NPDES MTR000592 · Clean Water Act
CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT, Hardin, MT: NPDES MTR000592 discharge permit, effluent exceedances, inspections, penalties
CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT, Hardin, Montana: General permit coverage MTR000592, held by CROELL INCORPORATED; Industrial stormwater; Administratively continued; issued May 10, 2018, term to January 31, 2023; discharges to LOWER BIG HORN.
- Solids, total suspended: 2 limits, 4 violations of any kind.
- Iron, total [as Fe]: 2 limits, 4 violations of any kind.
- April 6, 2021: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- April 6, 2021: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- April 6, 2021: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- April 6, 2021: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- April 6, 2021: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
Montana holds 465 Industrial stormwater coverages of this permit type in EPA’s file; 165 were issued before MTR000592. CROELL INCORPORATED holds 8 permits in Montana.
Other permits held by CROELL INCORPORATED
- OSCARS PIT, Billings: MTG490062, issued 2024-03-20
- CARL MOORE PIT OPEN CUT PERMIT 548, Hardin: MTR000591, issued 2018-05-10
- OSCARS PIT, Billings: MTR000843, issued 2023-11-14
- BILLINGS BATCH PLANT, Billings: MTR000845, issued 2023-10-13
- EMERALD HILLS, Huntley: MTR000850, issued 2024-05-09
- RED LODGE BATCH PLANT, Red Lodge: MTR000870, issued 2024-07-17
- KUKES PIT, Laurel: MTR000926, issued 2026-07-02
Coverages issued nearest MTR000592
- 2018-04-30: PRINCE INC, Forsyth: MTR000110
- 2018-04-30: ANDERSON STEEL SUPPLY INC, Great Falls: MTR000195
- 2018-04-30: ELEVATION NEWCO LLC REGAL MINE, Dillon: MTR000509, held by BARRETTS MINERALS INC
- 2018-04-30: ELEVATION NEWCO LLC TREASURE MINE, Dillon: MTR000510, held by BARRETTS MINERALS INC
- 2018-05-10: CARL MOORE PIT OPEN CUT PERMIT 548, Hardin: MTR000591, held by CROELL INCORPORATED
- 2018-05-10: KNIFE RIVER EAST PIT, Billings: MTR000622, held by KNIFE RIVER BILLINGS
- 2018-05-16: MALMSTROM AIR FORCE BASE, Malmstrom Afb: MTR000197
- 2018-05-16: MISSOULA COUNTY AIRPORT, Missoula: MTR000295, held by MISSOULA INTERNATIONAL AIRPORT
- 2018-05-16: STILLWATER MINING COMPANY, Big Timber: MTR000503
- 2018-05-16: ELEVATION NEWCO LLC, Dillon: MTR000508, held by BARRETTS MINERALS INC
CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT among its neighbors
13 discharge permits are in the Bighorn River-Hardin subwatershed (HUC 100800150704); MTR000592 is one. Its county: 70, 3 major; MTR000592 is minor permit.
Other permits in the Bighorn River-Hardin subwatershed (HUC 100800150704)
- CITY OF HARDIN, Hardin: MTNOEIA00, minor, term to 2024-03-23
- CIVIGENICS, Hardin: MTR102264
- CMG CONSTRUCTION - HARDIN SID 120, Hardin: MTR104703, minor, term to 2012-12-31
- HARDIN - SOUTH STPS 313-1(17)1, Hardin: MTR108674, minor, term to 2022-12-31
- HARDIN WASTE WATER TREATMENT PLANT, Hardin: MTG071382
- HARDIN WASTE WATER TREATMENT PLANT, Hardin: MTR111386, minor, term to 2027-12-31
- HARDIN WASTEWATER TREATMENT PLANT, Hardin: MT0030759, major, term to 2023-06-30
- HARDIN WWTP UPGRADES, Hardin: MTR10I060, minor, term to 2027-02-16
- HARDIN, CITY OF, Hardin: MTDW0005I, minor, term to 2024-06-30
- MOSQUITO CONTROL LLC - BIG HORN PESTICIDE, Hardin: MTG870005, minor, term to 2021-10-31
What stands out
- Its term runs 4 years and 266 days, May 10, 2018 to January 31, 2023; the term ended 1,352 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on April 6, 2021, 2,017 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 5 events for it, all in 2021.
- It is one of 4,574 discharge permits on the register in Montana; 470 of them (10%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT |
|---|---|
| Permittee | CROELL INCORPORATED |
| NPDES ID | MTR000592 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | May 10, 2018 |
| Expires | January 31, 2023 |
| Address | Hardin, MT 59034 |
| Receiving water | LOWER BIG HORN |
| Subwatershed | Bighorn River-Hardin (HUC 100800150704) |
| SIC | 3273 – Ready-Mixed Concrete |
NPDES MTR000592: effluent limits and exceedances
CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT (NPDES MTR000592): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 2 | 4 | 0 | ||
| Iron, total [as Fe] | 2 | 4 | 0 |
NPDES MTR000592: inspections, violations and enforcement
NPDES MTR000592: 5 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 6, 2021 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| April 6, 2021 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| April 6, 2021 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| April 6, 2021 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| April 6, 2021 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
NPDES MTR000592 (CROELL INCORPORATED HARDIN CONCRETE BATCH PLANT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR000592
NPDES MTR000592: one email when its EPA record changes — $99/month.
Permits near NPDES MTR000592
NPDES MTR000592: 2 pollutant rows, 5 dated events; ICIS-NPDES download, loaded October 14, 2026.