 discharge permit, effluent exceedances, inspections, penalties

MONTANA RAILROAD SERVICES, INC, Joliet, Montana: General permit coverage MTR000139, held by MONTANA RAILROAD SERVICES INC; Industrial stormwater; Administratively continued; issued April 13, 2018, term to January 31, 2023; discharges to WHITE HORSE CANAL.

  • Flow rate: 0 limits, 3 violations of any kind.
  • Oil and grease visual: 0 limits, 2 violations of any kind.
  • Solids, total suspended: 0 limits, 1 violation of any kind.
  • Total phenols: 0 limits, 1 violation of any kind.
  • Chemical Oxygen Demand [COD]: 0 limits, 1 violation of any kind.
  • June 22, 2026: Evaluation (S).
  • December 5, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • December 5, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).

Montana holds 465 Industrial stormwater coverages of this permit type in EPA’s file; 138 were issued before MTR000139.

Coverages issued nearest MTR000139

MONTANA RAILROAD SERVICES, INC among its neighbors

4 discharge permits are in the Clarks Fork Yellowstone River-Farewell Creek subwatershed (HUC 100700060805); MTR000139 is one. Its county: 66, 1 major; MTR000139 is minor permit.

Other permits in the Clarks Fork Yellowstone River-Farewell Creek subwatershed (HUC 100700060805)

What stands out

  • Its term runs 4 years and 293 days, April 13, 2018 to January 31, 2023; the term ended 1,323 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an inspection on June 22, 2026, 85 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 3 events for it, from 2019 to 2026; the busiest year is 2019 with 2.
  • It is one of 4,574 discharge permits on the register in Montana; 470 of them (10%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityMONTANA RAILROAD SERVICES, INC
PermitteeMONTANA RAILROAD SERVICES INC
NPDES IDMTR000139
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedApril 13, 2018
ExpiresJanuary 31, 2023
AddressJoliet, MT 59041
Receiving waterWHITE HORSE CANAL
Receiving water impaired303(D) Listed
SubwatershedClarks Fork Yellowstone River-Farewell Creek (HUC 100700060805)

NPDES MTR000139: effluent limits and exceedances

MONTANA RAILROAD SERVICES, INC (NPDES MTR000139): 5 pollutants on file, 0 limited; 5 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Flow rate030
Oil and grease visual020
Solids, total suspended010
Total phenols010
Chemical Oxygen Demand [COD]010

NPDES MTR000139: inspections, violations and enforcement

NPDES MTR000139: 2 single-event violations

DateWhat EPA recordedAgency
December 5, 2019WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
December 5, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6

NPDES MTR000139: 1 inspection

DateWhat EPA recordedAgency
June 22, 2026EvaluationS

NPDES MTR000139 (MONTANA RAILROAD SERVICES, INC): no formal enforcement action and informal enforcement action on file.

Watch NPDES MTR000139

NPDES MTR000139: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR000139

NPDES MTR000139: 5 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.