NPDES MTR106662 · Clean Water Act

LOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6, Big Sky, MT: NPDES MTR106662 discharge permit, effluent exceedances, inspections, penalties

LOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6, Big Sky, Montana: General permit coverage MTR106662, held by SCHLAUGH BOTTCHER CONSTRUCTION INC; Construction stormwater; Administratively continued; issued October 6, 2016, term to December 31, 2017, by MT DEQ; discharges to GALLATIN.

  • July 13, 2017: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • July 13, 2017: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
  • July 13, 2017: WW Storm Water Construction - Failure to Maintain Records (ST6).
  • July 13, 2017: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • July 13, 2017: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 901 were issued before MTR106662. SCHLAUGH BOTTCHER CONSTRUCTION INC holds 2 permits in Montana.

Other permits held by SCHLAUGH BOTTCHER CONSTRUCTION INC

Coverages issued nearest MTR106662

LOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6 among its neighbors

125 discharge permits are in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201); MTR106662 is one. Its county: 89, 0 major; MTR106662 is minor permit.

Other permits in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201)

What stands out

  • Its term runs 1 year and 86 days, October 6, 2016 to December 31, 2017; the term ended 3,180 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on July 13, 2017, 3,351 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 5 events for it, all in 2017.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityLOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6
PermitteeSCHLAUGH BOTTCHER CONSTRUCTION INC
NPDES IDMTR106662
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 6, 2016
ExpiresDecember 31, 2017
AgencyMT DEQ
AddressBig Sky, MT 59716
Receiving waterGALLATIN
Receiving water impaired303(D) Listed
SubwatershedSouth Fork West Fork Gallatin River (HUC 100200080201)

NPDES MTR106662: effluent limits and exceedances

LOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6 (NPDES MTR106662): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR106662: no pollutant row on file.

NPDES MTR106662: inspections, violations and enforcement

NPDES MTR106662: 5 single-event violations

DateWhat EPA recordedAgency
July 13, 2017WW Storm Water Construction - Failure to Conduct InspectionsST6
July 13, 2017WW Storm Water Construction - Failure to Implement SWPPP/SWMPST6
July 13, 2017WW Storm Water Construction - Failure to Maintain RecordsST6
July 13, 2017WW Storm Water Construction - Failure to properly install/implement BMPsST6
July 13, 2017WW Storm Water Construction - Failure to properly operate and maintain BMPsST6

NPDES MTR106662 (LOT 138 SPANISH PEAKS ESTATES SUBDIVISION PHASE 6): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR106662

NPDES MTR106662: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR106662

NPDES MTR106662: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.