12 MILE ROAD BACKBONE N282634, Shepherd, Montana: General permit coverage MTR107076, held by ROCKY MOUNTAIN CONTRACTORS ATTN RON FINKBEINER; Construction stormwater; Administratively continued; issued September 26, 2017, term to December 31, 2017, by MT DEQ; discharges to Upper Yellowstone-Pompeys Pillar.
- May 17, 2018: WW Storm Water Construction - Failure to Maintain Records (ST6).
- May 17, 2018: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,194 were issued before MTR107076. ROCKY MOUNTAIN CONTRACTORS ATTN RON FINKBEINER holds 3 permits in Montana.
Other permits held by ROCKY MOUNTAIN CONTRACTORS ATTN RON FINKBEINER
- CAF-27801 NORRIS ROAD #N.082018, Bozeman: MTR106793, issued 2017-03-06
- BOZEMAN PASS N048596, Bozeman: MTR106806, issued 2017-03-20
Coverages issued nearest MTR107076
- 2017-09-19: MDT BRIDGE REPLACEMENT - MF PORCUPINE CK - 11 MI S OF OPHEIM, Opheim: MTR107071, held by SLETTEN CONSTRUCTION COMPANY
- 2017-09-20: ELITE ONE SOURCE, Missoula: MTR107072, held by GRANT CREEK EXCAVATING LLC
- 2017-09-20: DRY CREEK STORAGE PIPELINE CONSTRUCTION AND VALVE PROJECT, Bridger: MTR107073, held by NORTHWESTERN ENERGY
- 2017-09-21: HUSKY STREET APARTMENTS, Kalispell: MTR107074, held by LHC INC
- 2017-09-22: HAHN PIT AND STAGING AREA FOR MDTS DEEP CREEK CANYON/MT 11-1 PROJECT, Townsend: MTR107075, held by SCHELLINGER CONSTRUCTION CO INC
- 2017-09-26: RYEN GLENN ESTATES SUBDIVISION PH 6 & 7, Belgrade: MTR107077, held by 2B HOLDINGS LLC
- 2017-09-26: BRIDGER TRANSPORTATION, Bozeman: MTR107078, held by LANGLAS AND ASSOCIATES
- 2017-09-29: RUBY RIVER STREAM RESTORATION, Twin Bridges: MTR107079, held by MILLER RECREATIONAL DEVELOPMENT
- 2017-09-29: SANDHILL RIDGE SUBDIVISION, Florence: MTR107080, held by TAMARACK CONSTRUCTION CO INC
- 2017-10-03: DOC HOLIDAY-1H, Decker: MTR107081, held by ALTA VISTA OIL CORPORATION
12 MILE ROAD BACKBONE N282634 among its neighbors
4 discharge permits are in the Yellowstone River-Cabin Creek subwatershed (HUC 100700070404); MTR107076 is one. Its county: 431, 6 major; MTR107076 is minor permit.
Other permits in the Yellowstone River-Cabin Creek subwatershed (HUC 100700070404)
- DONNES INC, Shepherd: MTG070544
- HUNTLEY FEEDERS, Huntley: MTG010105, minor, term to 2023-10-31
- SOLID CONCRETE INC, Billings: MTR000929
What stands out
- Its term runs 96 days, September 26, 2017 to December 31, 2017; the term ended 3,180 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on May 17, 2018, 3,043 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 2 events for it, all in 2018.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 12 MILE ROAD BACKBONE N282634 |
|---|---|
| Permittee | ROCKY MOUNTAIN CONTRACTORS ATTN RON FINKBEINER |
| NPDES ID | MTR107076 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 26, 2017 |
| Expires | December 31, 2017 |
| Agency | MT DEQ |
| Address | Shepherd, MT 59079 |
| Receiving water | Upper Yellowstone-Pompeys Pillar |
| Subwatershed | Yellowstone River-Cabin Creek (HUC 100700070404) |
NPDES MTR107076: effluent limits and exceedances
12 MILE ROAD BACKBONE N282634 (NPDES MTR107076): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR107076: no pollutant row on file.
NPDES MTR107076: inspections, violations and enforcement
NPDES MTR107076: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| May 17, 2018 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| May 17, 2018 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
NPDES MTR107076 (12 MILE ROAD BACKBONE N282634): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR107076
NPDES MTR107076: one email when its EPA record changes — $99/month.
Permits near NPDES MTR107076
NPDES MTR107076: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.