NPDES MTR106723 · Clean Water Act
TOP HAT BONNER SITE DEVELOPMENT, Bonner, MT: NPDES MTR106723 discharge permit, effluent exceedances, inspections, penalties
TOP HAT BONNER SITE DEVELOPMENT, Bonner, Montana: General permit coverage MTR106723, held by KETTLEHOUSE BREWING COMPANY; Construction stormwater; Administratively continued; issued December 5, 2016, term to December 31, 2017, by MT DEQ; discharges to BLACKFOOT.
- March 17, 2017: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- March 17, 2017: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- March 17, 2017: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 929 were issued before MTR106723. KETTLEHOUSE BREWING COMPANY holds 2 permits in Montana.
Other permits held by KETTLEHOUSE BREWING COMPANY
- KETTLEHOUSE BREWING CO - BONNER BREW HOUSE, Bonner: MTX000235, issued 2015-08-18
Coverages issued nearest MTR106723
- 2016-11-22: HIGHWAY 191 MDT MAINTENANCE, Malta: MTR106713, held by MONTANA DEPT OF TRANSPORTATION
- 2016-11-22: GRAF STREET IMPROVEMENTS, Bozeman: MTR106715, held by YELLOWSTONE THEOLOGICAL INSTITUTE
- 2016-11-28: SIERRA ESTATES SUBDIVISION THIRD FILING PHASE III, Billings: MTR106718, held by TRAILHEAD BUILDERS
- 2016-11-30: EVERSON SITE, Laurel: MTR106720, held by NELCON INC
- 2016-12-02: KIMMET RESIDENCE, Billings: MTR106722, held by CAYTON EXCAVATION INC
- 2016-12-05: CLOUD NINE HANGER, Belgrade: MTR106724, held by LANGLAS AND ASSOCIATES
- 2016-12-08: MERCANTILE RESIDENCE INN, Missoula: MTR106726, held by MERCANTILE LLC
- 2016-12-09: MEADOW CREEK COTTAGES, Bozeman: MTR106728, held by CP BUILD LLC (CADIUS PARTNERS)
- 2016-12-19: GALLACTIC PARK LOTS M49A-53A, Bozeman: MTR106729, held by CHASE-SKOGEN CONSTRUCTION INC
- 2016-12-19: GASVODA BORROW, Big Sandy: MTR106733, held by MK WEEDEN CONSTRUCTION
TOP HAT BONNER SITE DEVELOPMENT among its neighbors
8 discharge permits are in the Blackfoot River-Johnson Gulch subwatershed (HUC 170102031308); MTR106723 is one. Its county: 284, 3 major; MTR106723 is minor permit.
Other permits in the Blackfoot River-Johnson Gulch subwatershed (HUC 170102031308)
- BLACKFOOT CROSSING, Milltown: MTR111590, minor, term to 2027-12-31
- BLACKFOOT CROSSING WATER RECLAMATION FACILITY, Missoula: MT0032425
- BNSF BR 0042-0113.83, Milltown: MTR111820, minor, term to 2027-12-31
- BONNER PROPERTY DEVELOPMENT, Bonner: MT0000205, major, term to 2011-11-30
- KETTLEHOUSE BREWING CO - BONNER BREW HOUSE, Bonner: MTX000235, minor, term to 2020-09-30
- MONTANA DNRC BLACKFOOT RIVER BONNER 318, Bonner: MTB005314
- TOWN PUMP BONNER, Milltown: MTR111520, minor, term to 2027-12-31
What stands out
- Its term runs 1 year and 26 days, December 5, 2016 to December 31, 2017; the term ended 3,180 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on March 17, 2017, 3,469 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 3 events for it, all in 2017.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TOP HAT BONNER SITE DEVELOPMENT |
|---|---|
| Permittee | KETTLEHOUSE BREWING COMPANY |
| NPDES ID | MTR106723 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 5, 2016 |
| Expires | December 31, 2017 |
| Agency | MT DEQ |
| Address | Bonner, MT 59823 |
| Receiving water | BLACKFOOT |
| Subwatershed | Blackfoot River-Johnson Gulch (HUC 170102031308) |
NPDES MTR106723: effluent limits and exceedances
TOP HAT BONNER SITE DEVELOPMENT (NPDES MTR106723): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR106723: no pollutant row on file.
NPDES MTR106723: inspections, violations and enforcement
NPDES MTR106723: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 17, 2017 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| March 17, 2017 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| March 17, 2017 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
NPDES MTR106723 (TOP HAT BONNER SITE DEVELOPMENT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR106723
NPDES MTR106723: one email when its EPA record changes — $99/month.
Permits near NPDES MTR106723
NPDES MTR106723: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.