NPDES MTR106708 · Clean Water Act
ROCKVALE - LAUREL (2 LANES), Rockvale, MT: NPDES MTR106708 discharge permit, effluent exceedances, inspections, penalties
ROCKVALE - LAUREL (2 LANES), Rockvale, Montana: General permit coverage MTR106708, held by NELCON INC; Construction stormwater; Administratively continued; issued November 21, 2016, term to December 31, 2017, by MT DEQ; discharges to Clarks Fork Yellowstone.
- October 11, 2017: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- October 11, 2017: WW Storm Water Construction - Failure to submit required report (non-DMR) (ST6).
- June 21, 2017: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- June 21, 2017: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 922 were issued before MTR106708. NELCON INC holds 28 permits in Montana.
Other permits held by NELCON INC
- NELCON - MOOSE CREEK RD N & S PROJECT NO STPS - FLA 569-1(5)14, Wise River: MTG070756, issued 2015-02-10
- NELCON - ROCKVALE NORTH (US 212/310, Rockvale: MTG070772
- NORM DYKSTRA SITE, Belgrade: MTG490032, issued 2016-07-06
- NELCON INC - GAUGLER PIT, Judith Gap: MTR103562
- NELCON - HART BORROW, Redstone: MTR104224, issued 2011-08-01
- NELCON - NELSON BORROW, Redstone: MTR104226, issued 2011-08-01
- NELCON - CHEETHAM GRAVEL, Redstone: MTR104229, issued 2011-08-03
- MDT - JCT S-374 WEST STPP 22-2(20)24, Redstone: MTR104238, issued 2011-08-15
- NELCON INC - DEICHMANN GRAVEL SITE, Hobson: MTR104287, issued 2011-09-21
- NELCON - GUSTAFSON SCORIA SITE, Culbertson: MTR104320, issued 2011-10-13
Coverages issued nearest MTR106708
- 2016-11-08: RUTLEDGE, Big Sandy: MTR106698, held by MK WEEDEN CONSTRUCTION
- 2016-11-16: SOUTH HILLS STORAGE PHASE 2, Clancy: MTR106701, held by BLACK MOUNTAIN GOLD INC
- 2016-11-16: ROUSE-OAK/STORY MILL - BOZEMAN STPIP 86-1(41)1, Bozeman: MTR106702, held by KNIFE RIVER BELGRADE
- 2016-11-16: HERITAGE 98 SWEET GRASS CREEK CHAPEL, Billings: MTR106703, held by HEADWATERS CONSTRUCTION CO
- 2016-11-16: LAUREL STATE PIT, Laurel: MTR106704, held by NELCON INC
- 2016-11-22: GREEN MEADOW SOLAR ARRAY, Helena: MTR106712, held by RIVER BEND SOLAR LLC
- 2016-11-22: HIGHWAY 191 MDT MAINTENANCE, Malta: MTR106713, held by MONTANA DEPT OF TRANSPORTATION
- 2016-11-22: GRAF STREET IMPROVEMENTS, Bozeman: MTR106715, held by YELLOWSTONE THEOLOGICAL INSTITUTE
- 2016-11-28: SIERRA ESTATES SUBDIVISION THIRD FILING PHASE III, Billings: MTR106718, held by TRAILHEAD BUILDERS
- 2016-11-30: EVERSON SITE, Laurel: MTR106720, held by NELCON INC
ROCKVALE - LAUREL (2 LANES) among its neighbors
31 discharge permits are in the Yellowstone River-Indian Creek subwatershed (HUC 100700040602); MTR106708 is one. Its county: 66, 1 major; MTR106708 is minor permit.
Other permits in the Yellowstone River-Indian Creek subwatershed (HUC 100700040602)
- 2024 ELK BASIN-BILLINGS REPLACEMENT PROJECT, Billings: MTR110625, minor, term to 2027-12-31
- BNSF LAUREL FUELING FACILITY, Laurel: MTG071408, minor, term to 2030-04-30
- BNSF LAUREL FUELING FACILITY, Laurel: MTR111573, minor, term to 2027-12-31
- BNSF RAILWAY LAUREL RAIL YARD, Laurel: MTR000484, minor, term to 2023-01-31
- CENEX LAUREL REFINERY, Laurel: MTG770010, minor, term to 2025-12-31
- CHERRY HILLS 4TH FILING, Laurel: MTR111704, minor, term to 2027-12-31
- CHS INC, Laurel: MT0000264, major, term to 2020-10-31
- CHS INC - LAUREL REFINERY, Laurel: MTR000099, minor, term to 2023-01-31
- CHS INC LAUREL REFINERY DEWATERING, Laurel: MTG070664, minor, term to 2025-02-28
- CHS- TA PARKING LOT, Laurel: MTR109646, minor, term to 2022-12-31
What stands out
- Its term runs 1 year and 40 days, November 21, 2016 to December 31, 2017; the term ended 3,180 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on October 11, 2017, 3,261 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 4 events for it, all in 2017.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ROCKVALE - LAUREL (2 LANES) |
|---|---|
| Permittee | NELCON INC |
| NPDES ID | MTR106708 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 21, 2016 |
| Expires | December 31, 2017 |
| Agency | MT DEQ |
| Address | Rockvale, MT 59041 |
| Receiving water | Clarks Fork Yellowstone |
| Subwatershed | Yellowstone River-Indian Creek (HUC 100700040602) |
NPDES MTR106708: effluent limits and exceedances
ROCKVALE - LAUREL (2 LANES) (NPDES MTR106708): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR106708: no pollutant row on file.
NPDES MTR106708: inspections, violations and enforcement
NPDES MTR106708: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| October 11, 2017 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| October 11, 2017 | WW Storm Water Construction - Failure to submit required report (non-DMR) | ST6 |
| June 21, 2017 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| June 21, 2017 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES MTR106708 (ROCKVALE - LAUREL (2 LANES)): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR106708
NPDES MTR106708: one email when its EPA record changes — $99/month.
Permits near NPDES MTR106708
NPDES MTR106708: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded September 15, 2026.