NPDES MTR000675 · Clean Water Act

DILLON, MT YARD, Dillon, MT: NPDES MTR000675 discharge permit, effluent exceedances, inspections, penalties

DILLON, MT YARD, Dillon, Montana: General permit coverage MTR000675, held by United Pacific Railroad Company; Industrial stormwater; Administratively continued; issued February 27, 2020, term to January 31, 2023; discharges to BLACKTAIL DEER CREEK.

  • August 28, 2025: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • August 28, 2025: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • August 28, 2025: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • August 28, 2025: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • August 28, 2025: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • August 28, 2025: WW Storm Water Non-Construction - CWA §308 Failure to submit required permit application info (ST6).

Montana holds 465 Industrial stormwater coverages of this permit type in EPA’s file; 328 were issued before MTR000675.

Coverages issued nearest MTR000675

DILLON, MT YARD among its neighbors

6 discharge permits are in the Blacktail Deer Creek-Dillon subwatershed (HUC 100200020311); MTR000675 is one. Its county: 49, 0 major; MTR000675 is minor permit.

Other permits in the Blacktail Deer Creek-Dillon subwatershed (HUC 100200020311)

What stands out

  • Its term runs 2 years and 338 days, February 27, 2020 to January 31, 2023; the term ended 1,323 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on August 28, 2025, 383 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 6 events for it, all in 2025.
  • It is one of 4,574 discharge permits on the register in Montana; 470 of them (10%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityDILLON, MT YARD
PermitteeUnited Pacific Railroad Company
NPDES IDMTR000675
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedFebruary 27, 2020
ExpiresJanuary 31, 2023
AddressDillon, MT 59725
Receiving waterBLACKTAIL DEER CREEK
Receiving water impaired303(D) Listed
SubwatershedBlacktail Deer Creek-Dillon (HUC 100200020311)

NPDES MTR000675: effluent limits and exceedances

DILLON, MT YARD (NPDES MTR000675): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR000675: no pollutant row on file.

NPDES MTR000675: inspections, violations and enforcement

NPDES MTR000675: 6 single-event violations

DateWhat EPA recordedAgency
August 28, 2025WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
August 28, 2025WW Storm Water Non-Construction - Failure to Maintain RecordsST6
August 28, 2025WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
August 28, 2025WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
August 28, 2025WW Storm Water Non-Construction - Failure to MonitorST6
August 28, 2025WW Storm Water Non-Construction - CWA §308 Failure to submit required permit application infoST6

NPDES MTR000675 (DILLON, MT YARD): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR000675

NPDES MTR000675: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR000675

NPDES MTR000675: 0 pollutant rows, 6 dated events; ICIS-NPDES download, loaded September 15, 2026.