NPDES MTR104569 · Clean Water Act
PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE, Hobson, MT: NPDES MTR104569 discharge permit, effluent exceedances, inspections, penalties
PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE, Hobson, Montana: General permit coverage MTR104569, held by PHILLIPS 66 PIPELINE LLC; Construction stormwater; Administratively continued; issued May 29, 2012, term to December 31, 2012, by MONTANA DEQ; discharges to JUDITH RIVER.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 530 were issued before MTR104569. PHILLIPS 66 PIPELINE LLC holds 10 permits in Montana.
Other permits held by PHILLIPS 66 PIPELINE LLC
- GLACIER PIPELINE ANOMALY MP152.5, Raynesford: MTG071341, issued 2025-02-05
- PHILLIPS 66 PIPELINE - GLACIER PIPELINE 8 AND 12, Geyser: MTR103817, issued 2010-06-24
- PHILLIPS 66 PIPELINE - GLACIER PIPELINE 10 INCH RECONDITIONING, Shepherd: MTR103950, issued 2010-10-19
- PHILLIPS 66 PIPELINE - E GALLATIN RIVER HDD CROSSING, Manhattan: MTR104581, issued 2012-06-07
- PHILLIPS 66 PIPELINE - CLARK FORK RIVER HDD AND PIPE REMOVAL MM 264.7, Gold Creek: MTR104632, issued 2012-07-23
- PHILLIPS 66 PIPELINE REMOVAL OF GROUT BAGS AND ABANDONED EAST GALLATIN CROSSING, Manhattan: MTR104693, issued 2012-08-27
- GREAT FALLS 6 LINE REROUTE, Helena: MTR106142, issued 2015-07-24
- BUNDLED HDD PIPELINE CROSSINGS - YELLOWSTONE RIVER IN BILLINGS, Billings: MTR106735, issued 2016-12-19
- GLACIER PIPELINE REPLACEMENT MP 50-64 NEAR LAVINA, Lavina: MTR108312, issued 2020-04-13
Coverages issued nearest MTR104569
- 2012-05-14: FIDELITY EXPLORATION AND PRODUCTION - KLOSE 8-17H, Sidney: MTR104553, held by FIDELITY EXPLORATION AND PRODUCTION CO
- 2012-05-21: BRIGHAM OIL AND GAS - JUDITH 10-3 1H AND 2H WARREN 15-22 1H AND 2H, Fairview: MTR104523, held by BRIGHAM OIL AND GAS LP
- 2012-05-21: BRIGHAM OIL AND GAS - SHIRLEY 13-24 1H, Fairview: MTR104558, held by BRIGHAM OIL AND GAS LP
- 2012-05-23: NORTHWESTERN ENERGY BOZEMAN COSTCO GAS LINE REROUTE PROJECT, Bozeman: MTR104560, held by NORTHWESTERN ENERGY
- 2012-05-25: KNIFE RIVER KALISPELL - BERNE CREEK ROAD RSID 152, Columbia Falls: MTR104525, held by KNIFE RIVER - KALISPELL
- 2012-05-30: GREENCORE PIPELINE CO - GREENCORE CO2 PIPELINE PROJECT, Belle Creek: MTR104562, held by GREENCORE PIPELINE CO LLC
- 2012-05-30: SCHLAUCH BOTTCHER CONSTRUCTION - LOT 137-A PH 1-2 YELLOWSTONE MTN CLUB, Big Sky: MTR104567, held by SCHLAUCH BOTTCHER CONSTRUCTION
- 2012-05-30: LS JENSEN CONSTR UPPER MILLER CREEK ROAD IMPROVEMENTS, Missoula: MTR104571, held by LS JENSEN CONSTRUCTION AND READY MIX
- 2012-05-31: TRIANGLE USA PETROLEUM - RAYMOND SVEET 31-29H, Dagmar: MTR104572, held by MARATHON OIL COMPANY
- 2012-06-04: TRIANGLE TELEPHONE COOPERATIVE - WINIFRED TO HOPP ILIAD FTTP PROJECT, Winifred: MTR104573, held by TRIANGLE TELEPHONE COOP ASSOC
PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE among its neighbors
1 discharge permits are in the Judith River-Antelope Creek subwatershed (HUC 100401030507); MTR104569 is one. Its county: 24, 0 major; MTR104569 is minor permit.
What stands out
- Its term runs 216 days, May 29, 2012 to December 31, 2012; the term ended 5,035 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE |
|---|---|
| Permittee | PHILLIPS 66 PIPELINE LLC |
| NPDES ID | MTR104569 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 29, 2012 |
| Expires | December 31, 2012 |
| Agency | MONTANA DEQ |
| Address | Hobson, MT 59452 |
| Receiving water | JUDITH RIVER |
| Subwatershed | Judith River-Antelope Creek (HUC 100401030507) |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES MTR104569: effluent limits and exceedances
PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE (NPDES MTR104569): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR104569: no pollutant row on file.
NPDES MTR104569: inspections, violations and enforcement
NPDES MTR104569 (PHILLIPS 66 PIPELINE - JUDITH RIVER HDD CROSSING GLACIER PIPE LINE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR104569
NPDES MTR104569: one email when its EPA record changes — $99/month.
Permits near NPDES MTR104569
NPDES MTR104569: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.