NPDES MTR106736 · Clean Water Act
WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30), West Glacier, MT: NPDES MTR106736 discharge permit, effluent exceedances, inspections, penalties
WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30), West Glacier, Montana: General permit coverage MTR106736, held by WESTERN FEDERAL LANDS HWY DIVISION FHWA; Construction stormwater; Administratively continued; issued January 3, 2017, term to December 31, 2017, by MT DEQ; discharges to Middle Fork Flathead.
- September 5, 2019: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- September 5, 2019: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- September 5, 2019: WW Storm Water Construction - Failure to Maintain Records (ST6).
- September 5, 2019: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 936 were issued before MTR106736. WESTERN FEDERAL LANDS HWY DIVISION FHWA holds 17 permits in Montana.
Other permits held by WESTERN FEDERAL LANDS HWY DIVISION FHWA
- WESTERN FED LANDS HWY DIV - LITTLE JOE CREEK 318 PERMIT, Aint Regis: MTB000209
- WESTERN FEDERAL LANDS - GOING TO THE SUN ROAD PHASE VII AVALANCHE TO WEST TUNNEL, West Glacier: MTR103628, issued 2010-01-12
- WESTERN FEDERAL LANDS - OMAD 18(46) 18(47) 18(49) MINUTEMAN MISSILE BASE ROADS, Malmstrom Air Force Base: MTR103660, issued 2010-02-25
- WESTERN FEDERAL LANDS HIGHWAY DIVISION PETTY CREEK ROAD MT PFH 71-1(1), Alberton: MTR104131, issued 2011-05-31
- WESTERN FEDERAL LANDS OMAD 18(47) OMAD 18(50) MINUTEMAN MISSILE BASE ROADS AND C, Great Falls: MTR104144, issued 2011-06-06
- WESTERN FEDERAL LANDS HWY DIVISION - APGAR TRANSIT CENTER PARKING LOT, West Glacier: MTR104683, issued 2012-08-27
- WESTERN FEDERAL LANDS FHWA - OMAD 18(48)DOG CREEK BRIDGES 1 AND 2 STERNS AUGUSTA, Great Falls: MTR104713, issued 2012-09-19
- WESTERN FEDERAL LANDS FHWA GOING TO THE SUN DR SIYEH BEND TO RISING SUN PH 12, Saint Mary: MTR104715, issued 2012-10-17
- WESTERN FEDERAL LANDS HWY DIVISION FHWA - RIMINI ROAD, Helena: MTR104778, issued 2012-11-19
- WESTERN FEDERAL LANDS FHWA - MAIDEN CANYON ROAD, Lewistown: MTR104797, issued 2012-12-11
Coverages issued nearest MTR106736
- 2016-12-08: MERCANTILE RESIDENCE INN, Missoula: MTR106726, held by MERCANTILE LLC
- 2016-12-09: MEADOW CREEK COTTAGES, Bozeman: MTR106728, held by CP BUILD LLC (CADIUS PARTNERS)
- 2016-12-19: GALLACTIC PARK LOTS M49A-53A, Bozeman: MTR106729, held by CHASE-SKOGEN CONSTRUCTION INC
- 2016-12-19: GASVODA BORROW, Big Sandy: MTR106733, held by MK WEEDEN CONSTRUCTION
- 2016-12-19: BUNDLED HDD PIPELINE CROSSINGS - YELLOWSTONE RIVER IN BILLINGS, Billings: MTR106735, held by PHILLIPS 66 PIPELINE LLC
- 2017-01-04: VALLEY VIEW DEVELOPMENT PHASE I, Missoula: MTR106737, held by MOSTAD CONSTRUCTION INC
- 2017-01-10: COTTONWOOD CORNER APARTMENTS, Bozeman: MTR106738, held by 2B HOLDINGS LLC
- 2017-01-12: OPPORTUNITY SUBDIVISION, Bozeman: MTR106741, held by BOZEMAN 6 LLC
- 2017-01-17: MDT YANKEE JIM CANYON - NORTH, Emigrant: MTR106742, held by HOLLOW CONTRACTING INC
- 2017-01-24: RUDYARD FIBER-TO-THE-PREMISE (FTTP) UPGRADE PROJECT 2017, Rudyard: MTR106743, held by TRIANGLE TELEPHONE COOPERATIVE ASSOC INC
WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30) among its neighbors
3 discharge permits are in the McDonald Creek subwatershed (HUC 170102070502); MTR106736 is one. Its county: 336, 3 major; MTR106736 is minor permit.
Other permits in the McDonald Creek subwatershed (HUC 170102070502)
- GLACIER NATIONAL PARK MCDONALD AND AVALANCHE 318, West Glacier: MTB012410
- WESTERN FEDERAL LANDS - GOING TO THE SUN ROAD PHASE VII AVALANCHE TO WEST TUNNEL, West Glacier: MTR103628, minor, term to 2011-12-31
What stands out
- Its term runs 362 days, January 3, 2017 to December 31, 2017; the term ended 3,209 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on September 5, 2019, 2,596 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 4 events for it, all in 2019.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30) |
|---|---|
| Permittee | WESTERN FEDERAL LANDS HWY DIVISION FHWA |
| NPDES ID | MTR106736 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Federal facility |
| Program | Construction stormwater |
| Issued | January 3, 2017 |
| Expires | December 31, 2017 |
| Agency | MT DEQ |
| Address | West Glacier, MT 59936 |
| Receiving water | Middle Fork Flathead |
| Subwatershed | McDonald Creek (HUC 170102070502) |
| SIC | 1611 – Highway And Street Construction |
NPDES MTR106736: effluent limits and exceedances
WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30) (NPDES MTR106736): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR106736: no pollutant row on file.
NPDES MTR106736: inspections, violations and enforcement
NPDES MTR106736: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| September 5, 2019 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| September 5, 2019 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| September 5, 2019 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| September 5, 2019 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
NPDES MTR106736 (WEST ENTRANCE TO AVALANCHE PHASE-10 MT PRA GLAC 10(30)): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR106736
NPDES MTR106736: one email when its EPA record changes — $99/month.
Permits near NPDES MTR106736
NPDES MTR106736: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.