NPDES MTR103658 · Clean Water Act
BISON PIPELINE LLC - BISON PIPELINE PROJECT, Ekalaka, MT: NPDES MTR103658 discharge permit, effluent exceedances, inspections, penalties
BISON PIPELINE LLC - BISON PIPELINE PROJECT, Ekalaka, Montana: General permit coverage MTR103658, held by BISON PIPELINE LLC; Construction stormwater; Administratively continued; issued March 3, 2010, term to December 31, 2011, by MONTANA DEQ; discharges to MULTIPLE.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 279 were issued before MTR103658. BISON PIPELINE LLC holds 2 permits in Montana.
Other permits held by BISON PIPELINE LLC
- BISON PIPELINE PROJECT, Powderville: MTG070654, issued 2010-02-16
Coverages issued nearest MTR103658
- 2010-01-26: MDOT LOTHROP BEARMOUTH STRUCTURES, Missoula: MTR103644, held by MONTANA DEPT OF TRANSPORTATION
- 2010-01-28: DOYON GOVERNMENT GROUP - MAFB WEAPONS STORAGE AREA PHASE I, Great Falls: MTR103646, held by DOYON GOVERNMENT GROUP
- 2010-02-25: WESTERN FEDERAL LANDS - OMAD 18(46) 18(47) 18(49) MINUTEMAN MISSILE BASE ROADS, Malmstrom Air Force Base: MTR103660, held by WESTERN FEDERAL LANDS HWY DIVISION FHWA
- 2010-02-26: TUNGSTEN HOLDINGS - SINCLAIR CREEK, Eureka: MTR103664, held by TUNGSTEN HOLDINGS
- 2010-02-26: MONTANA DOT - D4 NON INTERSTATE STRUCTURE REPLACEMENT, Brockway: MTR103665, held by MONTANA DEPT OF TRANSPORTATION
- 2010-03-11: NORTHWESTERN ENERGY - COBB STORAGE NW 16 INCH LINE RPLCMT, Sweetgrass: MTR103674, held by NORTHWESTERN ENERGY
- 2010-03-12: MDOT - BUTTE AREA STRUCTURES, Butte: MTR103675, held by MONTANA DEPT OF TRANSPORTATION
- 2010-03-12: MDOT - PROJECT SUPERIOR AREA STRUCTURES, Superior: MTR103677, held by MONTANA DEPT OF TRANSPORTATION
- 2010-03-12: EOG RESOURCES - ED AND PAUL 1-17H, Lambert: MTR103681, held by EOG RESOURCES INC
- 2010-03-23: CENEX PIPELINE - CENEX PIPELINE REPLACEMENT PROJECT, Hysham: MTR103694, held by CENEX PIPELINE LLC
BISON PIPELINE LLC - BISON PIPELINE PROJECT among its neighbors
1 discharge permits are in the Buffalo Creek subwatershed (HUC 101102020403); MTR103658 is one. Its county: 21, 0 major; MTR103658 is minor permit.
What stands out
- Its term runs 1 year and 303 days, March 3, 2010 to December 31, 2011; the term ended 5,401 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BISON PIPELINE LLC - BISON PIPELINE PROJECT |
|---|---|
| Permittee | BISON PIPELINE LLC |
| NPDES ID | MTR103658 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 3, 2010 |
| Expires | December 31, 2011 |
| Agency | MONTANA DEQ |
| Address | Ekalaka, MT 59324 |
| Receiving water | MULTIPLE |
| Subwatershed | Buffalo Creek (HUC 101102020403) |
| SIC | 4922 – Natural Gas Transmission |
NPDES MTR103658: effluent limits and exceedances
BISON PIPELINE LLC - BISON PIPELINE PROJECT (NPDES MTR103658): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR103658: no pollutant row on file.
NPDES MTR103658: inspections, violations and enforcement
NPDES MTR103658 (BISON PIPELINE LLC - BISON PIPELINE PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR103658
NPDES MTR103658: one email when its EPA record changes — $99/month.
Permits near NPDES MTR103658
NPDES MTR103658: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.